Permit #2018010893
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00250-0070 |
| CONDITIONED SPACE: 2582 sqft |
| GARAGE: 495 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| Total Square Footage: 3153 sqft |
| Block: 00250 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: (386)446-5161 |
| Location Address: 57 FREELAND LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/08/2018 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: BORDULIS, GEORGE & CHONG I M MCCANS |
|
Address JTWROS PALM COAST, FL 32137 |
|
Address 46 FREELAND LANE PALM COAST, FL 32137 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/08/2018 | FINAL APPROVED | WMILLER |
| Note: FINAL APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 10/24/2018 | APPROVED | CTROHA |
| ROW - FINAL INSPECTION | 10/24/2018 | FINAL APPROVED | CTROHA |
| U -UTILITY RESIDENTIAL FINAL | 10/24/2018 | APPROVED | DSPENCER |
| FINAL SURVEY (OFFICE USE ONLY) | 10/23/2018 | APPROVED | DREWIS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/17/2018 | Disapproved - NO FEE | DREWIS |
| Note: Left side property line elevations of 23.9' allows flow onto the adjacent lot, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736 | |||
| ELECTRIC - EARLY POWER | 09/18/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:30 | |||
| ROW- PRE-APRON (PRE-POUR) | 09/04/2018 | APPROVED - AS NOTED | CTROHA |
| Note: I RECOMMEND YOU GET A REVISION ON YOUR PROPOSED SITE PLAN BEFORE YOU POUR. DRIVEWAY ON PROPOSED PLAN IS 16' ACTUAL IS 13' WALKWAY NEEDS TO BE REVISED AS WELL. I SPOKE TO HUGO ON THE PHONE.*** I EXPLAINED TO HIM THAT HE WOULD BE RESPONSIBLE FOR CORRECTION IF REVISION WERE DENIED AFTER THE POUR*** It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| GRAVITY SEWER TEST | 08/22/2018 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 08/22/2018 | APPROVED | JNICHOLS |
| INSULATION | 07/23/2018 | APPROVED | WMILLER |
| LATH/BRICK/ WATER BARRIER | 07/18/2018 | APPROVED | WMILLER |
| ALL ROUGH | 07/17/2018 | APPROVED - AS NOTED | WMILLER |
| Note: 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. (kitchen sink bottom plate) improper protection.... (BY INSULATION) NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) (WHERE THE PIPE IS LESS THAN 1.5 inches FROM THE NEAREST EDGE) ALSO.... FYI EXAUST DUCTS CANNOT TERMINATE WITHIN 3 FEET OF A WINDOW (WILL CHECK FOR THIS ON FINAL) | |||
| ROOF VALLEY & METAL | 07/17/2018 | APPROVED | WMILLER |
| ALL ROUGH | 07/16/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. (kitchen sink bottom plate) 2. AIL PLATES ON ELECTRIC FBC E3802.1 (low voltage) 3. AIL PLATES ON ELECTRIC FBC E3802.1 (top of electric panell) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/25/2018 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/22/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: CONTINUOUS LOAD PATH 26 R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH | |||
| ELECTRIC-TUG | 06/08/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 3:00 | |||
| TIE BEAM / LINTEL | 05/30/2018 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 05/17/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 05/07/2018 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/30/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/19/2018 | 10/23/2018 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 10/15/2018 | 10/17/2018 |
| Note: Held By: DREWIS Final survey Left side property line elevations of 23.9' allows flow onto the adjacent lot, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736 | |||
| ZON | COMPLETE | 09/18/2018 | 09/18/2018 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 09/05/2018 | 09/06/2018 |
| Note: Released By: TDOAK | |||
| SW1 | COMPLETE | 09/05/2018 | 09/13/2018 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 09/05/2018 | 09/07/2018 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 09/05/2018 | 09/11/2018 |
| Note: Released By: MBACON | |||
| SW1 | COMPLETE | 05/16/2018 | 05/17/2018 |
| Note: Released By: DREWIS foundation | |||
| ZON | HOLD | 03/07/2018 | 03/07/2018 |
| Note: Held By: AMOBLEY Processing paperwork will release as soon as it is finished | |||
| ZON | COMPLETE | 03/07/2018 | 03/07/2018 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 02/08/2018 | 02/09/2018 |
| Note: Released By: FREODICA | |||
| ZON | HOLD | 02/08/2018 | 02/09/2018 |
| Note: Held By: AMOBLEY Termination of easement application was received. All paperwork is being processed. Permit will not be released until easement is released by City utilities as well | |||
| ELEC | COMPLETE | 02/08/2018 | 02/14/2018 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 02/08/2018 | 02/09/2018 |
| Note: Released By: FREODICA | |||
| BLD | HOLD | 01/24/2018 | 01/24/2018 |
| Note: Held By: JHINDMAN Plans shall be designed to comply with FBC 6th edition (2017). J. Hindman 986-3784. | |||
| ELEC | HOLD | 01/24/2018 | 01/25/2018 |
| Note: Held By: DREWIS Correct code referance is the FBC 6th ed. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 01/24/2018 | 02/01/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 01/24/2018 | 01/29/2018 |
| Note: Held By: FREODICA Revise energy calculations to comply with FBCEC 6th R405.4. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 01/24/2018 | 01/29/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 01/24/2018 | 01/25/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 01/24/2018 | 01/29/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 01/24/2018 | 01/25/2018 |
| Note: Held By: AMOBLEY Need a color sheet Lot 8 total sqaure footage is incorrect on the site plan A termination of easement agreement must be completed before zoning can release permit |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/08/2018 |
| REINSPECTION FEE | ¤40.00 | 11/08/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤618.00 | 03/08/2018 |
| SITE PLAN 20 | ¤20.00 | 03/08/2018 |
| SURCHARGE FS 533.721 | ¤15.18 | 03/08/2018 |
| SURCHARGE - FS 468.631 | ¤22.77 | 03/08/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/08/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/08/2018 |
| ADMIN FEE | ¤20.00 | 03/08/2018 |
| ELECTRIC FEE | ¤245.40 | 03/08/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 03/08/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 03/08/2018 |
| IMPACT FEE PARKS | ¤849.24 | 03/08/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/08/2018 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 03/08/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/08/2018 |
| MECHANICAL FEE | ¤245.40 | 03/08/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/08/2018 |
| PLAN CHECK FEE | ¤123.60 | 03/08/2018 |
| PLUMBING FEE | ¤245.40 | 03/08/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,418.17 |