I want to search for...

Permit #2018020379

Permit Details

Status: COED

Parcel Id: 07-11-31-7012-00130-0430
CONDITIONED SPACE: 2248 sqft
GARAGE: 648 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
OPENED PORCH (WITH ROOF) : 319 sqft
Total Square Footage: 3258 sqft
Block: 00130
Subdivision: 2187 - SECTION 12-BELLE TERRE
Job Phone: 386-236-4140
Location Address: 22 BALLARD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/08/2018
NOC: RECORDED
Applicant name: MOJTABA KHORASANI BABAZADEH
Owner: INTERVEST CONSULTING SERVICES INC

Address

2379 BEVILLE ROAD

DAYTONA, FL 32119

Lot: 0430
Contracted Stated Job Value: ¤302,400.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSULTING SERVICES
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

CBC1258104 (Exp: 08/31/2020) 386-236-4140 386-763-7840

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
ROBERT CRAIG KULP
Status Location Address State License Number Phone
CANCEL

5401 ENERGY AIR CT

ORLANDO, FL 32810

CAC1816317 (Exp: 08/31/2022) 407-886-3729

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/16/2018 FINAL APPROVED JCOLASANTI
ROW - FINAL APRON (AFTER POUR) 10/15/2018 APPROVED RGROSS
ROW - FINAL INSPECTION 10/15/2018 FINAL APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 10/12/2018 FINAL APPROVED DSPENCER
FINAL SURVEY (OFFICE USE ONLY) 10/11/2018 APPROVED DREWIS
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 10/09/2018 Disapproved - NO FEE DREWIS
Note: Left cluvert invert too low per approved swale plan diagram. Daniel Rewis 986-4736
FOOTER 09/20/2018 APPROVED JCOLASANTI
Note: detached 12x12 slab
ROW- PRE-APRON (PRE-POUR) 09/18/2018 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 09/17/2018 Disapproved -FEE REQUIRED KHOWELL
Note: 1. SWALE PLAN NEEDS TO BE ON SITE FOR THIS INSPECTION 2. CULVERT IS NOT 7'-7" TO CENTER LINE ON LEFT SIDE 3. 2" OF CONCRETE REQUORED OVER THE OPENING OF THE CULVERT PIPE 4. CONCRETE NOT ALLOWED TO BE POURED INTO THE SWALE AREA PAST THE END FORM. 5. ADD A ROAD FORM BOARD SO THE NEW DRIVEWAY IS ALLIGNED WITH THE EXISTING EDGE OF PAVEMENT 6. COMPACT PAD AREA AND REMOVE DEBRIS
ELECTRIC - EARLY POWER 09/13/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 11:50
LATH/BRICK/ WATER BARRIER 07/20/2018 APPROVED CMINI
GRAVITY SEWER TEST 07/16/2018 APPROVED JGIBSON
U - SEWER TIE IN 07/16/2018 APPROVED JNICHOLS
INSULATION 07/16/2018 APPROVED JCOLASANTI
ALL ROUGH 07/11/2018 APPROVED - AS NOTED JCOLASANTI
Note: need tests on water and waste lines by insulation, secure water ines and fixture guest bath tub
ELECTRIC-TUG 07/11/2018 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION SPOKE TO DELL FPL RELEASED TUG POWER 3:30
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/03/2018 APPROVED - AS NOTED JCOLASANTI
Note: need engineering and strap to header truss A03 FBC802 check at all rough
ROOF VALLEY & METAL 06/25/2018 APPROVED JCOLASANTI
ELECTRIC-TUG 06/25/2018 Disapproved -FEE REQUIRED RMARTIN
Note: RISER DIAGRAM DOES NOT MATCH WHAT IS INSTALLED, DIAGRAM SHOWING 200A, 300A IS INSTALLED, NEED REVISION
ELECTRIC-TUG 06/11/2018 CANCELLED BY APPLICANT AIRS WEB
ROOF SHEATHING 06/04/2018 APPROVED WMILLER
TIE BEAM / LINTEL 05/08/2018 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 05/04/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: per jean missing dowels and dowel clearance all marked on plans
FOUND SURVEY APPROVED (OFFICE) 05/03/2018 APPROVED DREWIS
