I want to search for...
Permit #2018020296
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00420-0110 |
| GARAGE: 462 sqft |
| CONDITIONED SPACE: 2201 sqft |
| OPENED PORCH (WITH ROOF) : 290 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 3041 sqft |
| Block: 00420 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: (386)446-5161 |
| Location Address: 34 FENWICK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/05/2018 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: IDEAL HOMES AT PALM COAST INC INC |
|
Address PO BOX 353639 PALM COAST, FL 32135 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/02/2019 | FINAL APPROVED | MWILLIAMS |
| ROW - FINAL APRON (AFTER POUR) | 12/20/2018 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 12/20/2018 | FINAL APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 12/20/2018 | FINAL APPROVED | JNICHOLS |
| FINAL SURVEY (OFFICE USE ONLY) | 12/19/2018 | APPROVED | DREWIS |
| GRAVITY SEWER TEST | 11/21/2018 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 11/21/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 11:15 | |||
| U - SEWER TIE IN | 11/21/2018 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/01/2018 | APPROVED | RGROSS |
| Note: READY TO POUR. NOTE THAT THE PROPOSED SURVEY APPROVED THE 5 FT SETBACK FROM PROPERTY LINE WITH THE 3 FOOT SIDEWALK WRAP AROUND THE AC PAD. | |||
| INSULATION | 09/25/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| INSULATION | 09/24/2018 | CANCELLED BY APPLICANT | CMINI |
| ALL ROUGH | 09/19/2018 | APPROVED - AS NOTED | CMINI |
| Note: nail plate in master bd. rm | |||
| ALL ROUGH | 09/18/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to strap service entrance cable per NEC, nail plate on electric in closet of 1st bd. rm. and master bd.rm on 2' wall. missing duct on master bth fan | |||
| ROOF VALLEY & METAL | 09/18/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/17/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF VALLEY & METAL | 09/11/2018 | Disapproved - NO FEE | WMILLER |
| Note: must pass roof sheathing/braces/ties/down cell prior | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/11/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED APPROVED LETTER FROM TRUSS ENGINEER FOR TRUSS REPAIRS AT TRUSS A-09 (LETTER AND ENGINERING FOR REPAIR NEEDS TO MATCH CONDITION OF TRUSS AND STIPULATE PROPERE METHOD OF REPAIR) (BACK OF HOUSE) | |||
| LATH/BRICK/ WATER BARRIER | 09/11/2018 | APPROVED | WMILLER |
| Note: approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/21/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION NEED APPROVED LETTER FROM TRUSS ENGINEER FOR TRUSS REPAIRS AT TRUSS A-09 (LETTER AND ENGINERING FOR REPAIR NEEDS TO MATCH CONDITION OF TRUSS AND STIPULATE PROPERE METHOD OF REPAIR) (BACK OF HOUSE) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/20/2018 | Disapproved - NO FEE | WMILLER |
| Note: NEED LETTER FROM TRUSS ENGINEER FOR TRUSS REPAIRS AT TRUSS A-09 (BACK OF HOUSE) | |||
| ELECTRIC-TUG | 06/28/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED TUG POWER 2:52 | |||
| TIE BEAM / LINTEL | 06/25/2018 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 06/08/2018 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 05/17/2018 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/04/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/17/2018 | 12/19/2018 |
| Note: Released By: DREWIS Final Survey | |||
| ZON | COMPLETE | 12/05/2018 | 12/05/2018 |
| Note: Released By: AMOBLEY | |||
| URB | COMPLETE | 12/05/2018 | 12/06/2018 |
| Note: Released By: JBEAUDET | |||
| ZON | COMPLETE | 10/18/2018 | 10/18/2018 |
| Note: Released By: TAWILLIAMS | |||
| UD1 | COMPLETE | 10/18/2018 | 10/23/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| SW1 | COMPLETE | 10/18/2018 | 10/22/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 10/18/2018 | 10/22/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 09/11/2018 | 09/11/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 06/06/2018 | 06/07/2018 |
| Note: Released By: FREODICA foundation s | |||
| BLD | COMPLETE | 04/30/2018 | 05/01/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 04/25/2018 | 04/27/2018 |
| Note: Released By: DREWIS N/A | |||
| BLD | HOLD | 04/23/2018 | 04/25/2018 |
| Note: Held By: FREODICA Revision: Provide product approval for tile roof per FS 553.842. The plan shows the change of roof material from asphalt shingles to tile but the change was not included on the revision list. Clarify per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| MECH | COMPLETE | 04/23/2018 | 04/25/2018 |
| Note: Released By: FREODICA Revision: chnaged energy calcs. due to added hobby room. | |||
| PLUM | COMPLETE | 04/23/2018 | 04/26/2018 |
| Note: Released By: FREODICA Revision: changed sanitary riser diagram. | |||
| BLD | COMPLETE | 02/26/2018 | 02/28/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 02/26/2018 | 02/26/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 02/26/2018 | 02/26/2018 |
| Note: Released By: AMOBLEY | |||
| BLD | HOLD | 02/09/2018 | 02/12/2018 |
| Note: Held By: FREODICA Product approval numbers for exterior doors and garage door can not be found on code version 2017. Clarify per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| ELEC | COMPLETE | 02/09/2018 | 02/14/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 02/09/2018 | 02/20/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 02/09/2018 | 02/12/2018 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 02/09/2018 | 02/12/2018 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 02/09/2018 | 02/14/2018 |
| Note: Held By: DREWIS Foundation must be 1' above the crown of the road, FBC 6th ed. R4013.1.7.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 02/09/2018 | 02/16/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 02/09/2018 | 02/09/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 01/07/2019 |
| REVISION | ¤40.00 | 01/07/2019 |
| REVISION | ¤40.00 | 01/07/2019 |
| REINSPECTION FEE | ¤40.00 | 01/07/2019 |
| REINSPECTION FEE | ¤40.00 | 01/07/2019 |
| REINSPECTION FEE | ¤40.00 | 01/07/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤558.00 | 03/05/2018 |
| SITE PLAN 20 | ¤20.00 | 03/05/2018 |
| SURCHARGE FS 533.721 | ¤13.92 | 03/05/2018 |
| SURCHARGE - FS 468.631 | ¤20.88 | 03/05/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/05/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/05/2018 |
| ADMIN FEE | ¤20.00 | 03/05/2018 |
| ELECTRIC FEE | ¤227.40 | 03/05/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 03/05/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 03/05/2018 |
| IMPACT FEE PARKS | ¤849.24 | 03/05/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/05/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/05/2018 |
| MECHANICAL FEE | ¤227.40 | 03/05/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/05/2018 |
| PLAN CHECK FEE | ¤111.60 | 03/05/2018 |
| PLUMBING FEE | ¤227.40 | 03/05/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,413.52 |