Permit #2018040540
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7010-00060-0290 |
| OPENED PORCH (WITH ROOF) : 990 sqft |
| Total Square Footage: 990 sqft |
| Block: 00060 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-237-8637 |
| Location Address: 80 FOREST GROVE DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 06/20/2018 |
| NOC: Unknown |
| Applicant name: ERIC GLENN SAMUELSON |
| Owner: GUILBE LUIS A & MYRTA H&W |
|
Address 80 FOREST GROVE DRIVE PALM COAST, FL 32137 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤42,000.00 |
| Job Description: BUILD POOL HOUSE PATIO ADDITION WITH ROOF |
| Type: CN |
Contractor
OUTBACK MARINE CONSTRUCTION
| Status | Location Address | State License Number | Phone |
| ACTIVE |
597 JOHN ANDERSON HWY FLAGLER BEACH, FL 32181 |
CBC1257381 (Exp: 08/31/2026) | 386-237-8637 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
ANTONIO MANUEL MADALENA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 731089 HOLLY HILL, FL 32117 |
CAC1816500 (Exp: 08/31/2026) | 386-252-1247 |
CHARLES COURTNEY MCHONE JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
239 SR 16 ST. AUGUSTINE, FL 32095 |
CCC1330877 (Exp: 08/31/2026) | 904-669-8037 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/07/2019 | APPROVED | MWILLIAMS |
| ROW - FINAL INSPECTION | 01/04/2019 | APPROVED - AS NOTED | RGROSS |
| Note: SEED/STRAW/SOD ON ITS WAY TO COVER BARE EARTH AREAS ABOVE THE ROW. ON SITE WITH CONTRACTOR. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/04/2019 | FINAL APPROVED | JNICHOLS |
| FINAL SURVEY (OFFICE USE ONLY) | 12/05/2018 | APPROVED | DREWIS |
| U - SEWER TIE IN | 11/16/2018 | APPROVED | JGIBSON |
| ALL ROUGH | 10/09/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/09/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 10/08/2018 | CANCELLED BY APPLICANT | STHOMAS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/05/2018 | Disapproved - NO FEE | WMILLER |
| Note: MISSING CORNER BEADS | |||
| ALL ROUGH | 10/05/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: MISSING BATH EXHAUST DUCT MISSING WINDOW | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/02/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: need approved revision plans call for lentel (lam beam was used) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/02/2018 | APPROVED - AS NOTED | WMILLER |
| Note: THIS IS A REINSPECTION failed prior today... plans did not match construction.... contractor met with me later and found the plans stuffed into the bottom of the box under all aother papers. plans now match the construction. fee removed result passed | |||
| TIE BEAM / LINTEL | 09/07/2018 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 09/06/2018 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 08/06/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 08/03/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION (NO CHANGE FROM LAST INSPECTOON) MINIMUM DEPTH OF FOOTINGS AT COLLUMNS NOT MET | |||
| MONOLITHIC SLAB | 08/02/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION MINIMUM DEPTH OF FOOTINGS AT COLLUMNS NOT MET | |||
| MONOLITHIC SLAB | 08/01/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION cancelled per bill via phone call | |||
| MONOLITHIC SLAB | 07/20/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED DETAILS FOR COLLUMN PADS NEED COMPACTION REPORT | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/12/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/04/2018 | 12/05/2018 |
| Note: Released By: DREWIS final | |||
| SW1 | COMPLETE | 09/05/2018 | 09/06/2018 |
| Note: Released By: JHINDMAN foundation | |||
| BLD | COMPLETE | 08/29/2018 | 09/04/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 07/27/2018 | 07/31/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 06/18/2018 | 06/18/2018 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 06/05/2018 | 06/06/2018 |
| Note: Held By: AMOBLEY We will create the termination of easement agreement and will email to you to have signed by owners and notarized. City utilities will also have to release easement before permit can be released | |||
| SW1 | COMPLETE | 05/31/2018 | 06/07/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 05/31/2018 | 06/06/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 05/31/2018 | 06/01/2018 |
| Note: Held By: AMOBLEY Will need the termination application request so we can create agreement. Will email a copy of what we are looking for. | |||
| PLUM | COMPLETE | 05/31/2018 | 06/04/2018 |
| Note: Released By: FREODICA | |||
| MECH | COMPLETE | 05/31/2018 | 06/04/2018 |
| Note: Released By: FREODICA | |||
| PLUM | HOLD | 04/11/2018 | 04/13/2018 |
| Note: Held By: FREODICA 1. Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| MECH | HOLD | 04/11/2018 | 04/13/2018 |
| Note: Held By: FREODICA Provide bathroom ventialtion per FBCM 6th ed. 401.2. F.Reodica -386-986-4734.. | |||
| ELEC | COMPLETE | 04/11/2018 | 04/11/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 04/10/2018 | 04/11/2018 |
| Note: Held By: JHINDMAN 1. Provide Florida Product Approval for the doors. F.S.S.553.2. Provide a roof truss layout from the truss engineer.6th ed. FBC 107.3.5. | |||
| SW1 | HOLD | 04/10/2018 | 04/11/2018 |
| Note: Held By: JHINDMAN 1. Provide a site plan tha shows the location of the addition and the proposed drainage around it. | |||
| ZON | HOLD | 04/10/2018 | 04/11/2018 |
| Note: Held By: TAWILLIAMS 1)Show the proposed screened patio pn site plan with setbacks to property lines. 2)If proposed structure will being crossing the easement, it will need to be terminated. 3)Plans and application description doesn't match. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/01/2018 |
| REVISION | ¤40.00 | 08/01/2018 |
| SITE PLAN 20 | ¤20.00 | 06/20/2018 |
| SURCHARGE FS 533.721 | ¤3.76 | 06/20/2018 |
| SURCHARGE - FS 468.631 | ¤5.63 | 06/20/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/20/2018 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 06/20/2018 |
| ADMIN FEE | ¤20.00 | 06/20/2018 |
| ELECTRIC FEE | ¤85.20 | 06/20/2018 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 06/20/2018 |
| MECHANICAL FEE | ¤85.20 | 06/20/2018 |
| PLAN CHECK FEE | ¤40.00 | 06/20/2018 |
| PLUMBING FEE | ¤85.20 | 06/20/2018 |
| REINSPECTION FEE | ¤40.00 | |
| REVISION | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| Fees | Total Due: ¤160.00 | Total Paid: ¤580.49 |