Permit #2018040527

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00020-0081
CONDITIONED SPACE: 1461 sqft
CONDITIONED SPACE: 1461 sqft
GARAGE: 510 sqft
GARAGE: 510 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
Total Square Footage: 4358 sqft
Block: 00020
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 386-445-9055
Location Address: 6 ZORLOU CT
Type: TH2 - TOWNHOUSE -2 UNIT (INFILL LOT)
Issue Date: 05/30/2018
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: COOPER MELISSA LYNN & SYLVIA M SHEPPARD

Address

63 LAKE SUCCESS DR

PALM COAST, FL 32137

Lot: 0081
Contracted Stated Job Value: ¤230,000.00
Job Description: SIDE A - 2 UNIT TOWNHOUSE
Type: CN

Contractor

SUN STATE CUSTOM BUILDERS, LLC
Status Location Address State License Number
CANCEL

946 SHADICH DRIVE

ORANGE CITY, FL

CGC1519145 (Exp: 08/31/2022)

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/07/2019 FINAL APPROVED DROCKWELL
BLD - BUILDING FINAL 06/06/2019 CANCELLED BY INSPECTOR RLEE
Note: Wrong inspection date
FINAL SURVEY (OFFICE USE ONLY) 06/03/2019 APPROVED KHOWELL
Note: THIS WAS APPROVED ON 5-16-19 NOW DUPLEX HAS BEEN RE-CLASSIFIED TO A TOWNHOUSE
ROW - FINAL APRON (AFTER POUR) 05/21/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 05/21/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 05/16/2019 APPROVED KHOWELL
ROW - FINAL INSPECTION 04/08/2019 Disapproved - NO FEE KHOWELL
Note: FINAL CITY APPROVED SURVEY, SWALE SHEET AND PROPOSED SITE ARE REQUIRED TO BE ON SITE FOR THIS INSPECTION PINNED TOGETHER IN THE DOC BOX. REPAIR All ROAD DAMAGE MARKED WITH PAINT. SOD THE BARE AREAS IN THE CENTER ISLAND. SOD IS NOT ALLOWED TO COVER THE BOTTOM OF THE FENCE
ROW - DRAINAGE 04/08/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 04/08/2019 Disapproved -FEE REQUIRED KHOWELL
Note: CLEAN ALL THE DIRT AND CONCRETE OUT OF THE CULVERT PIPES FOR INSPECTION AND FINAL CITY APPROVED SURVEY, SWALE SHEET AND PROPOSED SITE ARE REQUIRED TO BE ON SITE FOR THIS INSPECTION PINNED TOGETHER IN THE DOC BOX
U -UTILITY RESIDENTIAL FINAL 04/08/2019 FINAL APPROVED AHALL
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 04/05/2019 Disapproved - NO FEE AHALL
Note: no power to B side Pep Panel
ROW - DRAINAGE 03/19/2019 Disapproved - NO FEE KHOWELL
Note: GET THE SWALE OPEN AT BOTH 6 AND 8 ZORLOU, NOT ALLOWED TO BE BLOCKED
ROW- PRE-APRON (PRE-POUR) 03/19/2019 APPROVED - AS NOTED KHOWELL
Note: Bob called in this inspection ADJUST MITERED END FORM BOARDS TO CITY STANDARDS ON THE RIGHT SIDE DRIVEWAY. RAIN IN FORCAST SO RECHECK ELEVATIONS. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 03/15/2019 CANCELLED BY APPLICANT AIRS WEB
ROW- PRE-APRON (PRE-POUR) 03/14/2019 CANCELLED BY APPLICANT AIRS WEB
ELECTRIC - EARLY POWER 03/12/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 10:45
U -UTILITY RESIDENTIAL FINAL 03/11/2019 CANCELLED BY INSPECTOR AHALL
Note: Not ready, no power, cleanouts not complete, meter box not to grade
U - SEWER TIE IN 02/28/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 02/28/2019 APPROVED JGIBSON
INSULATION 12/12/2018 APPROVED DROCKWELL
ALL ROUGH 12/04/2018 APPROVED - AS NOTED DROCKWELL
Note: Dryer duct is outside of wall in garage/Bath exhaust must terminate a min 3ft from openings in exterior wall.Will check at next inspection
FIREWALL 12/03/2018 APPROVED DROCKWELL
FIREWALL 11/30/2018 Disapproved -FEE REQUIRED MWILLIAMS
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Firewall incomplete Drywall missining in areas on both sides and not taped or finished
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/14/2018 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 11/14/2018 APPROVED DROCKWELL
ROOF VALLEY & METAL 10/31/2018 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/31/2018 Disapproved - NO FEE DROCKWELL
Note: No plans on job/Bearing kneewall above roof must be anchored to roof below
TIE BEAM / LINTEL 09/28/2018 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 09/27/2018 APPROVED DREWIS
MONOLITHIC SLAB 08/21/2018 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 08/15/2018 APPROVED JGIBSON
STEM WALL FOUNDATION 07/18/2018 APPROVED CMINI
FOOTER 07/02/2018 APPROVED DROCKWELL
FOOTER 06/29/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: Footer has standing water/Many areas not meeting minimum clearance from ground for steel
FOOTER 06/28/2018 CANCELLED BY APPLICANT DROCKWELL
Note: ok per Rick Lee

