I want to search for...
Permit #2018041195
Permit Details
Status: COED
| Parcel Id: 07-11-31-7064-00240-0060 |
| CONDITIONED SPACE: 1500 sqft |
| GARAGE: 380 sqft |
| OPENED PORCH (WITH ROOF) : 24 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 1936 sqft |
| Block: 00240 |
| Subdivision: 2178 - SECTION 64-LAGUNA FOREST |
| Job Phone: 386-248-0033 |
| Location Address: 1 LLOSEE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/04/2018 |
| NOC: RECORDED |
| Applicant name: JEFFREY T WISE |
| Owner: 3 S HOUSING LLC |
|
Address 725 S NOVA RD #243 ORMOND BEACH, FL 32174 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤170,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WISE BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
120 CARSWELL AVE HOLLY HILL, FL 32117 |
CGC055237 (Exp: 08/31/2026) | 386-248-0033 |
Sub Contractors
JAMES R DOOLEY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1550 GARDEN AVENUE HOLLY HILL, FL 32117 |
EC13005817 (Exp: 08/31/2026) | 386-672-4433 | 386-672-9793 |
NORMAN J VAN HORNE
| Status | Location Address | State License Number | Phone |
| CANCEL |
PO BOX 251228 HOLLY HILL, FL 32117 |
CFC032605 (Exp: 08/31/2022) | (386)258-0608 |
KEVIN HENRY BEHRENS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1200 SOUTH NOVA ROAD DAYTONA BEACH, FL 32114 |
CAC054733 (Exp: 08/31/2026) | (386)761-7751 | (386) 258-0058 |
JEFFREY T WISE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
120 CARSWELL AVE HOLLY HILL, FL 32117 |
CCC049377 (Exp: 08/31/2026) | 386-248-0033 | 386-248-0033 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 05/17/2019 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION THIS INSPECTION WAS APPROVED ON 3-37-19 SHOULD HAVE BEEN R.O.W. FINAL INSPECTION | |||
| ROW - FINAL INSPECTION | 04/03/2019 | Disapproved - NO FEE | KHOWELL |
| Note: SOD ALL BARE AREAS | |||
| PROJECT STATUS (OFFICE USE) | 04/01/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: MET WITH CONTRACTOR ON SITE TO LOOK AT LOT GRADING. CONTRACTOR TO MAKE REPAIRS IN SWALE AREA ON LEFT REAR REMOVE THE SOD THAT IS COVERING THE REAR FENCE | |||
| BLD - BUILDING FINAL | 03/29/2019 | FINAL APPROVED | DROCKWELL |
| BLD - BUILDING FINAL | 03/27/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: House numbers required/Grout toilets at base/Attic access cover must be rated for flame spread | |||
| U -UTILITY RESIDENTIAL FINAL | 03/27/2019 | FINAL APPROVED | AHALL |
| ROW - FINAL APRON (AFTER POUR) | 03/27/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: CONTRACTOR CAUSE TO GRIND DOWN THE DRIVEWAY AAPRON AT THE EDGE OF PAVEMENT WHICH SHOULD HAVE HAD A ASPHALT PATCH DONE | |||
| ROW - FINAL INSPECTION | 03/27/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THE SWALE AREA WAS NOT GRADED OR SODDED, THE REAR PROPERTY HAS SOD THAT IS HIGHER THEN THE BOTTOM OF THE FENCE WHICH IS NOT ALLOWED. THE REAR HAS HIGH AND LOW AREAS IN DRAINAGE WHICH WILL CAUSE WATER TO POND AND NOT DRAIN. THE RIGHT SIDE OF PROPERTY IS A LOT HIGHER AND IS PUSHING WATER ONTO THE NEIGHBORS LOT NEED MORE ELEVATIONS TO SHOW THAT IT WILL NOT NEGETIVELY IMPACT THE HOUSE | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/26/2019 | APPROVED | RLEE |
| ROW - FINAL APRON (AFTER POUR) | 02/21/2019 | Disapproved - NO FEE | CTROHA |
| Note: Required for this inspection: 1) Approved final survey 2) Sod in place 3) 1' x width of the driveway asphalt patch (tripping hazard) | |||
| LATH/BRICK/ WATER BARRIER | 02/14/2019 | APPROVED | DROCKWELL |
| ROW- PRE-APRON (PRE-POUR) | 02/12/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/11/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: 1. CULVERT PIPE NOT 8' FROM EDGE OF PAVEMENT 2. SWALE PLAN IS REQUIRED TO BE ONSITE WITH THE SITE PLAN IN DOC BOX FOR THIS INSPECTION 3. NOT FORMED TO THE CITY STANDARD DETAIL 4. ROAD FORM BOARD IS REQUIRED 5. SEE CITY STANDARD DETAIL FOR MITERED END SECTION FORM REQUIREMENTS, CONCRETE THICKNESS REQUIREMENTS, APRON WIDTH AND CULVERT PIPE BACKFILL | |||
| U - SEWER TIE IN | 02/07/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 02/07/2019 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 01/25/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 10:00 | |||
| ELECTRIC - EARLY POWER | 01/24/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: RISER CAN NOT BE TALLER THAN 3FT OR SHORTER THAN 18" NEC 230.24 ALSO NEED TO STRAP RISER NEC 230.28 NEED COMBO ARC FAULT GFCI BREAKERS ON ADDITIONAL CKTS BY FINAL NEC 210.12A ALSO NEED TO VERIFY ENTRY LIGHT IS APPROVED FOR OUTDOOR | |||
| INSULATION | 11/27/2018 | APPROVED | DROCKWELL |
| INSULATION | 11/26/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Provide baffels along sizzor trusses above batt insulation to keep blown insulation in place from falling to the lower ceiling/ Pull down stair cover ingarage must be rated for fire/flame spread will check at final | |||
| ALL ROUGH | 11/19/2018 | APPROVED | RLEE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/13/2018 | APPROVED - AS NOTED | DROCKWELL |
