Permit #2018040527
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00020-0081 |
| CONDITIONED SPACE: 1461 sqft |
| CONDITIONED SPACE: 1461 sqft |
| GARAGE: 510 sqft |
| GARAGE: 510 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| Total Square Footage: 4358 sqft |
| Block: 00020 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 386-445-9055 |
| Location Address: 6 ZORLOU CT |
| Type: TH2 - TOWNHOUSE -2 UNIT (INFILL LOT) |
| Issue Date: 05/30/2018 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: COOPER MELISSA LYNN & SYLVIA M SHEPPARD |
|
Address 63 LAKE SUCCESS DR PALM COAST, FL 32137 |
| Lot: 0081 |
| Contracted Stated Job Value: ¤230,000.00 |
| Job Description: SIDE A - 2 UNIT TOWNHOUSE |
| Type: CN |
Contractor
SUN STATE CUSTOM BUILDERS, LLC
| Status | Location Address | State License Number |
| CANCEL |
946 SHADICH DRIVE ORANGE CITY, FL |
CGC1519145 (Exp: 08/31/2022) |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/07/2019 | FINAL APPROVED | DROCKWELL |
| BLD - BUILDING FINAL | 06/06/2019 | CANCELLED BY INSPECTOR | RLEE |
| Note: Wrong inspection date | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2019 | APPROVED | KHOWELL |
| Note: THIS WAS APPROVED ON 5-16-19 NOW DUPLEX HAS BEEN RE-CLASSIFIED TO A TOWNHOUSE | |||
| ROW - FINAL APRON (AFTER POUR) | 05/21/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 05/21/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/16/2019 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 04/08/2019 | Disapproved - NO FEE | KHOWELL |
| Note: FINAL CITY APPROVED SURVEY, SWALE SHEET AND PROPOSED SITE ARE REQUIRED TO BE ON SITE FOR THIS INSPECTION PINNED TOGETHER IN THE DOC BOX. REPAIR All ROAD DAMAGE MARKED WITH PAINT. SOD THE BARE AREAS IN THE CENTER ISLAND. SOD IS NOT ALLOWED TO COVER THE BOTTOM OF THE FENCE | |||
| ROW - DRAINAGE | 04/08/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 04/08/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: CLEAN ALL THE DIRT AND CONCRETE OUT OF THE CULVERT PIPES FOR INSPECTION AND FINAL CITY APPROVED SURVEY, SWALE SHEET AND PROPOSED SITE ARE REQUIRED TO BE ON SITE FOR THIS INSPECTION PINNED TOGETHER IN THE DOC BOX | |||
| U -UTILITY RESIDENTIAL FINAL | 04/08/2019 | FINAL APPROVED | AHALL |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 04/05/2019 | Disapproved - NO FEE | AHALL |
| Note: no power to B side Pep Panel | |||
| ROW - DRAINAGE | 03/19/2019 | Disapproved - NO FEE | KHOWELL |
| Note: GET THE SWALE OPEN AT BOTH 6 AND 8 ZORLOU, NOT ALLOWED TO BE BLOCKED | |||
| ROW- PRE-APRON (PRE-POUR) | 03/19/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: Bob called in this inspection ADJUST MITERED END FORM BOARDS TO CITY STANDARDS ON THE RIGHT SIDE DRIVEWAY. RAIN IN FORCAST SO RECHECK ELEVATIONS. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2019 | CANCELLED BY APPLICANT | AIRS WEB |
| ROW- PRE-APRON (PRE-POUR) | 03/14/2019 | CANCELLED BY APPLICANT | AIRS WEB |
| ELECTRIC - EARLY POWER | 03/12/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 10:45 | |||
| U -UTILITY RESIDENTIAL FINAL | 03/11/2019 | CANCELLED BY INSPECTOR | AHALL |
| Note: Not ready, no power, cleanouts not complete, meter box not to grade | |||
| U - SEWER TIE IN | 02/28/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/28/2019 | APPROVED | JGIBSON |
| INSULATION | 12/12/2018 | APPROVED | DROCKWELL |
| ALL ROUGH | 12/04/2018 | APPROVED - AS NOTED | DROCKWELL |
| Note: Dryer duct is outside of wall in garage/Bath exhaust must terminate a min 3ft from openings in exterior wall.Will check at next inspection | |||
| FIREWALL | 12/03/2018 | APPROVED | DROCKWELL |
| FIREWALL | 11/30/2018 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL Firewall incomplete Drywall missining in areas on both sides and not taped or finished | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/14/2018 | APPROVED | DROCKWELL |
| LATH/BRICK/ WATER BARRIER | 11/14/2018 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 10/31/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/31/2018 | Disapproved - NO FEE | DROCKWELL |
| Note: No plans on job/Bearing kneewall above roof must be anchored to roof below | |||
| TIE BEAM / LINTEL | 09/28/2018 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 09/27/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 08/21/2018 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/15/2018 | APPROVED | JGIBSON |
| STEM WALL FOUNDATION | 07/18/2018 | APPROVED | CMINI |
| FOOTER | 07/02/2018 | APPROVED | DROCKWELL |
| FOOTER | 06/29/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Footer has standing water/Many areas not meeting minimum clearance from ground for steel | |||
| FOOTER | 06/28/2018 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: ok per Rick Lee |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/06/2019 | 06/06/2019 |
| Note: Released By: RLEE | |||
| BLD | HOLD | 04/24/2019 | 04/26/2019 |
| Note: Held By: RLEE Development order has been issued for lot split for townhouses. A separate permit and a permit modification for this duplex to convert to townhouse. Both permit applications to show new parcel Ids and addressses. Separate finals and COs will have to be issued The final survey to show the lot split. | |||
