Permit #2018040654
Permit Details
Status: COED
| Parcel Id: 20-12-31-2950-00000-0040 |
| CONDITIONED SPACE: 2742 sqft |
| GARAGE: 549 sqft |
| OPENED PORCH (WITH ROOF) : 426 sqft |
| OPENED PORCH (WITH ROOF) : 123 sqft |
| Total Square Footage: 3840 sqft |
| Block: 00000 |
| Subdivision: 2133 - GRAND LANDINGS - PHASE 1 |
| Job Phone: (386)445-9393 |
| Location Address: 306 GRAND LANDINGS PKWY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/24/2018 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: FLAGLER COUNTY-PALM COAST HOMEBUILDERS ASSOC INC |
|
Address 4863 PALM COAST PKWY NW #1 PALM COAST, FL 32137 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
ANTONIO JR AMARAL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/25/2020 | FINAL APPROVED | TSTAUFFACHER |
| U-CROSS CONNECTION | 11/25/2020 | APPROVED - AS NOTED | JHARDING |
| Note: Approved. No cross connections | |||
| ROW - DRAINAGE | 11/25/2020 | APPROVED - AS NOTED | GBERTOLA |
| Note: NO DRANAINAGE ISSUE | |||
| ROW - STORMWATER FINAL | 11/25/2020 | APPROVED | GBERTOLA |
| U -UTILITY RESIDENTIAL FINAL | 11/25/2020 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 08/07/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: REMOVE FORM BOARDS AT APRON BACK OF CURB AND REPAIR 3 PAVERS THAT SUNK DOWN AT THE BACK SIDE OF DRIVEWAY TOWARDS POND | |||
| ELECTRIC - EARLY POWER | 02/14/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:10 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/02/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: DISTURBED BARE AREAS ON VACANT LOT TO THE LEFT NEED TO BE SEEDED AND STRAWED AND DIRT ON VACANT NEED TO BE REMOVED. SOD THE END OF THE SIDEWALK ON THE LEFT SIDE TO PREVENT EROSION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/02/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: DISTURBED BARE AREAS ON VACANT LOT TO THE LEFT NEED TO BE SEEDED AND STRAWED AND DIRT ON VACANT NEED TO BE REMOVED. SOD THE END OF THE SIDEWALK ON THE LEFT SIDE TO PREVENT EROSION | |||
| ROW- PRE-APRON (PRE-POUR) | 10/30/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 10/23/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: FOOTER IS NOT REQUIRED FOR GARAGE DOOR WALK AND EXTEND RIGHT SIDE FOOTER UP TO THE GARAGE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/23/2019 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON AND SIDEWALK POUR, PAVER UPPER DRIVEWAY | |||
| U - SEWER TIE IN | 06/05/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS DONE ON 6/4/19 | |||
| GRAVITY SEWER TEST | 06/05/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS DONE ON 6/4/19 | |||
| LATH/BRICK/ WATER BARRIER | 04/17/2019 | APPROVED | DROCKWELL |
| INSULATION | 04/05/2019 | APPROVED | DROCKWELL |
| ALL ROUGH | 03/15/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/14/2019 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 01/31/2019 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 08/30/2018 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 06/25/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 06/05/2018 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/25/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/22/2018 | 06/25/2018 |
| Note: Released By: DREWIS foundation s | |||
| BLD | COMPLETE | 04/13/2018 | 04/17/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 04/13/2018 | 04/17/2018 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 04/13/2018 | 04/18/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 04/13/2018 | 04/16/2018 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/13/2018 | 04/16/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 04/13/2018 | 04/17/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 04/13/2018 | 04/17/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 04/13/2018 | 04/13/2018 |
| Note: Released By: AMOBLEY | |||
| URB | COMPLETE | 04/13/2018 | 04/18/2018 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 04/24/2018 |
| ELECTRIC FEE | ¤269.40 | 04/24/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 04/24/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 04/24/2018 |
| IMPACT FEE PARKS | ¤849.24 | 04/24/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/24/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 04/24/2018 |
| MECHANICAL FEE | ¤269.40 | 04/24/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/24/2018 |
| PLAN CHECK FEE | ¤139.60 | 04/24/2018 |
| PLUMBING FEE | ¤269.40 | 04/24/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤698.00 | 04/24/2018 |
| SITE PLAN 20 | ¤20.00 | 04/24/2018 |
| SURCHARGE FS 533.721 | ¤16.86 | 04/24/2018 |
| SURCHARGE - FS 468.631 | ¤25.29 | 04/24/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/24/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 04/24/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,474.87 |