| Note: Strap ridge to truss blocking below/Strap rafter to truss beloe | |||
| ROOF VALLEY & METAL | 11/13/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING | 10/19/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/18/2018 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: Call in roof sheathing inspection.OK to dry-in | |||
| TIE BEAM / LINTEL | 10/01/2018 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 09/19/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 09/05/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 09/04/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: UFER ground must be used if available/Complete formwork | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/30/2018 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 08/28/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TEMP POWER 3:40 |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/26/2019 | 03/26/2019 |
| Note: Released By: RLEE Final Survey | |||
| SW1 | COMPLETE | 09/18/2018 | 09/19/2018 |
| Note: Released By: DREWIS | |||
| ELEC | COMPLETE | 05/22/2018 | 05/23/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 05/22/2018 | 05/23/2018 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 05/22/2018 | 05/23/2018 |
| Note: Released By: FREODICA | |||
| ZON | COMPLETE | 05/14/2018 | 05/14/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | HOLD | 05/14/2018 | 05/15/2018 |
| Note: Held By: DREWIS Receptacle behind the master bedroom door swing, 210.52. Daniel Rewis 986-4736 | |||
| SW1 | HOLD | 05/14/2018 | 05/15/2018 |
| Note: Held By: DREWIS Provide the proposed elevations 10' away from the foundation wall. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 05/14/2018 | 05/18/2018 |
| Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| PLUM | COMPLETE | 05/14/2018 | 05/16/2018 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 05/14/2018 | 05/16/2018 |
| Note: Held By: FREODICA Submitted hvac plan shall have balanced return air from all bedrooms per FBCR 6th ed. M1602.3. F.Reodica -386-986-4734. | |||
| SWALE | COMPLETE | 04/27/2018 | 05/17/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 04/25/2018 | 05/01/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 04/25/2018 | 04/27/2018 |
| Note: Held By: DREWIS Provide: Conductor sizes for the riser diagram. Receptacle behind the master bedroom door swing, 210.52. Disconnecting means for the AHU/compressor and water heater, 440.14 & 422.31B Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 04/25/2018 | 04/27/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 04/25/2018 | 05/02/2018 |
| Note: Held By: FREODICA 1. Provide hvac plan either prepared by design professional or an hvac contractor with signature and license number per FBC 6th ed. 107.1. 2. Directional orientation of the building as shown on energy calculation shall match with site plan to comply with FBCEC 6th ed. R403.7.1. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 04/25/2018 | 05/02/2018 |
| Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| SW1 | HOLD | 04/25/2018 | 04/27/2018 |
| Note: Held By: DREWIS Proposed elevations too blurred for review of storm water flow, provide a darker outlined site plan. Provide a site plan depicting proposed elevations 10' away from the foundation wall of the residence with a 5% slope,FBC 6th ed. R401.3 Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 04/25/2018 | 05/02/2018 |
| Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 04/25/2018 | 04/25/2018 |
| Note: Held By: TDOAK 1. Landscape plan must depict the following: a. Sizes and types of trees & foundation/screening plantings b. The correct minimum number of required foundation plantings in the front of the home. c. Mechanical equipment must be screened from neighboring property as well as the public right-of-way. 2. Covered entry must be included in area calculations. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/27/2019 |
| REINSPECTION FEE | ¤40.00 | 03/27/2019 |
| REINSPECTION FEE | ¤40.00 | 02/11/2019 |
| REINSPECTION FEE | ¤40.00 | 01/24/2019 |
| REINSPECTION FEE | ¤40.00 | 01/24/2019 |
| REINSPECTION FEE | ¤40.00 | 09/04/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤368.00 | 06/04/2018 |
| SITE PLAN 20 | ¤20.00 | 06/04/2018 |
| SURCHARGE FS 533.721 | ¤9.93 | 06/04/2018 |
| SURCHARGE - FS 468.631 | ¤14.89 | 06/04/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/04/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 06/04/2018 |
| ADMIN FEE | ¤20.00 | 06/04/2018 |
| ELECTRIC FEE | ¤170.40 | 06/04/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 06/04/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 06/04/2018 |
| IMPACT FEE PARKS | ¤849.24 | 06/04/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/04/2018 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 06/04/2018 |
| MECHANICAL FEE | ¤170.40 | 06/04/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/04/2018 |
| PLAN CHECK FEE | ¤73.60 | 06/04/2018 |
| PLUMBING FEE | ¤170.40 | 06/04/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,556.65 |