Permit #2018040155

Permit Details

Status: FINAL

Parcel Id: 22-11-30-5545-00000-0020
Block: 00000
Subdivision: -
Job Phone: 386-437-3122
Location Address: 4490 US HWY 1 N
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 04/20/2018
NOC: RECORDED
Applicant name: TERRY MARTIN MCNITT JR
Owner: TEAROC OF FLORIDA

Address

4490 N US 1 STE 111

BUNNELL, FL 32110

Lot: 0020
Contracted Stated Job Value: ¤600,000.00
Job Description: SITE WORK AND PAD WORK - PHASE 2 ALAMO STORAGE
Type: CN

Contractor

VERDEGO LLC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 789

BUNNELL, FL 32110

CGC1506752 (Exp: 08/31/2026) 386-437-3122 386-437-6883

Inspection History

Type Request Date Result Inspector
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 07/28/2020 APPROVED BDAWSON
Note: THIS IS A REINSPECTION ADDED ON 4/8/2020 2:18:12 PM
LDSC- LANDSCAPE FINAL 07/21/2020 APPROVED BDAWSON
Note: THIS IS A REINSPECTION ADDED ON 7/9/2020 3:40:56 PM - All planting beds need to be weeded. - Replace any dead plants. Please note that some plants are declining. If they die prior to calling in the reinspection they will need to be replaced. - Remulch areas of bare dirt in landscape beds.
LDSC- LANDSCAPE FINAL 07/09/2020 Disapproved - NO FEE BDAWSON
Note: - All planting beds need to be weeded. - Replace any dead plants. Please note that some plants are declining. If they die prior to calling in the reinspection they will need to be replaced. - Remulch areas of bare dirt in landscape beds.
LDSC- LANDSCAPE FINAL 07/08/2020 Disapproved - NO FEE BDAWSON
Note: Provide final as-built prints for final landscape inspection. No permit box/as-builts on site.
IRRIGATION AFFIDAVIT 07/08/2020 APPROVED BDAWSON
LDSC-IRRIGATION FINAL 07/08/2020 CANCELLED BY INSPECTOR BDAWSON
Note: Affidavit provided.
U - UTILITY COMMERCIAL FINAL 07/02/2020 FINAL APPROVED LFITZGERALD
UC-FINAL SITE INSPECTION 07/01/2020 FINAL APPROVED LFITZGERALD
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 06/23/2020 APPROVED LFITZGERALD
Note: Approved under app 4381
MAINT BOND ACCEPTANCE (OFFICE) 06/19/2020 APPROVED DRAMIREZ
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 06/02/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Truncated Domes (ADA Mats) Missing. Called contractor (Josh 586-8992) and left message. Didn't return my call. Domes installed as per ADA.
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 06/02/2020 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION no wheeel stops and no 6in white thermo for FDOT shoulders at Exit/Entrance
BLD- ADA PARKING 05/29/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Re-Schedule with sidewak and ramps.
UC-SUBSTANTIAL WALK-THRU 05/11/2020 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION no as-builts
UC- PRELIMINARY AS-BUILTS 05/11/2020 APPROVED LFITZGERALD
ROW - FINAL INSPECTION 04/27/2020 APPROVED LFITZGERALD
Note: any minor issues to be captured with other inspectiomns or on the substantial punch list
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 04/23/2020 CANCELLED BY APPLICANT LFITZGERALD
Note: no wheeel stops and no 6in white thermo for FDOT shoulders at Exit/Entrance
UROW - FINAL DRAINAGE 04/23/2020 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION
UC-SUBSTANTIAL WALK-THRU 04/23/2020 CANCELLED BY APPLICANT LFITZGERALD
Note: no as-builts
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 04/23/2020 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Truncated Domes (ADA Mats) Missing. Called contractor (Josh 586-8992) and left message. Didn't return my call.
BLD- ADA PARKING 04/23/2020 Disapproved - NO FEE FWILLIS
Note: Re-Schedule with sidewak and ramps.
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 04/09/2020 APPROVED - AS NOTED MBACON
Note: 1. Rake mulch away from base of trees/shrubs 2. Establish tree wells as needed. 3. Install 7 Viburnum in front of south side water meter and back flow preventers for required screening. 4. Add 1 Podocarpus Hedge on south side of south storage units.
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 04/09/2020 CANCELLED BY APPLICANT BDAWSON
