Permit #2018020378
Permit Details
Status: COED
| Parcel Id: 15-11-31-1950-00000-0830 |
| CONDITIONED SPACE: 2044 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 356 sqft |
| OPENED PORCH (WITH ROOF) : 25 sqft |
| Total Square Footage: 2901 sqft |
| Block: 00000 |
| Subdivision: 1062 - FAIRWAYS EDGE AT GRAND HAVEN |
| Job Phone: 386-236-4140 |
| Location Address: 20 ST ANDREWS CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/22/2018 |
| NOC: RECORDED |
| Applicant name: MOJTABA KHORASANI BABAZADEH |
| Owner: KEATING JENNIE B |
|
Address 94 SOUTHLAKE DRIVE PALM COAST, FL 32137 |
| Lot: 0830 |
| Contracted Stated Job Value: ¤261,478.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSULTING SERVICES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
CBC1258104 (Exp: 08/31/2020) | 386-236-4140 | 386-763-7840 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
ROBERT CRAIG KULP
| Status | Location Address | State License Number | Phone |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC1816317 (Exp: 08/31/2022) | 407-886-3729 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/20/2018 | FINAL APPROVED | CMINI |
| ROW - FINAL APRON (AFTER POUR) | 09/19/2018 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 09/19/2018 | FINAL APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 09/19/2018 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 09/17/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 09/06/2018 | APPROVED | WMILLER |
| Note: TALKED TO SUSAN AT FPL | |||
| ROW- PRE-APRON (PRE-POUR) | 08/16/2018 | APPROVED | RGROSS |
| Note: READY TO POUR | |||
| U - SEWER TIE IN | 07/27/2018 | APPROVED | LFITZGERALD |
| GRAVITY SEWER TEST | 07/27/2018 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/27/2018 | APPROVED | WMILLER |
| INSULATION | 06/19/2018 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 06/01/2018 | APPROVED | CMINI |
| ALL ROUGH | 05/25/2018 | APPROVED - AS NOTED | WMILLER |
| Note: 1. FASTENERS ON ARCHED WINDOWS 2. PROTECTION OF ELECTRIC FBC E3802.1, AND 3802.3.2 OR NEC 334.15 b. (RESPECTIVELY) protection from physical damage. (AT FRIDGE BOTTOM PLATE) | |||
| WALL SHEATHING | 05/24/2018 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/24/2018 | APPROVED | WMILLER |
| ELECTRIC-TUG | 05/23/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED TUG POWER 3:30 | |||
| ROOF SHEATHING | 05/08/2018 | APPROVED | WMILLER |
| ELECTRIC-TUG | 05/03/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: RISER DIAGRAM DOES NOT MATCH WHAT IS INSTALLED, 300A-200A | |||
| TIE BEAM / LINTEL | 04/23/2018 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 04/20/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 04/09/2018 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/05/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/17/2018 | 09/17/2018 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 09/12/2018 | 09/13/2018 |
| Note: Held By: JHINDMAN final survey side yards cannot drain onto adjacent properties. J. hindman 986-3784. | |||
| ELEC | COMPLETE | 05/18/2018 | 05/21/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 04/19/2018 | 04/20/2018 |
| Note: Released By: DREWIS foundation | |||
| MECH | COMPLETE | 03/06/2018 | 03/06/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 03/06/2018 | 03/09/2018 |
| Note: Released By: DREWIS | |||
| ELEC | COMPLETE | 03/06/2018 | 03/09/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 03/06/2018 | 03/06/2018 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 02/09/2018 | 02/14/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 02/09/2018 | 02/15/2018 |
| Note: Held By: DREWIS Code to be referenced is the NEC 2014. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 02/09/2018 | 02/14/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 02/09/2018 | 02/09/2018 |
| Note: Held By: FREODICA 1. Conditioned area on eanergy calculation does not match with floor plan. Coordinate FBC 6th ed. 107.2.1. 2. Hvac plan does not match with floor plan background. Coordinate FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 02/09/2018 | 02/14/2018 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 02/09/2018 | 02/15/2018 |
| Note: Held By: DREWIS Please provide proposed survey measurements for grade at the foundation wall to assure compliance with FBC 6th ed R401.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 02/09/2018 | 02/16/2018 |
| Note: Released By: JNICHOLS This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 02/09/2018 | 02/09/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 09/21/2018 |
| REINSPECTION FEE | ¤40.00 | 09/21/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤524.00 | 03/22/2018 |
| SITE PLAN 20 | ¤20.00 | 03/22/2018 |
| SURCHARGE FS 533.721 | ¤13.20 | 03/22/2018 |
| SURCHARGE - FS 468.631 | ¤19.81 | 03/22/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/22/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/22/2018 |
| ADMIN FEE | ¤20.00 | 03/22/2018 |
| ELECTRIC FEE | ¤217.20 | 03/22/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 03/22/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 03/22/2018 |
| IMPACT FEE PARKS | ¤849.24 | 03/22/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/22/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/22/2018 |
| MECHANICAL FEE | ¤217.20 | 03/22/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/22/2018 |
| PLAN CHECK FEE | ¤104.80 | 03/22/2018 |
| PLUMBING FEE | ¤217.20 | 03/22/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,180.33 |