I want to search for...
Permit #2018030002
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7018-00440-0200 |
| Block: 00440 |
| Subdivision: 2181 - SECTION 18-WYNNFIELD |
| Job Phone: (386)986-0171 |
| Location Address: 65 WILLIAMS DR |
| Type: DR - DRIVEWAY |
| Issue Date: 03/21/2018 |
| NOC: RECORDED |
| Applicant name: MATTHEW A BARRON |
| Owner: JACKSON, WILLIAM P & ELEASE |
|
Address 65 WILLIAMS DRIVE PALM COAST, FL 32164 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤9,000.00 |
| Job Description: PAVER DRIVEWAY & WALKWAYS |
| Type: CN |
Contractor
LEGACY LANDSCAPING LLC
| Status | Location Address | Phone |
| CANCEL |
PO BOX 353096 PALM OCAST, FL 32135 |
(386)986-0171 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/29/2018 | APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 06/29/2018 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 06/28/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: THERE IS A BROKEN BRICK PAVER ON THE RIGHT SIDE BY THE MITERED END SECTION THAT YOU SHOULD FIX FOR THE HOMEOWNER | |||
| ROW - FINAL INSPECTION | 06/28/2018 | FINAL APPROVED | KHOWELL |
| ROW- PAVER RESTRAINTS | 05/11/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: I SUGGEST THAT YOU PUT INSULATION AROUND THE SPRINKLER LINES THAT ARE IN THE FOOTER SO CONCRETE IS NOT SURROUNDING THEM | |||
| ROW- PAVER RESTRAINTS | 05/09/2018 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 05/04/2018 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 04/18/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: ON SITE WITH CONTRACTOR WILL MAKE ADJUSTMENTS THAT WE TALKED ABOUT PRIOR TO POURING CONCRETE. PAVER DRIVEWAY. THE MITERED END SECTION CONCRETE IS REQUIRED TO BE 2" ABOVE PIPE OPENING | |||
| ROW- PRE-APRON (PRE-POUR) | 04/13/2018 | CANCELLED BY APPLICANT | KHOWELL |
| Note: MATT CALLED TO CANCEL | |||
| ROW- PRE-APRON (PRE-POUR) | 04/06/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: NOT FORMED PER CITY STANDARD DETAIL, RIGHT SIDE OF PIPE OUT OF TOLERANCE. CONCRETE NOT ALLOWED TO BE POURED PAST THE FORM BOARD AT ENDS OF MITERS. NO PAVER RESTRAINT FORMS |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/01/2018 | 03/08/2018 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 03/01/2018 | 03/06/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/01/2018 | 03/08/2018 |
| Note: Released By: JNICHOLS This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 03/01/2018 | 03/01/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/28/2018 |
| SITE PLAN 20 | ¤20.00 | 03/21/2018 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/21/2018 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/21/2018 |
| STORM WATER PERMIT FEES | ¤40.00 | 03/21/2018 |
| ADMIN FEE | ¤20.00 | 03/21/2018 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 03/21/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤176.50 |