MONOLITHIC SLAB 04/20/2018 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 04/19/2018 Disapproved - NO FEE JCOLASANTI
Note: THIS IS A REINSPECTION CONCRETE FORMS SHALL PROVIDE SUFFICIENT STRENGTH TO CONTAIN CONCRET DURING THE PLACEMENT OPERATION (STAY IN PLACE FORMS) FBC404.1.2.3.6.....MINIMUM DEPTH ON FOOTERS UNDISTURBED SOIL..FBC..403.1.4 also look at right sid exterior footing need tomake sure 3" coverage
MONOLITHIC SLAB 04/18/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION CLEARANCE ON REBAR FROM EARTH 3 1D FBC 403 (marked on plan rear porch)
MONOLITHIC SLAB 04/16/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: CONCRETE FORMS SHALL PROVIDE SUFFICIENT STRENGTH TO CONTAIN CONCRET DURING THE PLACEMENT OPERATION (STAY IN PLACE FORMS) FBC404.1.2.3.6.....MINIMUM DEPTH ON FOOTERS UNDISTURBED SOIL..FBC..403.1.4
PLUMBING 1ST ROUGH UNDERGROUND 04/12/2018 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 10/10/2018 10/11/2018
Note: Released By: DREWIS final
SW1 HOLD 10/05/2018 10/09/2018
Note: Held By: DREWIS Left cluvert invert too low per approved swale plan diagram. Daniel Rewis 986-4736
ZON COMPLETE 06/27/2018 06/27/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 06/13/2018 06/19/2018
Note: Released By: DREWIS
SW1 COMPLETE 06/13/2018 06/19/2018
Note: Released By: DREWIS
ZON HOLD 06/13/2018 06/13/2018
Note: Held By: AMOBLEY Concrete patio must meet the minimum 10ft rear setback
SW1 COMPLETE 05/02/2018 05/03/2018
Note: Released By: DREWIS foundation s
SW1 COMPLETE 03/01/2018 03/07/2018
Note: Released By: DREWIS
ELEC COMPLETE 03/01/2018 03/07/2018
Note: Released By: DREWIS
ZON COMPLETE 03/01/2018 03/01/2018
Note: Released By: AMOBLEY
BLD COMPLETE 02/09/2018 02/09/2018
Note: Released By: FREODICA
ELEC HOLD 02/09/2018 02/15/2018
Note: Held By: DREWIS Code to be referenced is the NEC 2014. Please provide calculations. Additional GFCI needed in Laundry, 210.52F. Additional receptacle needed in bedroom bordering garage, behind door swing, 210.52. Daniel Rewis 986-4736
ENGIN1 COMPLETE 02/09/2018 02/20/2018
Note: Released By: TBAKER
MECH COMPLETE 02/09/2018 02/09/2018
Note: Released By: FREODICA
PLUM COMPLETE 02/09/2018 02/09/2018
Note: Released By: FREODICA
SW1 HOLD 02/09/2018 02/15/2018
Note: Held By: DREWIS Please provide proposed survey measurements 10' away from foundation wall to assure compliance with FBC 6th ed. R401.3. Daniel Rewis 986-4736
UD1 COMPLETE 02/09/2018 02/16/2018
Note: Released By: JNICHOLS This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.Released By: JNICHOLS
ZON COMPLETE 02/09/2018 02/09/2018
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/17/2018
REINSPECTION FEE ¤40.00 10/17/2018
REINSPECTION FEE ¤40.00 10/17/2018
REINSPECTION FEE ¤40.00 10/17/2018
REINSPECTION FEE ¤40.00 10/17/2018
NEW RESIDENTIAL INSPECTIONS ¤606.00 03/08/2018
SITE PLAN 20 ¤20.00 03/08/2018
SURCHARGE FS 533.721 ¤14.93 03/08/2018
SURCHARGE - FS 468.631 ¤22.39 03/08/2018
STORM WATER PERMIT FEES ¤80.00 03/08/2018
3% TRANS IMPACT FEE CREDIT (¤93.74) 03/08/2018
ADMIN FEE ¤20.00 03/08/2018
ELECTRIC FEE ¤241.80 03/08/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 03/08/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 03/08/2018
IMPACT FEE PARKS ¤849.24 03/08/2018
IMPACT FEE SCHOOL ¤3,600.00 03/08/2018
IMPACT FEE TRANSPORTATION ¤3,124.67 03/08/2018
MECHANICAL FEE ¤241.80 03/08/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 03/08/2018
PLAN CHECK FEE ¤121.20 03/08/2018
PLUMBING FEE ¤241.80 03/08/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,476.84