Permit #2018021220

Permit Details

Status: FINAL

Parcel Id: 39-12-31-3380-00000-0080
Block: 00000
Subdivision: 2141 - KINGS POINTE COMMERCIAL SUBDIVISION
Job Phone: 407-791-9000
Location Address: 6100 STATE RD 100 E
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 06/06/2018
NOC: Unknown
Applicant name: ASHLEY RAY RUMBLE
Owner: LOT 8 KINGS POINTE LLC

Address

2 LAMBERT COVE

FLAGLER BEACH, FL 32136

Lot: 0080
Contracted Stated Job Value: ¤539,552.00
Job Description: RACETRAC GAS STATION - SITE WORK
Type: CN

Contractor

CCS CONSTRUCTION , LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

2345 W SAND LAKE ROAD

ORLANDO, FL 32809

SUITE 100

ORLANDO, FL 32809

CBC1257461 (Exp: 08/31/2026) 407-791-9000

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 12/12/2018 APPROVED DRAMIREZ
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 12/12/2018 APPROVED MBACON
Note: As-builts were approved under application AR # 3836
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 12/11/2018 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
UC-FINAL SITE INSPECTION 12/11/2018 APPROVED MBACON
Note: THIS IS A REINSPECTION
U - UTILITY COMMERCIAL FINAL 12/11/2018 FINAL APPROVED MBACON
Note: THIS IS A REINSPECTION
LDSC- LANDSCAPE FINAL 12/10/2018 APPROVED - AS NOTED BDAWSON
Note: Front viburnum hedge shocked out due to irrigation issue. Allowing time to see if plant material bounces back from skock, but if any hedges die replace them prior to end of 1 year warranty.
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 12/07/2018 APPROVED BDAWSON
Note: THIS IS A REINSPECTION
LDSC- LANDSCAPE FINAL 12/07/2018 CANCELLED BY APPLICANT BDAWSON
Note: THIS IS A REINSPECTION
UC-FINAL SITE INSPECTION 12/07/2018 CANCELLED BY APPLICANT LFITZGERALD
Note: THIS IS A REINSPECTION
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 12/07/2018 Disapproved - NO FEE JHINDMAN
Note: THIS IS A REINSPECTION Provide 3rd party testing for the bases that were not inspected
LDSC-PRE-PLANTING TREE QUALITY 12/06/2018 APPROVED BDAWSON
Note: THIS IS A REINSPECTION
LDSC-IRRIGATION FINAL 12/06/2018 CANCELLED BY INSPECTOR BDAWSON
LDSC-SITE LIGHTING / SHIELDING 12/06/2018 APPROVED BDAWSON
BLD - ADA COMPLIANT 12/06/2018 APPROVED JHINDMAN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 12/06/2018 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 12/06/2018 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION bases already poured. need 3rd party certification
UC-FINAL SITE INSPECTION 12/06/2018 CANCELLED BY APPLICANT MBACON
U - UTILITY COMMERCIAL FINAL 12/06/2018 CANCELLED BY APPLICANT MBACON
LDSC- LANDSCAPE FINAL 12/06/2018 Disapproved -FEE REQUIRED BDAWSON
Note: Inspection notes emailed directly to contractor.
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 12/06/2018 CANCELLED BY INSPECTOR BDAWSON
Note: THIS IS A REINSPECTION
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 12/06/2018 CANCELLED BY APPLICANT BDAWSON
U-PROJECT STATUS (OFFICE USE) 12/06/2018 APPROVED MBACON
ROW - FINAL INSPECTION 12/06/2018 APPROVED MBACON
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 12/06/2018 APPROVED MBACON
UC-SUBSTANTIAL WALK-THRU 12/05/2018 APPROVED MBACON
Note: Performed walkthrough and created punch list
UC- PRELIMINARY AS-BUILTS 12/05/2018 APPROVED MBACON
U-GREASE INTERCEPTOR FLOW/DYE TESTED 11/28/2018 APPROVED MBACON
UC-CONSTRUCTION ENTRANCE 11/28/2018 APPROVED MBACON
UC-MOT MAINTENANCE OF TRAFFIC 11/28/2018 APPROVED MBACON
UC-ASPHALT PRE PLACEMENT 11/28/2018 APPROVED MBACON
UC-DRAINAGE STRUCT PLACMNT 11/28/2018 APPROVED MBACON
UC-DRAINAGE PIPE PLACEMENT/LAMPING 11/28/2018 APPROVED MBACON
U-WATER METER INSTALLATION/VERIFICATION 11/28/2018 APPROVED MBACON
U-WATER SERVICE INSTALLATION 11/28/2018 APPROVED MBACON
U-GRAVITY SEWER INSTALL/TESTING 11/28/2018 APPROVED MBACON
U-WATER MAIN DISINFECTION 11/28/2018 APPROVED MBACON
U-WATER MAIN DISINFECTION SAMPLING 11/28/2018 APPROVED MBACON
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 11/28/2018 APPROVED MBACON
Note: THIS IS A REINSPECTION
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 11/28/2018 CANCELLED BY APPLICANT MBACON
Note: THIS IS A REINSPECTION
UROW -FINAL GRADE PRIOR SOD 11/28/2018 APPROVED MBACON
UROW- CURBING & GUTTER 11/28/2018 APPROVED MBACON
Note: THIS IS A REINSPECTION
UROW - FINAL DRAINAGE 11/28/2018 APPROVED MBACON
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 11/20/2018 Disapproved - NO FEE BDAWSON
Note: Marked up plans to be emailed directly to Contractor/RacetracReps/Landscape Architect/Landscape Installer.
LDSC -PROJECT STATUS (OFFICE USE) 11/20/2018 CANCELLED BY INSPECTOR BDAWSON
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 11/19/2018 CANCELLED BY APPLICANT BDAWSON
LDSC-PRE-PLANTING TREE QUALITY 11/13/2018 PARTIALLY APPROVED BDAWSON
Note: Maples approved. Cathedral Oaks approved. Holly Trees approved. Bald Cypress containers were undersized. 65 gal specified, 45 gal provided. Approved smaller container size but landscape installer to keep an eye on these and replace if any issues per 1 year warranty. (2) Crape Myrtle Mrytle trees specified as 65 gal, 30 gal brought to site. Rejected the crape Mrytle trees - Landscaper to bringer 65 gal material to site with the delivery of Sabal Palms.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/08/2018 APPROVED MBACON