Review History

Department Status Date In Date Out
BLD COMPLETE 06/06/2019 06/06/2019
Note: Released By: RLEE
BLD HOLD 04/24/2019 04/26/2019
Note: Held By: RLEE Development order has been issued for lot split for townhouses. A separate permit and a permit modification for this duplex to convert to townhouse. Both permit applications to show new parcel Ids and addressses. Separate finals and COs will have to be issued The final survey to show the lot split.
SW1 HOLD 04/08/2019 04/15/2019
Note: Held By: JHINDMAN final survey must show positive drainage to the front of the propery and cannot flow onto adjacent properties per ULDC Tech manual ch5 300.
SW1 COMPLETE 09/24/2018 09/27/2018
Note: Released By: DREWIS rev foundation
SW1 HOLD 09/17/2018 09/17/2018
Note: Held By: DREWIS FOUNDATION S Provide a single site plan with FFE and set back elevations. Daniel Rewis 986-4736
BLD COMPLETE 07/12/2018 07/17/2018
Note: Released By: JHINDMAN
UD1 COMPLETE 05/18/2018 05/21/2018
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 05/14/2018 05/14/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 05/14/2018 05/15/2018
Note: Released By: DREWIS
UD1 HOLD 05/14/2018 05/17/2018
Note: Held By: MBACON Same notes as before. Please show both PEP panels on same side as PEP tank
ZON HOLD 05/08/2018 05/08/2018
Note: Held By: AMOBLEY Shrubs must wrap both corners of house
ELEC HOLD 05/08/2018 05/09/2018
Note: Held By: DREWIS Riser diagram provided only depicts a single service and panel. Daniel Rewis 986-4736
MECH COMPLETE 05/08/2018 05/11/2018
Note: Released By: FREODICA
UD1 HOLD 05/08/2018 05/11/2018
Note: Held By: MBACON Both PEP panels must be located on the same side as the PEP tank please show both panels on the same side and remove the panel shown on the wrong side.
UD1 HOLD 04/27/2018 05/04/2018
Note: Held By: LFITZGERALD PEP Panels not shown on correct side of building on electrical plans PEP Panel is not shown on the same side as the tank in the electrical plan as the utility marked site plans. Submit a new electrical plan showing PEP Panel on the same side of the building as indicated in the Utility marked site plan
ZON HOLD 04/27/2018 04/27/2018
Note: Held By: AMOBLEY Landscape plan should state sod type and if irrigation will be installed
ELEC HOLD 04/27/2018 04/30/2018
Note: Held By: DREWIS Provide a riser diagram. Daniel Rewis 986-4736
PLUM COMPLETE 04/27/2018 05/03/2018
Note: Released By: FREODICA
MECH HOLD 04/27/2018 05/03/2018
Note: Held By: FREODICA Address shown on energy calculations does not match with plans. Coordinate per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734.
BLD COMPLETE 04/27/2018 05/01/2018
Note: Released By: JHINDMAN
SWALE COMPLETE 04/16/2018 04/25/2018
Note: Released By: TBAKER
BLD HOLD 04/10/2018 04/12/2018
Note: Held By: JHINDMAN 1. Identify the locations of the anchors for the truss to wall connections. 6th ed. FBC R 107.3.5.J. Hindman 986-3784.
ELEC HOLD 04/10/2018 04/11/2018
Note: Held By: JHINDMAN 1.Provide electrical receptacles at bedrooms 2 and 3 on the wall with the smoke detector per 6th ed. FBC RE3901.2.2. 2. Provide an electrical riser diagram and electrical load calculations 2014 NEC art 220. J. Hindman 986-3784.
ENGIN1 COMPLETE 04/10/2018 04/16/2018
Note: Released By: TBAKER
MECH HOLD 04/10/2018 04/12/2018
Note: Held By: FREODICA 1. Energy calculations shall be signed by the owner/agent for energy code compliance certification per FBCEC 6th ed. R405.3. 2. Energy calculations and Energy performance level (EPL) display card shall be correctly/completely filled- out on items 2,3,12 and 13; design location - either St. Agustine or Daytona beach, Jurisdiction for clarity per FBC 6th 107.2.1. F.Reodica -386-986-4734.
PLUM HOLD 04/10/2018 04/12/2018
Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
SW1 COMPLETE 04/10/2018 04/12/2018
Note: Released By: JHINDMAN
UD1 HOLD 04/10/2018 04/11/2018
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 04/10/2018 04/11/2018
Note: Held By: AMOBLEY Landscape plan should state sod type and if irrigation will be installed Ac pad should be screened with 7 gallon shrubs Must have shrubs wrapping both corners of house

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/22/2019
REINSPECTION FEE ¤40.00 05/22/2019
REINSPECTION FEE ¤40.00 05/22/2019
NEW RESIDENTIAL INSPECTIONS ¤766.00 05/30/2018
SITE PLAN 20 ¤20.00 05/30/2018
SURCHARGE FS 533.721 ¤18.29 05/30/2018
SURCHARGE - FS 468.631 ¤27.43 05/30/2018
STORM WATER PERMIT FEES ¤80.00 05/30/2018
TRANSPORTATION IMPACT FEE/MULT ¤2,532.00 05/30/2018
3% TRANS IMPACT FEE CREDIT (¤75.96) 05/30/2018
ADMIN FEE ¤20.00 05/30/2018
ELECTRIC FEE ¤289.80 05/30/2018
3% FIRE IMPACT FEE CREDIT (¤13.13) 05/30/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤437.58 05/30/2018
IMPACT FEE PARKS ¤1,698.48 05/30/2018
IMPACT FEE SCHOOL ¤7,200.00 05/30/2018
MECHANICAL FEE ¤289.80 05/30/2018
3% PARKS IMPACT FEE CREDIT (¤50.95) 05/30/2018
PLAN CHECK FEE ¤153.20 05/30/2018
PLUMBING FEE ¤289.80 05/30/2018
Fees Total Due: ¤0.00 Total Paid: ¤13,802.34