I want to search for...

Permit #2018040547

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00020-0071
CONDITIONED SPACE: 1461 sqft
CONDITIONED SPACE: 1461 sqft
GARAGE: 510 sqft
GARAGE: 510 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 4390 sqft
Block: 00020
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 386-445-9055
Location Address: 8 ZORLOU CT
Type: TH2 - TOWNHOUSE -2 UNIT (INFILL LOT)
Issue Date: 05/30/2018
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: SOUSA BRIAN

Address

8 A ZORLOU COURT

PALM COAST, FL 32164

Lot: 0071
Contracted Stated Job Value: ¤230,000.00
Job Description: SIDE A - 2 UNIT TOWNHOUSE
Type: CN

Contractor

SUN STATE CUSTOM BUILDERS, LLC
Status Location Address State License Number
CANCEL

946 SHADICH DRIVE

ORANGE CITY, FL

CGC1519145 (Exp: 08/31/2022)

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/12/2019 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 06/10/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: THIS IS A REINSPECTION/Exhaust ducts not in termination caps left side soffit
BLD - BUILDING FINAL 06/07/2019 CANCELLED BY APPLICANT DROCKWELL
FINAL SURVEY (OFFICE USE ONLY) 06/03/2019 APPROVED KHOWELL
Note: THIS WAS APPROVED ON 5-16-19 NOW DUPLEX HAS BEEN RE-CLASSIFIED TO A TOWNHOUSE
ROW - FINAL APRON (AFTER POUR) 05/21/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 05/21/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 05/16/2019 APPROVED KHOWELL
ROW - FINAL INSPECTION 04/08/2019 Disapproved - NO FEE KHOWELL
Note: FINAL CITY APPROVED SURVEY, SWALE SHEET AND PROPOSED SITE ARE REQUIRED TO BE ON SITE FOR THIS INSPECTION PINNED TOGETHER IN THE DOC BOX. REPAIR All ROAD DAMAGE MARKED WITH PAINT. SOD THE BARE AREAS IN THE CENTER ISLAND. SOD IS NOT ALLOWED TO COVER THE BOTTOM OF THE FENCE
ROW - FINAL APRON (AFTER POUR) 04/08/2019 Disapproved -FEE REQUIRED KHOWELL
Note: CLEAN ALL THE DIRT AND CONCRETE OUT OF THE CULVERT PIPES FOR INSPECTION AND FINAL CITY APPROVED SURVEY, SWALE SHEET AND PROPOSED SITE ARE REQUIRED TO BE ON SITE FOR THIS INSPECTION PINNED TOGETHER IN THE DOC BOX
U -UTILITY RESIDENTIAL FINAL 04/05/2019 FINAL APPROVED AHALL
ROW- PRE-APRON (PRE-POUR) 03/15/2019 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION MOVE THE RIGHT SIDE ROAD FORM THAT WAS TALKED ABOUT ON SITE WITH CONCRETE CONTRACTOR AND DIG OUT FOOTERS. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 03/14/2019 CANCELLED BY APPLICANT KHOWELL
ELECTRIC - EARLY POWER 03/12/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 10:45
U -UTILITY RESIDENTIAL FINAL 03/11/2019 CANCELLED BY INSPECTOR AHALL
Note: Not ready, no power, cleanouts not complete, mete box not to grade
U - SEWER TIE IN 02/28/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 02/28/2019 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 11/13/2018 APPROVED DROCKWELL
INSULATION 11/13/2018 APPROVED DROCKWELL
ALL ROUGH 11/08/2018 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 11/01/2018 Disapproved - NO FEE DROCKWELL
Note: Cannot apply stucco directly to interior grade drywall at party wall. 2 layers of barrier and wire lath required
ALL ROUGH 11/01/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: No water pressure on supply side/Frame dryer vent
FIREWALL 10/31/2018 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/15/2018 APPROVED DROCKWELL
ROOF VALLEY & METAL 10/12/2018 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/12/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: Anchor 2x rafters to trusses below/Anchor knee walls to trusses below/Complete framing between units at entry
TIE BEAM / LINTEL 10/12/2018 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 10/12/2018 APPROVED DREWIS
MONOLITHIC SLAB 08/21/2018 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 08/15/2018 APPROVED JGIBSON
STEM WALL FOUNDATION 07/18/2018 APPROVED CMINI
FOOTER 07/02/2018 APPROVED DROCKWELL
FOOTER 06/29/2018 Disapproved - NO FEE DROCKWELL
Note: Steel must be continous around corners/Sttel not meeting minimum clearance from ground
FOOTER 06/28/2018 CANCELLED BY APPLICANT DROCKWELL
Note: ok per Rick Lee

