I want to search for...

Permit #2018040545

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00230-0080
CONDITIONED SPACE: 2201 sqft
GARAGE: 462 sqft
OPENED PORCH (WITH ROOF) : 290 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
Total Square Footage: 3041 sqft
Block: 00230
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: (386)446-5161
Location Address: 18 FALLWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/03/2018
NOC: RECORDED
Applicant name: HUGO A CAMACHO
Owner: IDEAL HOMES AT PALM COAST INC INC

Address

PO BOX 353639

PALM COAST, FL 32135

Lot: 0080
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

IDEAL HOMES AT PALM COAST, INC.
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 353639

PALM COAST, FL 32137

CBC1250774 (Exp: 08/31/2026) (386)446-5161 (386)447-0238

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOANNA S REELEY
Status Location Address State License Number Phone
INACTIVE

2 MARKET PLACE D

PALM COAST, FL 32137

CCC1327485 (Exp: 08/31/2020) 386-445-7945

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/05/2019 FINAL APPROVED WMILLER
Note: final approved
ROW - FINAL APRON (AFTER POUR) 02/19/2019 APPROVED RGROSS
ROW - FINAL INSPECTION 02/19/2019 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 02/19/2019 APPROVED - AS NOTED AHALL
Note: Replace Clean out cap in the yard with a flush cap.
FINAL SURVEY (OFFICE USE ONLY) 02/15/2019 APPROVED RLEE
ROW- PRE-APRON (PRE-POUR) 01/22/2019 APPROVED - AS NOTED RGROSS
Note: CULVERT IS LEVEL AT THE HIGH END TOLERANCE. ON SITE WITH CONTRACOTOR. DO NOT ALLOW CULVERT TO MOVE WHILE POURING. READY TO POUR.
GRAVITY SEWER TEST 01/03/2019 APPROVED JGIBSON
U - SEWER TIE IN 01/03/2019 APPROVED - AS NOTED JGIBSON
Note: plumber sent vedio
ELECTRIC - EARLY POWER 12/27/2018 APPROVED JHINDMAN
LATH/BRICK/ WATER BARRIER 11/13/2018 APPROVED WMILLER
Note: APPROVED
INSULATION 10/23/2018 APPROVED WMILLER
Note: APPROVED
ALL ROUGH 10/18/2018 APPROVED - AS NOTED WMILLER
Note: 1. FIREBLOCKING R302.11 1-6 (KITCHEN AREA BY RANGE VENT) (WILL FOR THIS AT INSULATION)
ALL ROUGH 10/17/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 (LOW VOLTAGE DINING ROOM) 2. ALL METAL BOXES SHALL BE GROUNDED R,E 3905.2 AND NEC.314.4 (COACH LIGHT RIGHT SIDE OF GARAGE GROUND LUG LOOSE) 3. FIREBLOCKING R302.11 1-6 (KITCHEN AREA BY VENT AND BACK OF TEE WALL)
ROOF VALLEY & METAL 10/15/2018 APPROVED WMILLER
Note: APPROVED
ROOF VALLEY & METAL 10/11/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. VALLEY FLASHING, R905.2.8.2 2. FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. ALL LAPS SHALL BE A MINIMUM OF 4in. FULLY SEALED IN APPROVED FLASHING CEMENTTHE ENTIRE EDGE OF THE HORIZONTAL FLANGE SHALL BE SEALED COVERING ALL NAIL PENITRATIONS WITH APPROVED FLASHING CEMENT AND MEMBRANE. FLASHING SHALL START AT THE LOWER PROTION OF THE ROOF TO ENSURE WATER-SHEDDING CAPABILITIES OF ALL METAL LAPS.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/09/2018 APPROVED WMILLER
Note: approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/24/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. MISSING 2X12's CALLED OUT ON FOUNDATION PLAN IN MASGTER BEDROOM AREA 2. CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH
TIE BEAM / LINTEL 07/20/2018 Disapproved -FEE REQUIRED WMILLER
Note: OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION 26.. WITH (MARKED ON PLANS)
TIE BEAM / LINTEL 07/20/2018 APPROVED - AS NOTED WMILLER
Note: THIS IS A REINSPECTION RESULTED INCORRECTLY EARLIER TODAY, FEE HAS BEEN REMOVED AND RESULT IS PASS
FOUND SURVEY APPROVED (OFFICE) 07/11/2018 APPROVED DREWIS
MONOLITHIC SLAB 06/22/2018 APPROVED WMILLER
PLUMBING 1ST ROUGH UNDERGROUND 06/15/2018 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 02/15/2019 02/15/2019
Note: Released By: RLEE Final S
ZON COMPLETE 11/19/2018 11/19/2018
Note: Released By: AMOBLEY
SW1 COMPLETE 11/19/2018 11/20/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 11/19/2018 11/26/2018
Note: Released By: TBAKER
UD1 COMPLETE 11/19/2018 11/20/2018
Note: Released By: MBACON
BLD COMPLETE 10/04/2018 10/08/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 07/10/2018 07/11/2018
Note: Released By: DREWIS Foundation survey
MECH COMPLETE 04/24/2018 04/25/2018
Note: Released By: FREODICA
BLD COMPLETE 04/24/2018 04/30/2018
Note: Released By: JHINDMAN
SWALE COMPLETE 04/16/2018 04/26/2018
Note: Released By: TBAKER
BLD HOLD 04/11/2018 04/13/2018
Note: Held By: JHINDMAN 1. Provide a roof truss layout from the truss engineer. 6th ed. FBC 107.3.5. J. Hindman 986-3784.
ELEC COMPLETE 04/11/2018 04/13/2018
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 04/11/2018 04/16/2018
Note: Released By: TBAKER
MECH HOLD 04/11/2018 04/13/2018
Note: Held By: FREODICA Provide balanced return air at study room ( mistakenly named as dining) on hvac plan per FBCR 6th ed. M1602.3). F.Reodica -386-986-4734.
PLUM COMPLETE 04/11/2018 04/13/2018
Note: Released By: FREODICA
SW1 COMPLETE 04/11/2018 04/12/2018
Note: Released By: JHINDMAN
UD1 COMPLETE 04/11/2018 04/16/2018
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 04/11/2018 04/12/2018
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/07/2019
REINSPECTION FEE ¤40.00 03/07/2019
REINSPECTION FEE ¤40.00 03/07/2019
REVISION ¤40.00 03/07/2019
SITE PLAN 20 ¤20.00 05/03/2018
SURCHARGE FS 533.721 ¤13.92 05/03/2018
SURCHARGE - FS 468.631 ¤20.88 05/03/2018
STORM WATER PERMIT FEES ¤80.00 05/03/2018
3% TRANS IMPACT FEE CREDIT (¤93.74) 05/03/2018
NEW RESIDENTIAL INSPECTIONS ¤558.00 05/03/2018
ADMIN FEE ¤20.00 05/03/2018
ELECTRIC FEE ¤227.40 05/03/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 05/03/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 05/03/2018
IMPACT FEE PARKS ¤849.24 05/03/2018
IMPACT FEE SCHOOL ¤3,600.00 05/03/2018
IMPACT FEE TRANSPORTATION ¤3,124.67 05/03/2018
MECHANICAL FEE ¤227.40 05/03/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/03/2018
PLAN CHECK FEE ¤111.60 05/03/2018
PLUMBING FEE ¤227.40 05/03/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,333.52