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/31/2018 PARTIALLY APPROVED MBACON
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/18/2018 PARTIALLY APPROVED MBACON
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/16/2018 PARTIALLY APPROVED MBACON
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/12/2018 PARTIALLY APPROVED MBACON
Note: Area for sidewalk east side
U-GREASE INTERCEPTOR PRE-INSTALLATION 10/12/2018 APPROVED MBACON
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 10/12/2018 APPROVED MBACON
U - SEWER TIE IN 10/12/2018 APPROVED MBACON
UROW- CURBING & GUTTER 10/12/2018 PARTIALLY APPROVED MBACON
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/11/2018 APPROVED MBACON
Note: Ready to pour area to southwest of pumps.
BLD- UNDERGROUND ELEC/GAS 10/10/2018 APPROVED RMARTIN
BLD- UNDERGROUND ELEC/GAS 10/02/2018 APPROVED RMARTIN
Note: ELECTRIC ONLY
BLD- UNDERGROUND ELEC/GAS 10/01/2018 PARTIALLY APPROVED RMARTIN
Note: UNDERGROUND FOR SITE LIGHTING POLES, PENDING SIGN CONDUIT RUN
BLD- UNDERGROUND ELEC/GAS 09/25/2018 PARTIALLY APPROVED RMARTIN
Note: UNDERGROUND FEEDERS CONDUIT
LDSC-TREE BARRICADE 09/25/2018 Disapproved -FEE REQUIRED WBUTLER
Note: THIS IS A REINSPECTION Two trees are still not barricaded. Uprights used were not the required "w" channel metal posts or 2" x 4" wood so need to add next to the 2" x 2" posts or replace. Wire was not woven through the top of the orange fencing and secured to the posts. This is all on the approved plan details for the tree barricade.
LDSC-TREE BARRICADE 09/24/2018 Disapproved -FEE REQUIRED WBUTLER
Note: Work has not been completed. Another inspection will be scheduled on Tuesday for this.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 09/21/2018 PARTIALLY APPROVED MBACON
Note: Area under canopy
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 09/19/2018 PARTIALLY APPROVED LFITZGERALD
Note: sidewalk in front of building from west building corner to east building corner satisfactory for concrete placement
BLD- UNDERGROUND ELEC/GAS 09/14/2018 PARTIALLY APPROVED RMARTIN
Note: UNDERGROUND FOR BALLARDS AT FRONT
BLD- UNDERGROUND ELEC/GAS 08/29/2018 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION UNDERGROUND FOR TANKS AND DISPENCERS
BLD- UNDERGROUND ELEC/GAS 08/24/2018 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION underground for dispencers
BLD- UNDERGROUND ELEC/GAS 08/16/2018 Disapproved - NO FEE RMARTIN
Note: THIS IS A REINSPECTION WANTED INSPECTION ON SITE LIGHTING STEEL, DARRELL SCHEDULED INSPECTION T
BLD - UNDERGROUND SITE LIGHTING CONDUITS 08/16/2018 PARTIALLY APPROVED RMARTIN
Note: CONDUIT IN POLE BASE, MARKED ON PLAN
BLD - SITE STRUCTURE - TRASH DUMPSTER 08/16/2018 CANCELLED BY INSPECTOR DROCKWELL
Note: Wrong permit. Dumpster has its own permit
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 08/16/2018 PARTIALLY APPROVED DROCKWELL
Note: Competed 5 only.Marked and dated on plans
BLD- UNDERGROUND ELEC/GAS 08/14/2018 PARTIALLY APPROVED RMARTIN
Note: THIS IS A REINSPECTION primary underground conduit
BLD- UNDERGROUND ELEC/GAS 08/07/2018 PARTIALLY APPROVED RMARTIN
Note: UNDERGROUND FOR SITE/PUMPS MARKED ON PLAN
LDSC-LOCATE BACKFLOW PREVENTOR OR PAD/ ELEC TRANS 07/30/2018 APPROVED - AS NOTED WBUTLER
Note: 7/30/18 WMB Backflow preventer location was staked and it was made clear to the ocntractor that we need to maintain a minimum width of 3' between the concrete pad and the existing sidewalk to allow for screening plantings as shown on the landscape plan. Staff will get with the Utility Department to see if the meters for this can be located on the south side of the exisitng sidewalk to allow more room for the shrub plantings.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/27/2018 APPROVED MBACON
Note: Water backflow and meter was picked up today and all poly has been run to building and 2 inch tap was made
LDSC-SITE LIGHT STAKE LOCATE 07/25/2018 APPROVED - AS NOTED BDAWSON
Note: - (1) holly tree will need to be removed and replaced in the front buffer due to lighting location conflict. - Call for re-inspection of (1) stake that needs to be shifted 5' to the west due to tree conflict and (1) stake that was missing showing where the existing ornamental light pole was going to be relocated.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 07/20/2018 CANCELLED BY APPLICANT LFITZGERALD
Note: Building slab now being formed, this inspection, which will be for the parking pavement, was sheduled by mistake.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/26/2018 PARTIALLY APPROVED MBACON
SILT FENCE 06/19/2018 APPROVED JNICHOLS
Note: this is an old code that is no longer used -- please use code # 9210 UC- erosion control / inlet protection / silt fence - in the future this will be an on going inspection and will bea partial until the fence is removed
PLAN - PRE-CON 386-986-3750 06/11/2018 APPROVED MBACON