LDSC-TREE BARRICADE 04/08/2020 CANCELLED BY INSPECTOR BDAWSON
U-WATER METER INSTALLATION/VERIFICATION 04/08/2020 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/08/2020 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
LDSC-PRE-PLANTING TREE QUALITY 03/24/2020 APPROVED - AS NOTED BDAWSON
Note: Inspection completed with photos provided by installer. Not all trees were shown. At time of landscape substantial complete inspection it may be determined that the trees not shown with photographs may not meet fl grades and standards for FL #1 OR BETTER and may need replacing.
U-PUMP STATION START-UP 03/23/2020 APPROVED LFITZGERALD
U - SEWER TIE IN 03/18/2020 APPROVED - AS NOTED JGIBSON
Note: THIS INSPECTION WAS DONE , I PERSONALLY SAW CONNECTION TO SEWER
UROW -FINAL GRADE PRIOR SOD 03/17/2020 APPROVED LFITZGERALD
UROW - FINAL DRAINAGE 03/17/2020 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/17/2020 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U-SEWER FORCE MAIN INSTALL/TESTING 03/13/2020 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U-WATER METER INSTALLATION/VERIFICATION 10/04/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-both retail store front meters now verified to their proper tie in to the appropriate backflow devices.
CONCRETE FORM 08/19/2019 APPROVED JDELBONIS
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 08/14/2019 CANCELLED BY APPLICANT MWILLIAMS
Note: not ready called in wrong inspection.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 08/14/2019 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-sidewalks for both building 1/2 satisfatory for concrete placement.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 08/02/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-silt fence now installed along bottom toe of US1 ditch line
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 07/30/2019 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION- This is just an accoutability disapproval regarding the front slopes that run into the US1 ROW drainage ditch where the front areas have been stripped to bare earth and sod or silt fence is pending. Josh with JW White is aware to stabilize bare soils or install silt fence where needed but there has been a time laspe of several days and this needs to be addressed with in the next 72 hours. Also,all disturbed areas along north side of property requires seed and staw.
UROW- CURBING & GUTTER 07/30/2019 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-D curb all now installed
U-SEWER FORCE MAIN INSTALL/TESTING 07/30/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-concrete collars now placed for gate valve tap and check valve vault
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/30/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-concrete collars now placed for 2 gate tap valves and all other valves
UC-DRAINAGE STRUCT PLACMNT 07/30/2019 APPROVED LFITZGERALD
Note: last MES placed by Greco
UC-DRAINAGE STRUCT PLACMNT 07/29/2019 CANCELLED BY INSPECTOR LFITZGERALD
Note: THIS IS A REINSPECTION
UC-DRAINAGE STRUCT PLACMNT 07/26/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-entrance on US1 -2 Mitered end sections placed
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/26/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-wire tone test pass for water fire line by Ed Stockely
U-SEWER FORCE MAIN INSTALL/TESTING 07/26/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-wire tone test passed for 2inc poly FM by Ed.
UROW - FINAL DRAINAGE 07/26/2019 CANCELLED BY APPLICANT LFITZGERALD
Note: wrong inspection called in at tthis time. Should be storm water structure
UROW- CURBING & GUTTER 07/26/2019 PARTIALLY APPROVED LFITZGERALD
Note: Geco concrete now starting to place D curbing
U-SEWER FORCE MAIN INSTALL/TESTING 07/22/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-point of connection gate valve body and check valve vault now installed properly
UC-CONSTRUCTION ENTRANCE 07/22/2019 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-entrance now paved
UC-MOT MAINTENANCE OF TRAFFIC 07/18/2019 APPROVED LFITZGERALD
