I want to search for...
Permit #2018031208
Permit Details
Status: COED
| Parcel Id: 20-12-31-2950-00000-0500 |
| CONDITIONED SPACE: 2335 sqft |
| GARAGE: 634 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| OPENED PORCH (WITH ROOF) : 97 sqft |
| SCREEN PORCH (SOLID ROOF) : 315 sqft |
| Total Square Footage: 3641 sqft |
| Block: 00000 |
| Subdivision: 2133 - GRAND LANDINGS - PHASE 1 |
| Job Phone: (386) 446-5850 |
| Location Address: 119 COOPERS HAWK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/06/2018 |
| NOC: RECORDED |
| Applicant name: CHARLES DALLAS RINEK |
| Owner: JOHN & CAROLYN SIERRA |
|
Address 119 S COOPERS HAWK PALM COAST, FL 32137 |
| Lot: 0500 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: New Single Family Home |
| Type: CN |
Contractor
CHARLES RINEK CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 352502 Palm Coast, FL 32137 |
CGC046080 (Exp: 08/31/2026) | (386) 446-5850 | (386)445-9992 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
STEPHEN CARMAN KENNY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 246 FLAGLER BEACH, FL 32136 |
CCC1330218 (Exp: 08/31/2026) | 386-931-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 01/04/2019 | FINAL APPROVED | KHOWELL |
| BLD - BUILDING FINAL | 01/03/2019 | FINAL APPROVED | DROCKWELL |
| U-CROSS CONNECTION | 12/20/2018 | APPROVED | MBACON |
| U -UTILITY RESIDENTIAL FINAL | 12/20/2018 | FINAL APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 12/20/2018 | APPROVED | CTROHA |
| ROW - FINAL INSPECTION | 12/20/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: A SECTION OF THE SIDEWALK WAS REPOURED WITH OUT AN INSPECTION WHERE THE RE-USE VALVE IS LOCATED MIAMI CURB WAS PATCHED AND IF FAILING I RECOMMEND USING CONCRETE WITH A BINDER OR MASTIC MIX SO THE PATCH WILL HOLD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/19/2018 | APPROVED | DREWIS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/12/2018 | Disapproved - NO FEE | DREWIS |
| Note: Provide additonal elevations for drainage per the City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300 and additional elevations for grade at and away from the foundation wall per Residential Florida Building Code R401.3. Daniel Rewis 986-4736 | |||
| ROW - FINAL APRON (AFTER POUR) | 11/09/2018 | Disapproved - NO FEE | CTROHA |
| Note: NOT READY FOR INSPECTION PAVERS NOT INSTALLED NOTE: BASE IS TOO WET I RECCOMEND PUTTING IN SOME DRY MATERILA AND COMPACTING BEFORE LAYING PAVERS | |||
| TUB SET | 11/07/2018 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/05/2018 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PAVER RESTRAINTS | 11/05/2018 | APPROVED | CTROHA |
| U - SEWER TIE IN | 10/05/2018 | APPROVED | MBACON |
| GRAVITY SEWER TEST | 10/05/2018 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 09/28/2018 | APPROVED | DROCKWELL |
| ELECTRIC - EARLY POWER | 09/25/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:00 | |||
| LATH/BRICK/ WATER BARRIER | 08/08/2018 | APPROVED | DROCKWELL |
| PROJECT STATUS (OFFICE USE) | 08/07/2018 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 08/07/2018 | CANCELLED BY APPLICANT | DROCKWELL |
| ELECTRIC-TUG | 08/06/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 11:30 | |||
| INSULATION | 08/02/2018 | APPROVED | JHINDMAN |
| ALL ROUGH | 07/27/2018 | APPROVED - AS NOTED | DROCKWELL |
| Note: Need water test on shower liner min2in/Tighten all threaded rods/Nail truss strap garage left side.Call in a tub set inspection when ready | |||
| ROOF VALLEY & METAL | 07/19/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/09/2018 | APPROVED | CMINI |
| WALL SHEATHING | 07/06/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2018 | CANCELLED BY APPLICANT | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 06/25/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 06/14/2018 | CANCELLED BY APPLICANT | AIRS WEB |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 06/13/2018 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/07/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/17/2018 | 12/19/2018 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 12/11/2018 | 12/12/2018 |
| Note: Held By: DREWIS Provide additonal elevations for drainage per the City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300 and additional elevations for grade at and away from the foundation wall per Residential Florida Building Code R401.3. Daniel Rewis 986-4736 | |||
| BLD | COMPLETE | 06/27/2018 | 07/03/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 06/22/2018 | 06/25/2018 |
| Note: Released By: DREWIS foundation s | |||
| ZON | COMPLETE | 04/02/2018 | 04/03/2018 |
| Note: Released By: AMOBLEY | |||
| MECH | COMPLETE | 04/02/2018 | 04/03/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 04/02/2018 | 04/03/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 04/02/2018 | 04/03/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 03/27/2018 | 03/27/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 03/27/2018 | 03/29/2018 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/27/2018 | 03/27/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 03/27/2018 | 03/28/2018 |
| Note: Held By: FREODICA 1. Certification for energy code compliance on energy calculation shall be signed by the owner/agent per FBCEC 6th ed. R401.2. 2. Energy performance level (EPL) display card shalll be signed by the builder per FBCEC 6th ed. R401.3. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 03/27/2018 | 03/28/2018 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 03/27/2018 | 03/29/2018 |
| Note: Held By: DREWIS Provide the roadway centerline elevation. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 03/27/2018 | 04/02/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 03/27/2018 | 03/27/2018 |
| Note: Held By: AMOBLEY Survey should have total lot square footage Please specify on survey that driveway will be pavers not brick | |||
| URB | COMPLETE | 03/27/2018 | 03/28/2018 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/04/2019 |
| REVISION | ¤40.00 | 12/11/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 12/11/2018 |
| REINSPECTION FEE | ¤40.00 | 12/11/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 06/13/2018 |
| ADMIN FEE | ¤20.00 | 04/06/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤626.00 | 04/06/2018 |
| SITE PLAN 20 | ¤20.00 | 04/06/2018 |
| SURCHARGE FS 533.721 | ¤15.35 | 04/06/2018 |
| SURCHARGE - FS 468.631 | ¤23.02 | 04/06/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/06/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 04/06/2018 |
| ELECTRIC FEE | ¤247.80 | 04/06/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 04/06/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 04/06/2018 |
| IMPACT FEE PARKS | ¤849.24 | 04/06/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/06/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 04/06/2018 |
| MECHANICAL FEE | ¤247.80 | 04/06/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/06/2018 |
| PLAN CHECK FEE | ¤125.20 | 04/06/2018 |
| PLUMBING FEE | ¤247.80 | 04/06/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,519.89 |