I want to search for...
Permit #2018030907
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-01230-0070 |
| Block: 01230 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-5275 |
| Location Address: 24 EDMOND PL |
| Type: DR - DRIVEWAY |
| Issue Date: 04/20/2018 |
| NOC: Unknown |
| Applicant name: DANIELLE COPSY |
| Owner: NEWMAN, JOSEPH G & VICKIE R |
|
Address TRUSTEES PALM COAST, FL 32164 |
|
Address 24 EDMOND PLACE PALM COAST, FL 32164 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤2,500.00 |
| Job Description: REMOVE & REPLACE W/CIRCULAR DRIVEWAY |
| Type: CN |
Contractor
J & D COPSY ENTERPRISES, INC
| Status | Location Address | Mailing Address | Phone |
| INACTIVE |
2280 WEST COUNTY ROAD BUNNELL, FL 32110 |
2006 BUNNELL, FL 32110 |
386-931-5275 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 06/29/2018 | APPROVED | CTROHA |
| Note: work complete | |||
| ROW - FINAL INSPECTION | 06/29/2018 | FINAL APPROVED | CTROHA |
| Note: work complete | |||
| U -UTILITY RESIDENTIAL FINAL | 06/29/2018 | FINAL APPROVED | MBACON |
| U -UTILITY RESIDENTIAL FINAL | 06/18/2018 | Disapproved - NO FEE | MBACON |
| Note: Please call in after sod work required by ROW inspector seee CTROHA Notes. | |||
| ROW - FINAL INSPECTION | 06/18/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: CONCRETE APRON IS IN THE ROAD CUT IT BACK SO NO CONCRETE IS PAST THE ROAD EDGE SOD ALL BARE AREAS IN THE ROW | |||
| ROW - FINAL APRON (AFTER POUR) | 06/18/2018 | Disapproved - NO FEE | CTROHA |
| ROW- PRE-APRON (PRE-POUR) | 06/11/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: ON SITE WITH CONTRACTOR ADJUST MITER END SECTION UPPERS TO 18" PRIOR TO POURING |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 04/17/2018 | 04/18/2018 |
| Note: Released By: TAWILLIAMS | |||
| ZON | HOLD | 04/09/2018 | 04/09/2018 |
| Note: Held By: AMOBLEY Driveway must meet the minimum side setback of 7.5ft There must be a seperation between the walkway and driveway Circular driveway must continue to the roadway | |||
| ENGIN1 | COMPLETE | 03/21/2018 | 03/27/2018 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 03/21/2018 | 03/23/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 03/21/2018 | 03/22/2018 |
| Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ZON | HOLD | 03/21/2018 | 03/21/2018 |
| Note: Held By: AMOBLEY Please include setbacks on site plan Circular driveway must continue to the road |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/28/2018 |
| SITE PLAN 20 | ¤20.00 | 04/20/2018 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/20/2018 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/20/2018 |
| STORM WATER PERMIT FEES | ¤40.00 | 04/20/2018 |
| ADMIN FEE | ¤20.00 | 04/20/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤124.00 |