U-SEWER FORCE MAIN INSTALL/TESTING 07/18/2019 CANCELLED BY APPLICANT LFITZGERALD
Note: THIS IS A REINSPECTION
UC-ASPHALT PRE PLACEMENT 07/16/2019 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-sp-9.5 asphalt now being placed
UC-ASPHALT PRE PLACEMENT 06/26/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-stabilized sub-grade and crushed concrete base along west side of retail shops continuing to be placed and compacted
UC-ASPHALT PRE PLACEMENT 06/20/2019 CANCELLED BY APPLICANT MBACON
Note: THIS IS A REINSPECTION per contractor Canceled inspection based on weater conditions from prvious days rain
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 04/25/2019 CANCELLED BY APPLICANT LFITZGERALD
Note: THIS IS A REINSPECTION-wrong inspection called in for dumpster pads. Manny,owner informed that a seperate permit is required for these dumpster inclosures per the building department after speaking to Demaris.
U-WATER METER INSTALLATION/VERIFICATION 04/23/2019 PARTIALLY APPROVED LFITZGERALD
Note: 12 new 1 inch meters now istalled-6 at north end and 6 at south end of property.: Sensus 85274454,85274453,85274450,85274455,85274470,85274452 for retail store numbers 201 thru 206 respectively. 85274448,85274451,85274449,85274471,85274466,85274467 for retail stores 101 thru 106 respectively no water used thru meter except 10.0 gallons used in testing meter at factory as registered on each meter. Retail stores not yet constructed with just blue poly stubs. at building locations for each set of 6-one set at north end and one set at south end.
U-SEWER FORCE MAIN INSTALL/TESTING 04/09/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-3in by 2in wet tap on existing pep main performed by Action Brothers. 2in conduit connected to corp. stop and bundled with another 2in stub for future tie in to proposed check valve
UROW-RETENT/DETENT STABILI 04/05/2019 APPROVED LFITZGERALD
UC-ASPHALT PRE PLACEMENT 03/29/2019 PARTIALLY APPROVED LFITZGERALD
Note: stabilization along with crushed concrete (as approved by the EOR) now being placed from east to west along project between aready poured storage slabs
UC-DRAINAGE STRUCT PLACMNT 03/01/2019 PARTIALLY APPROVED LFITZGERALD
Note: Mitered end sections now starting to be formed and placed with concrete-MES along west side of pond(parking area outfall) now complete
UC-CONSTRUCTION ENTRANCE 02/25/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
UROW-RETENT/DETENT STABILI 02/25/2019 PARTIALLY APPROVED LFITZGERALD
Note: areas except part of South East portion sodded
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/25/2019 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 02/22/2019 PARTIALLY APPROVED DSPENCER
Note: forms not completed yet
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/04/2019 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION-some areas of silt fence failures with soil erosions from previous heavy rains. Ares aong north and east lot lines and at entrance culvert ends. Contractor contacted and agrees to correct as soon as posssible .
U-WATER MAIN DISINFECTION 12/06/2018 APPROVED - AS NOTED LFITZGERALD
Note: this inspection not applicable to this project
U-WATER MAIN DISINFECTION SAMPLING 12/06/2018 APPROVED - AS NOTED LFITZGERALD
Note: not applicable to this project
UC-DRAINAGE PIPE PLACEMENT/LAMPING 11/13/2018 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-culvert ERCP now completed across entrance. MES'S to follow later.
UC-DRAINAGE PIPE PLACEMENT/LAMPING 11/09/2018 PARTIALLY APPROVED LFITZGERALD
Note: ERCP(12X18IN) NOW STARTING TO BE INSTALLED ACROSS THE ENTRANCE ALONG US1 ROW. FDOT INSPECTOR-WALDO IS ALSO INSPECTING
U-GRAVITY SEWER INSTALL/TESTING 11/08/2018 APPROVED - AS NOTED JGIBSON
Note: THIS WAS A TEST FOR UNDER GROUND MAIN SEWER LINE TO LIFT STATION
U-PUMP STATION PRE-INSTALLATION 11/08/2018 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-valves manifold now installed to private can lift ststion
U-SEWER FORCE MAIN INSTALL/TESTING 11/08/2018 PARTIALLY APPROVED LFITZGERALD
Note: approx. 175 feet of 2inch greem poly with trace wire and locate tape now in proposed trenh area, to be back filled.Connection to valve manifold and tap on 3inch pep main along US1 still to be perfromed.
