I want to search for...

Permit #2018011159

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7012-00020-0200
Block: 00020
Subdivision: 2187 - SECTION 12-BELLE TERRE
Job Phone: 386-931-0401
Location Address: 9 BANTON LN
Type: DR - DRIVEWAY
Issue Date: 02/23/2018
NOC: Unknown
Applicant name: RONNIE SANTOS AGUIAR
Owner: STROM CLAUDIA M

Address

9 BLEAU COURT

PALM COAST, FL 32137

Lot: 0200
Contracted Stated Job Value: ¤2,372.00
Job Description: DRIVEWAY REMOVE COVER PIPE INST
Type: CN

Contractor

SANTOS & SONS CONCRETE
Status Location Address Phone
INACTIVE

PO BOX 1903

BUNNELL, FL 32110

386-931-0401

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 04/20/2018 FINAL APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW - FINAL INSPECTION 04/20/2018 APPROVED RGROSS
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 04/16/2018 FINAL APPROVED JNICHOLS
ROW - FINAL INSPECTION 04/16/2018 Disapproved - NO FEE RGROSS
Note: COMPACTED MATERIAL AND SOD NEEDED ALONG ALL EDGES OF THE NEW POUR TO PREVENT WASHOUT.
ROW - FINAL APRON (AFTER POUR) 04/16/2018 Disapproved - NO FEE RGROSS
Note: NEEDS MORE COMPACTED DIRT AND SOD ALONG EDGES OF THE NEW POUR.
ROW- PRE-APRON (PRE-POUR) 03/07/2018 APPROVED - AS NOTED KHOWELL
Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/30/2018 02/12/2018
Note: Released By: TBAKER
SW1 COMPLETE 01/30/2018 02/01/2018
Note: Released By: DREWIS
UD1 COMPLETE 01/30/2018 02/05/2018
Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear.
ZON COMPLETE 01/30/2018 01/31/2018
Note: Released By: TAWILLIAMS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 02/23/2018
SITE PLAN 20 ¤20.00 02/23/2018
SURCHARGE FS 533.721 ¤2.00 02/23/2018
SURCHARGE - FS 468.631 ¤2.00 02/23/2018
STORM WATER PERMIT FEES ¤40.00 02/23/2018
Fees Total Due: ¤0.00 Total Paid: ¤84.00