Permit #2018030291
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00010-0040 |
| GARAGE: 770 sqft |
| OPENED PORCH (WITH ROOF) : 97 sqft |
| OPENED PORCH (WITH ROOF) : 505 sqft |
| CONDITIONED SPACE: 2447 sqft |
| CONDITIONED SPACE: 384 sqft |
| Total Square Footage: 4203 sqft |
| Block: 00010 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 7 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/20/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/08/2019 | APPROVED | MWILLIAMS |
| BLD - BUILDING FINAL | 01/04/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: House not ready Second Trip to home and not ready for final 1. Exhaust and hood not installed open vent in wall in kitchen 2. open electrical boxes with exposed wires 3. No weather stripping installed in exterior doors. 4. No address numbers on home PLEASE COMPLETE THIS HOME PRIOR TO SCHEDULING FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 01/04/2019 | FINAL APPROVED | LFITZGERALD |
| Note: NOTE: re-use meter not installed due to utility dept. has none in stock until about Febuary per Mike Hughes.They are being plummed in with straight pipe for now. Per Mike he said ok to PASS the Finals where these non meters occur. | |||
| ROW - FINAL INSPECTION | 01/03/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 01/03/2019 | Disapproved - NO FEE | LFITZGERALD |
| Note: There was no meter in the re-use metert vault. Please reschedule Final when meter is installed. Builder rep. left message with Mike Hughes. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/03/2019 | APPROVED | KHOWELL |
| BLD - BUILDING FINAL | 01/03/2019 | CANCELLED BY APPLICANT | MWILLIAMS |
| Note: not ready | |||
| U-CROSS CONNECTION | 01/03/2019 | APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 01/02/2019 | APPROVED | JHINDMAN |
| TUB SET | 12/21/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED MIXING VALVE TO MASTER TUB- SPOKE WITH PLUMBER ONE WILL BE ADDED TO WATER HEATER | |||
| ROW- PRE-APRON (PRE-POUR) | 12/18/2018 | APPROVED | KHOWELL |
| ROW- PAVER RESTRAINTS | 12/13/2018 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 12/13/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON AND SIDEWALK POUR, PAVER UPPER | |||
| U - SEWER TIE IN | 12/11/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: TAP WAS MADE BY UTILITIES | |||
| PROJECT STATUS (OFFICE USE) | 12/11/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: MET WITH MASON FROM ABD CONTRACTORS TO GO OVER PAVER RESTRAINT REQUIREMENTS AND OPTIONS FOR 2018 PAVER DRIVEWAYS | |||
| GRAVITY SEWER TEST | 12/11/2018 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 12/10/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:20 | |||
| ELECTRIC-TUG | 12/03/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO FPL RELEASED TUG 1:50 | |||
| ELECTRIC-TUG | 11/27/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: SERVICE DOES NOT HAVE GROUNDING ELECTRODE, NEC 250.4 | |||
| LATH/BRICK/ WATER BARRIER | 11/16/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| INSULATION | 11/06/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ALL ROUGH | 10/31/2018 | APPROVED - AS NOTED | DROCKWELL |
| Note: Fireblock drop ceilings between garage and kitchen area | |||
| ALL ROUGH | 10/26/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: no approved plans on site DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/17/2018 | APPROVED | CMINI |
| ROOF VALLEY & METAL | 09/28/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/27/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to grout solid under truss at front entry and correct starp, need to expose front entrance header for tie down and need to correct framing and tie down at copula | |||
| ROOF SHEATHING | 09/05/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 08/08/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 07/18/2018 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 07/05/2018 | APPROVED | DREWIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/03/2018 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 04/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 11:45 | |||
| FOOTER | 04/16/2018 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/26/2018 | 01/02/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 07/03/2018 | 07/05/2018 |
| Note: Released By: DREWIS foundation survey | |||
| BLD | COMPLETE | 03/16/2018 | 03/16/2018 |
| Note: Released By: FREODICA | |||
| BLD | HOLD | 03/15/2018 | 03/15/2018 |
| Note: Held By: FREODICA 1. Revise the drawings A-1, A-2 and S-1 to show only (1) AHU/CU due change in mechanical plans and energy calculations per FBC 6th ed. 107.2.1. 2. Provide specifications of spray foam insulattion for unvented attic per FBCR 6th ed. R316.. F.Reodica -386-986-4734. | |||
| MECH | COMPLETE | 03/12/2018 | 03/15/2018 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 03/12/2018 | 03/14/2018 |
| Note: Released By: DREWIS | |||
| PLUM | COMPLETE | 03/08/2018 | 03/08/2018 |
| Note: Released By: FREODICA | |||
| URB | COMPLETE | 03/07/2018 | 03/07/2018 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 03/06/2018 | 03/07/2018 |
| Note: Released By: FREODICA | |||
| ELEC | HOLD | 03/06/2018 | 03/09/2018 |
| Note: Held By: DREWIS Please provide load calculations. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 03/06/2018 | 03/08/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 03/06/2018 | 03/07/2018 |
| Note: Held By: FREODICA 1. Energy calculation shows only (1) hvac unit but the floor plan shows (2) and also on hvac plan. Cooordiante per FBC 6th ed. 107.2.1. 2. Directional orientation of the building shall be coordinated with site plan per FBCEC 6th ed. R403.7.1. 3. Conditioned space area on energy calculation does not match wit floor plan. Coordinateper FBC 6th ed. 107.2.1. F.Reodica-386-986-4734. | |||
| PLUM | HOLD | 03/06/2018 | 03/07/2018 |
| Note: Held By: FREODICA Sanitary riser diagram does not match with floor plan. Coordinate. Also, clarify if pool bath would be a separate tie-in to the sewer line as the riser shows. FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 03/06/2018 | 03/09/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 03/06/2018 | 03/12/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 03/06/2018 | 03/07/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/04/2019 |
| REINSPECTION FEE | ¤40.00 | 01/03/2019 |
| REINSPECTION FEE | ¤40.00 | 11/05/2018 |
| REINSPECTION FEE | ¤40.00 | 11/05/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤740.00 | 03/20/2018 |
| SITE PLAN 20 | ¤20.00 | 03/20/2018 |
| SURCHARGE FS 533.721 | ¤17.74 | 03/20/2018 |
| SURCHARGE - FS 468.631 | ¤26.61 | 03/20/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/20/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/20/2018 |
| ADMIN FEE | ¤20.00 | 03/20/2018 |
| ELECTRIC FEE | ¤282.00 | 03/20/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 03/20/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 03/20/2018 |
| IMPACT FEE PARKS | ¤849.24 | 03/20/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/20/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/20/2018 |
| MECHANICAL FEE | ¤282.00 | 03/20/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/20/2018 |
| PLAN CHECK FEE | ¤148.00 | 03/20/2018 |
| PLUMBING FEE | ¤282.00 | 03/20/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,725.27 |