U-SEWER FORCE MAIN INSTALL/TESTING 11/07/2018 CANCELLED BY APPLICANT WEB
U-SEWER FORCE MAIN INSTALL/TESTING 11/07/2018 CANCELLED BY APPLICANT WEB
U-GRAVITY SEWER INSTALL/TESTING 11/07/2018 APPROVED - AS NOTED JGIBSON
Note: LOOKED AT UNDERGROUND INSTALLATION AND SPOKE WITH MIKE FROM TOMOKA CONSTRUCTION, GAVE HIM OK TO BURY LINE BUT INFORMED A 5' WATER HEAD TEST WAS NEEDED PER PLUMBING CODE
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/17/2018 PARTIALLY APPROVED DSPENCER
Note: two water service 2" gate valve and romex tapping saddles installed and tapped also 6" gate valve installed and tapped on fire line to existing system main for hydrants
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 10/03/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-Silt fence where eroded soils have penetrated along north side of project(adjacent to open field-parcel) now has a another row set about 10 ft. to the north and was told from Manny-Alamo owner-that the site contractor has permission to be on this property.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 09/17/2018 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION- failure at NWCorner area where soils have eroded into vacant lot(at lay down arae). aLSO , MAYJOR CONCERN WHERE ALONG NORTH SIDE AT PROPERTY LINE, BUILDING PADS HAVE BEEN FILLED UP TO ABOUT 4FT. ABOVE THE SILT FENCING RIGHT NEXT TO THE SILT FENCE. Spoke with Josh of concerns iof serious erosions and he is attempting to eresolve asap .Advised him of up coming rain forcasted this week.
UC-CONSTRUCTION ENTRANCE 09/07/2018 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION Construction entrance now fouled excessive soils and needs to be recharged. Will reinspect on Monday, 9/10 when corrected
U-WATER SERVICE INSTALLATION 08/30/2018 CANCELLED BY INSPECTOR DSPENCER
Note: questions about fire main and inpections holding for clearifications Damaris project manager checking with EOR and building dept. may need fire permit.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/28/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-water for fire now backfilled with locate wire and warning tape installed. A conflict resolution has to be done for the fire water/sanitary discharge lines where they run into each other at the area where the 2 RWGV's are.
U-PUMP STATION PRE-INSTALLATION 08/24/2018 PARTIALLY APPROVED LFITZGERALD
Note: sanitary pump station container now set with formed -rebar base slab. Cocrete to be placed tomorrow.
UC-CONSTRUCTION ENTRANCE 08/24/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-clean sandy soil now placed as an approach on the exit side of cstr. entrance which is helping aid the cstr rock entrance. Soils in travel lane now minimunized. FDOT inspector-Waldo-ok with since soils now just staining asphalt surface along US1
UC-CONSTRUCTION ENTRANCE 08/23/2018 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION-cstr entrance now not funtioning due to filled in with wet site soils from rains and fill trucks existing site. Josh informed and site crews working on restoring entrance and remove soils on travel lane of US1. A reinspection will be performed by end of the day .
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/23/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-6inch WM now installed with 2 RWGV and 2 FIRE HYDRANTS. WM trench in process of being completely backfilled
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/22/2018 PARTIALLY APPROVED LFITZGERALD
Note: 6in fire-WM now being installed, no tap yet just laying pipe with 2 hydrants
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/21/2018 APPROVED - AS NOTED LFITZGERALD
Note: All pipe placed and backfilled up to subgrade, any remaining deficiencies if , will be covered in the punch list.
UC-DRAINAGE STRUCT PLACMNT 08/21/2018 APPROVED - AS NOTED LFITZGERALD
Note: All rcp drainage strucuures now installed to subgrade. Remaining aspects will be inspected and if any deficiences , will be covered in the punch list.