| SW1 | HOLD | 04/08/2019 | 04/15/2019 |
| Note: Held By: JHINDMAN final survey must show positive drainage to the front of the propery and cannot flow onto adjacent properties per ULDC Tech manual ch5 300. | |||
| SW1 | COMPLETE | 09/24/2018 | 09/27/2018 |
| Note: Released By: DREWIS rev foundation | |||
| SW1 | HOLD | 09/17/2018 | 09/17/2018 |
| Note: Held By: DREWIS FOUNDATION S Provide a single site plan with FFE and set back elevations. Daniel Rewis 986-4736 | |||
| BLD | COMPLETE | 07/12/2018 | 07/17/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 05/18/2018 | 05/21/2018 |
| Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 05/14/2018 | 05/14/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 05/14/2018 | 05/15/2018 |
| Note: Released By: DREWIS | |||
| UD1 | HOLD | 05/14/2018 | 05/17/2018 |
| Note: Held By: MBACON Same notes as before. Please show both PEP panels on same side as PEP tank | |||
| ZON | HOLD | 05/08/2018 | 05/08/2018 |
| Note: Held By: AMOBLEY Shrubs must wrap both corners of house | |||
| ELEC | HOLD | 05/08/2018 | 05/09/2018 |
| Note: Held By: DREWIS Riser diagram provided only depicts a single service and panel. Daniel Rewis 986-4736 | |||
| MECH | COMPLETE | 05/08/2018 | 05/11/2018 |
| Note: Released By: FREODICA | |||
| UD1 | HOLD | 05/08/2018 | 05/11/2018 |
| Note: Held By: MBACON Both PEP panels must be located on the same side as the PEP tank please show both panels on the same side and remove the panel shown on the wrong side. | |||
| UD1 | HOLD | 04/27/2018 | 05/04/2018 |
| Note: Held By: LFITZGERALD PEP Panels not shown on correct side of building on electrical plans PEP Panel is not shown on the same side as the tank in the electrical plan as the utility marked site plans. Submit a new electrical plan showing PEP Panel on the same side of the building as indicated in the Utility marked site plan | |||
| ZON | HOLD | 04/27/2018 | 04/27/2018 |
| Note: Held By: AMOBLEY Landscape plan should state sod type and if irrigation will be installed | |||
| ELEC | HOLD | 04/27/2018 | 04/30/2018 |
| Note: Held By: DREWIS Provide a riser diagram. Daniel Rewis 986-4736 | |||
| PLUM | COMPLETE | 04/27/2018 | 05/03/2018 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 04/27/2018 | 05/03/2018 |
| Note: Held By: FREODICA Address shown on energy calculations does not match with plans. Coordinate per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 04/27/2018 | 05/01/2018 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 04/16/2018 | 04/25/2018 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 04/10/2018 | 04/12/2018 |
| Note: Held By: JHINDMAN 1. Identify the locations of the anchors for the truss to wall connections. 6th ed. FBC R 107.3.5.J. Hindman 986-3784. | |||
| ELEC | HOLD | 04/10/2018 | 04/11/2018 |
| Note: Held By: JHINDMAN 1.Provide electrical receptacles at bedrooms 2 and 3 on the wall with the smoke detector per 6th ed. FBC RE3901.2.2. 2. Provide an electrical riser diagram and electrical load calculations 2014 NEC art 220. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 04/10/2018 | 04/16/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 04/10/2018 | 04/12/2018 |
| Note: Held By: FREODICA 1. Energy calculations shall be signed by the owner/agent for energy code compliance certification per FBCEC 6th ed. R405.3. 2. Energy calculations and Energy performance level (EPL) display card shall be correctly/completely filled- out on items 2,3,12 and 13; design location - either St. Agustine or Daytona beach, Jurisdiction for clarity per FBC 6th 107.2.1. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 04/10/2018 | 04/12/2018 |
| Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 04/10/2018 | 04/12/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | HOLD | 04/10/2018 | 04/11/2018 |
| Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 04/10/2018 | 04/11/2018 |
| Note: Held By: AMOBLEY Landscape plan should state sod type and if irrigation will be installed Ac pad should be screened with 7 gallon shrubs Must have shrubs wrapping both corners of house |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/22/2019 |
| REINSPECTION FEE | ¤40.00 | 05/22/2019 |
| REINSPECTION FEE | ¤40.00 | 05/22/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤766.00 | 05/30/2018 |
| SITE PLAN 20 | ¤20.00 | 05/30/2018 |
| SURCHARGE FS 533.721 | ¤18.29 | 05/30/2018 |
| SURCHARGE - FS 468.631 | ¤27.43 | 05/30/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/30/2018 |
| TRANSPORTATION IMPACT FEE/MULT | ¤2,532.00 | 05/30/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤75.96) | 05/30/2018 |
| ADMIN FEE | ¤20.00 | 05/30/2018 |
| ELECTRIC FEE | ¤289.80 | 05/30/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤13.13) | 05/30/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤437.58 | 05/30/2018 |
| IMPACT FEE PARKS | ¤1,698.48 | 05/30/2018 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 05/30/2018 |
| MECHANICAL FEE | ¤289.80 | 05/30/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 05/30/2018 |
| PLAN CHECK FEE | ¤153.20 | 05/30/2018 |
| PLUMBING FEE | ¤289.80 | 05/30/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,802.34 |