Review History

Department Status Date In Date Out
BLD COMPLETE 06/06/2019 06/06/2019
Note: Released By: RLEE
BLD HOLD 04/24/2019 04/26/2019
Note: Held By: RLEE Development order has been issued for lot split for townhouses. A separate permit and a permit modification for this duplex to convert to townhouse. Both permit applications to show new parcel Ids and addressses. Separate finals and COs will have to be issued The final survey to show the lot split.
SW1 HOLD 04/08/2019 04/15/2019
Note: Held By: JHINDMAN final survey must show positive drainage to the front of the propery and cannot flow onto adjacent properties per ULDC Tech manual ch5 300.
SW1 COMPLETE 10/12/2018 10/12/2018
Note: Released By: DREWIS
SW1 HOLD 09/24/2018 09/26/2018
Note: Held By: DREWIS Contractor cert is not active. Please contact Building Dept at 386-986-3780
SW1 HOLD 09/17/2018 09/17/2018
Note: Held By: DREWIS FOUNDATION S Provide a single site plan of the residence as a whole with set backs and and FFE. Daniel Rewis 986-4736
BLD COMPLETE 07/12/2018 07/17/2018
Note: Released By: JHINDMAN
ZON HOLD 05/29/2018 05/29/2018
Note: Held By: TAWILLIAMS Repeat comment: Site plan must depict side setbacks of proposed duplex. They are written on landscape plan but must be on the site plan as well. Landscape plan: Must depict what type of magnolia trees are being used.
ZON COMPLETE 05/29/2018 05/30/2018
Note: Released By: TAWILLIAMS
ZON HOLD 05/25/2018 05/29/2018
Note: Held By: TAWILLIAMS
ZON HOLD 05/21/2018 05/22/2018
Note: Held By: AMOBLEY Landscape plan must depict sod type and irrigation if required. Site plan must depict side setbacks of proposed duplex. They are written on landscape plan but must be on the site plan as well.
UD1 COMPLETE 05/14/2018 05/16/2018
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
UD1 HOLD 05/08/2018 05/11/2018
Note: Held By: MBACON Both Pep panels must be located on the same side as the PEP tank. Please show that in the Electrical plan and remove the one from the wrong side.
MECH COMPLETE 04/27/2018 05/03/2018
Note: Released By: FREODICA
PLUM COMPLETE 04/27/2018 05/03/2018
Note: Released By: FREODICA
ELEC COMPLETE 04/27/2018 04/30/2018
Note: Released By: DREWIS
BLD COMPLETE 04/27/2018 05/01/2018
Note: Released By: JHINDMAN
UD1 HOLD 04/27/2018 05/04/2018
Note: Held By: LFITZGERALD PEP Panels not shown on correct side of building on electrical plans PEP Panel is not shown on the same side as the tank in the electrical plan as the utility marked site plans. Submit a new electrical plan showing PEP Panel on the same side of the building as indicated in the Utility marked site plan
SWALE COMPLETE 04/16/2018 04/25/2018
Note: Released By: TBAKER
BLD HOLD 04/11/2018 04/13/2018
Note: Held By: JHINDMAN Identify the locations of the anchors for the truss to wall connections. 6th ed. FBC R 107.3.5.J. Hindman 986-3784.
ELEC HOLD 04/11/2018 04/13/2018
Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2014 NEC art.220. 2. Provide receptacles at bedrooms 2 and 3 on the walls nder the smoke detector. 6th ed. FBC R E3901.2.2. J. Hindman 986-3784.
ENGIN1 COMPLETE 04/11/2018 04/16/2018
Note: Released By: TBAKER
MECH HOLD 04/11/2018 04/13/2018
Note: Held By: FREODICA 1. Provide energy calculations for each separate unit, One (1) for unit A and one (1) for unit B This applies to all duplex units previously reviewed for the following address per FBCEC 6th ed. C103.2. a. 50 Raintree Place b. 6 Zorlou Court c. 52 Raintree Place 2. Provide signature of builder on Energy performance level (EPL) display card per FBCEC 6th ed. R401.3. F. Reodica -386-986-4734.
PLUM HOLD 04/11/2018 04/13/2018
Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
SW1 COMPLETE 04/11/2018 04/12/2018
Note: Released By: JHINDMAN
UD1 HOLD 04/11/2018 04/16/2018
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 04/11/2018 04/12/2018
Note: Held By: TDOAK 1. Foundation plantings must wrap corners. 2. Landscape plan must depict sod type and irrigation if required. 3. Site plan must depict side setbacks of proposed duplex. They are written on landscape plan but must be on the site plan as well.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/11/2019
REINSPECTION FEE ¤40.00 05/22/2019
REINSPECTION FEE ¤40.00 05/22/2019
REINSPECTION FEE ¤40.00 05/22/2019
REVISION ¤40.00 05/22/2019
SITE PLAN 20 ¤20.00 05/30/2018
SURCHARGE FS 533.721 ¤18.37 05/30/2018
SURCHARGE - FS 468.631 ¤27.56 05/30/2018
STORM WATER PERMIT FEES ¤80.00 05/30/2018
TRANSPORTATION IMPACT FEE/MULT ¤1,266.00 05/30/2018
TRANSPORTATION IMPACT FEE/MULT ¤1,266.00 05/30/2018
3% TRANS IMPACT FEE CREDIT (¤75.96) 05/30/2018
ADMIN FEE ¤20.00 05/30/2018
ELECTRIC FEE ¤291.00 05/30/2018
3% FIRE IMPACT FEE CREDIT (¤13.13) 05/30/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 05/30/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 05/30/2018
IMPACT FEE PARKS ¤849.24 05/30/2018
IMPACT FEE PARKS ¤849.24 05/30/2018
IMPACT FEE SCHOOL ¤3,600.00 05/30/2018
IMPACT FEE SCHOOL ¤3,600.00 05/30/2018
MECHANICAL FEE ¤291.00 05/30/2018
3% PARKS IMPACT FEE CREDIT (¤50.95) 05/30/2018
PLAN CHECK FEE ¤154.00 05/30/2018
PLUMBING FEE ¤291.00 05/30/2018
NEW RESIDENTIAL INSPECTIONS ¤770.00 05/30/2018
Fees Total Due: ¤0.00 Total Paid: ¤13,890.95