I want to search for...
Permit #2018011159
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7012-00020-0200 |
| Block: 00020 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 386-931-0401 |
| Location Address: 9 BANTON LN |
| Type: DR - DRIVEWAY |
| Issue Date: 02/23/2018 |
| NOC: Unknown |
| Applicant name: RONNIE SANTOS AGUIAR |
| Owner: STROM CLAUDIA M |
|
Address 9 BLEAU COURT PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤2,372.00 |
| Job Description: DRIVEWAY REMOVE COVER PIPE INST |
| Type: CN |
Contractor
SANTOS & SONS CONCRETE
| Status | Location Address | Phone |
| INACTIVE |
PO BOX 1903 BUNNELL, FL 32110 |
386-931-0401 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 04/20/2018 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 04/20/2018 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 04/16/2018 | FINAL APPROVED | JNICHOLS |
| ROW - FINAL INSPECTION | 04/16/2018 | Disapproved - NO FEE | RGROSS |
| Note: COMPACTED MATERIAL AND SOD NEEDED ALONG ALL EDGES OF THE NEW POUR TO PREVENT WASHOUT. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/16/2018 | Disapproved - NO FEE | RGROSS |
| Note: NEEDS MORE COMPACTED DIRT AND SOD ALONG EDGES OF THE NEW POUR. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/07/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/30/2018 | 02/12/2018 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/30/2018 | 02/01/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 01/30/2018 | 02/05/2018 |
| Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ZON | COMPLETE | 01/30/2018 | 01/31/2018 |
| Note: Released By: TAWILLIAMS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 02/23/2018 |
| SITE PLAN 20 | ¤20.00 | 02/23/2018 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/23/2018 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/23/2018 |
| STORM WATER PERMIT FEES | ¤40.00 | 02/23/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.00 |