Review History

Department Status Date In Date Out
PLLA COMPLETE 12/07/2018 12/07/2018
Note: Released By: DRAMIREZ This hold was not needed.
PLLA HOLD 07/03/2018 07/05/2018
Note: Held By: WBUTLER Not clear what the changes are on the plans as the last revision date on the plans is prior to the date of the approved development order stamp. Need clarification on what was changed.
UD1 COMPLETE 03/12/2018 03/12/2018
Note: Released By: DRAMIREZ
BLD COMPLETE 02/27/2018 02/27/2018
Note: Released By: JHINDMAN
DSD COMPLETE 02/27/2018 03/01/2018
Note: Released By: DRAMIREZ
ENGIN1 COMPLETE 02/27/2018 03/13/2018
Note: Released By: DRAMIREZ Per Don Schrager all inspections have been added.
PLLA COMPLETE 02/27/2018 03/06/2018
Note: Released By: WBUTLER
UD1 HOLD 02/27/2018 03/02/2018
Note: Held By: CJOHNSON Fees, agreements shall be complete prior to issunace of the site development permit

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/10/2018
REINSPECTION FEE ¤40.00 12/10/2018
REINSPECTION FEE ¤40.00 12/05/2018
REINSPECTION FEE ¤40.00 12/05/2018
CONTRACTOR CHANGE ¤40.00 06/06/2018
INSPECTION 40 ¤1,040.00 06/06/2018
PERMIT FEE ¤125.00 06/06/2018
SITE PLAN 20 ¤20.00 06/06/2018
Fees Total Due: ¤0.00 Total Paid: ¤1,385.00