Permit #2018040545
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00230-0080 |
| CONDITIONED SPACE: 2201 sqft |
| GARAGE: 462 sqft |
| OPENED PORCH (WITH ROOF) : 290 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 3041 sqft |
| Block: 00230 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: (386)446-5161 |
| Location Address: 18 FALLWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/03/2018 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: IDEAL HOMES AT PALM COAST INC INC |
|
Address PO BOX 353639 PALM COAST, FL 32135 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/05/2019 | FINAL APPROVED | WMILLER |
| Note: final approved | |||
| ROW - FINAL APRON (AFTER POUR) | 02/19/2019 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 02/19/2019 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 02/19/2019 | APPROVED - AS NOTED | AHALL |
| Note: Replace Clean out cap in the yard with a flush cap. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/15/2019 | APPROVED | RLEE |
| ROW- PRE-APRON (PRE-POUR) | 01/22/2019 | APPROVED - AS NOTED | RGROSS |
| Note: CULVERT IS LEVEL AT THE HIGH END TOLERANCE. ON SITE WITH CONTRACOTOR. DO NOT ALLOW CULVERT TO MOVE WHILE POURING. READY TO POUR. | |||
| GRAVITY SEWER TEST | 01/03/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 01/03/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: plumber sent vedio | |||
| ELECTRIC - EARLY POWER | 12/27/2018 | APPROVED | JHINDMAN |
| LATH/BRICK/ WATER BARRIER | 11/13/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| INSULATION | 10/23/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ALL ROUGH | 10/18/2018 | APPROVED - AS NOTED | WMILLER |
| Note: 1. FIREBLOCKING R302.11 1-6 (KITCHEN AREA BY RANGE VENT) (WILL FOR THIS AT INSULATION) | |||
| ALL ROUGH | 10/17/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 (LOW VOLTAGE DINING ROOM) 2. ALL METAL BOXES SHALL BE GROUNDED R,E 3905.2 AND NEC.314.4 (COACH LIGHT RIGHT SIDE OF GARAGE GROUND LUG LOOSE) 3. FIREBLOCKING R302.11 1-6 (KITCHEN AREA BY VENT AND BACK OF TEE WALL) | |||
| ROOF VALLEY & METAL | 10/15/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF VALLEY & METAL | 10/11/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. VALLEY FLASHING, R905.2.8.2 2. FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. ALL LAPS SHALL BE A MINIMUM OF 4in. FULLY SEALED IN APPROVED FLASHING CEMENTTHE ENTIRE EDGE OF THE HORIZONTAL FLANGE SHALL BE SEALED COVERING ALL NAIL PENITRATIONS WITH APPROVED FLASHING CEMENT AND MEMBRANE. FLASHING SHALL START AT THE LOWER PROTION OF THE ROOF TO ENSURE WATER-SHEDDING CAPABILITIES OF ALL METAL LAPS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/09/2018 | APPROVED | WMILLER |
| Note: approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/24/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. MISSING 2X12's CALLED OUT ON FOUNDATION PLAN IN MASGTER BEDROOM AREA 2. CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH | |||
| TIE BEAM / LINTEL | 07/20/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION 26.. WITH (MARKED ON PLANS) | |||
| TIE BEAM / LINTEL | 07/20/2018 | APPROVED - AS NOTED | WMILLER |
| Note: THIS IS A REINSPECTION RESULTED INCORRECTLY EARLIER TODAY, FEE HAS BEEN REMOVED AND RESULT IS PASS | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/11/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 06/22/2018 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/15/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/15/2019 | 02/15/2019 |
| Note: Released By: RLEE Final S | |||
| ZON | COMPLETE | 11/19/2018 | 11/19/2018 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 11/19/2018 | 11/20/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 11/19/2018 | 11/26/2018 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 11/19/2018 | 11/20/2018 |
| Note: Released By: MBACON | |||
| BLD | COMPLETE | 10/04/2018 | 10/08/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 07/10/2018 | 07/11/2018 |
| Note: Released By: DREWIS Foundation survey | |||
| MECH | COMPLETE | 04/24/2018 | 04/25/2018 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 04/24/2018 | 04/30/2018 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 04/16/2018 | 04/26/2018 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 04/11/2018 | 04/13/2018 |
| Note: Held By: JHINDMAN 1. Provide a roof truss layout from the truss engineer. 6th ed. FBC 107.3.5. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 04/11/2018 | 04/13/2018 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 04/11/2018 | 04/16/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 04/11/2018 | 04/13/2018 |
| Note: Held By: FREODICA Provide balanced return air at study room ( mistakenly named as dining) on hvac plan per FBCR 6th ed. M1602.3). F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 04/11/2018 | 04/13/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 04/11/2018 | 04/12/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 04/11/2018 | 04/16/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 04/11/2018 | 04/12/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/07/2019 |
| REINSPECTION FEE | ¤40.00 | 03/07/2019 |
| REINSPECTION FEE | ¤40.00 | 03/07/2019 |
| REVISION | ¤40.00 | 03/07/2019 |
| SITE PLAN 20 | ¤20.00 | 05/03/2018 |
| SURCHARGE FS 533.721 | ¤13.92 | 05/03/2018 |
| SURCHARGE - FS 468.631 | ¤20.88 | 05/03/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/03/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 05/03/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤558.00 | 05/03/2018 |
| ADMIN FEE | ¤20.00 | 05/03/2018 |
| ELECTRIC FEE | ¤227.40 | 05/03/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 05/03/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 05/03/2018 |
| IMPACT FEE PARKS | ¤849.24 | 05/03/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/03/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 05/03/2018 |
| MECHANICAL FEE | ¤227.40 | 05/03/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/03/2018 |
| PLAN CHECK FEE | ¤111.60 | 05/03/2018 |
| PLUMBING FEE | ¤227.40 | 05/03/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,333.52 |