UC-DRAINAGE STRUCT PLACMNT 08/10/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-all RCP structures now properely set wth all on min. 12in. beding stone. Te-ins to their respective pipe runs and backfilling to be yet completed.
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/10/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-all RCP pipe now installed. Mudding into structures and backfilling to be comleted.
UC-DRAINAGE PIPE PLACEMENT/LAMPING 07/27/2018 PARTIALLY APPROVED LFITZGERALD
Note: Now placing RCP from MES-A to storm inlet E-11
UC-DRAINAGE STRUCT PLACMNT 07/27/2018 PARTIALLY APPROVED LFITZGERALD
Note: Mes-A now set , inlet E-11 next
UC-CONSTRUCTION ENTRANCE 07/25/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-entrance observed full of soils with some tracking onto US1. Josh with JW called and more rock aded over original and tracked soils removed from US1.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 07/16/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-silt fence that was in disrepair along back of proposed pond,SEarea, now repaired correctly. PLEASE: monitor the back of pond where the silt fencing is installed since the berm for the pond is steep and very close to the proprety boundrary and this is where erosions are most likely to occur from rain events
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/03/2018 PARTIALLY APPROVED LFITZGERALD
Note: walked silt fence line with Barry and showed him some areas where some improvements needed to be made. The east side where the proposed pond will be constructed and areas along US 1 Swale are the more crtical areas and asked Barry to reinforce the pond area to protect against future potential erosions and areas along the US1 Swale should be reinforced as well. As with all silt fence, the site contractor will need to keep a constant watch,especially after rain events and is responsible for the functioning value of this barrier protection. This will be an on going inspection and repairs noted /observed need to be corrected ASAP.
UC-CONSTRUCTION ENTRANCE 05/03/2018 PARTIALLY APPROVED LFITZGERALD
Note: spoke with JW reps. Jerry yesterday and Barry today who spoke with Josh where I stated this entrance will probably require high maintanence due to close proximity to US 1 and small nature of the site especially the wet areas.It was stated at the preconstruction meeting held yesterday that the use of cattle gates or the like would benefit ,and that Josh was planning on trying to use.Possibly at both ends of the construction entrance would be helpfull Also,some more rock as discussed with Barry on site would help as well. It will be the responsibility of the site contractor to keep a constant watch and maintain accordingly. Also, please make sure none of the constuction rock gets onto US 1 roadway. This will be an on going inspection and requires to be functionalat all times and repaired if necessary ASAP.
PLAN - PRE-CON 386-986-3750 05/02/2018 APPROVED LFITZGERALD
UC-CONSTRUCTION ENTRANCE 05/01/2018 CANCELLED BY INSPECTOR DSPENCER
Note: This project has not had a preconstruction meeting contact Damaris Ramirez 386-986-3750 to coordinate scheduling of procon.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/01/2018 CANCELLED BY INSPECTOR DSPENCER
Note: This project has not had a preconstruction meeting contact Damaris Ramirez 386-986-3750 to coordinate scheduling of procon.
UC-CONSTRUCTION ENTRANCE 04/30/2018 CANCELLED BY APPLICANT AIRS WEB

Review History

Department Status Date In Date Out
UD1 COMPLETE 04/19/2018 04/19/2018
Note: Released By: CJOHNSON
BLD COMPLETE 04/03/2018 04/05/2018
Note: Released By: JHINDMAN
DSD COMPLETE 04/03/2018 04/05/2018
Note: Released By: DRAMIREZ
ENGIN1 CANCEL 04/03/2018 04/19/2018
PLLA COMPLETE 04/03/2018 04/04/2018
Note: Released By: WBUTLER
UD1 HOLD 04/03/2018 04/06/2018
Note: Held By: CJOHNSON FDEP sewer permit shall be complete prior to issuance of the site development permit

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/27/2020
SITE PLAN 20 ¤20.00 04/20/2018
INSPECTION 40 ¤1,480.00 04/20/2018
PERMIT FEE ¤125.00 04/20/2018
Fees Total Due: ¤0.00 Total Paid: ¤1,665.00