I want to search for...

Permit #2018041195

Permit Details

Status: COED

Parcel Id: 07-11-31-7064-00240-0060
CONDITIONED SPACE: 1500 sqft
GARAGE: 380 sqft
OPENED PORCH (WITH ROOF) : 24 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 1936 sqft
Block: 00240
Subdivision: 2178 - SECTION 64-LAGUNA FOREST
Job Phone: 386-248-0033
Location Address: 1 LLOSEE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/04/2018
NOC: RECORDED
Applicant name: JEFFREY T WISE
Owner: 3 S HOUSING LLC

Address

725 S NOVA RD #243

ORMOND BEACH, FL 32174

Lot: 0060
Contracted Stated Job Value: ¤170,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WISE BUILDERS LLC
Status Location Address State License Number Phone
ACTIVE

120 CARSWELL AVE

HOLLY HILL, FL 32117

CGC055237 (Exp: 08/31/2026) 386-248-0033

Sub Contractors

JAMES R DOOLEY
Status Location Address State License Number Phone Fax
ACTIVE

1550 GARDEN AVENUE

HOLLY HILL, FL 32117

EC13005817 (Exp: 08/31/2026) 386-672-4433 386-672-9793
NORMAN J VAN HORNE
Status Location Address State License Number Phone
CANCEL

PO BOX 251228

HOLLY HILL, FL 32117

CFC032605 (Exp: 08/31/2022) (386)258-0608
KEVIN HENRY BEHRENS
Status Location Address State License Number Phone Fax
INACTIVE

1200 SOUTH NOVA ROAD

DAYTONA BEACH, FL 32114

CAC054733 (Exp: 08/31/2026) (386)761-7751 (386) 258-0058
JEFFREY T WISE
Status Location Address State License Number Phone Fax
ACTIVE

120 CARSWELL AVE

HOLLY HILL, FL 32117

CCC049377 (Exp: 08/31/2026) 386-248-0033 386-248-0033

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 05/17/2019 FINAL APPROVED KHOWELL
Note: THIS IS A REINSPECTION THIS INSPECTION WAS APPROVED ON 3-37-19 SHOULD HAVE BEEN R.O.W. FINAL INSPECTION
ROW - FINAL INSPECTION 04/03/2019 Disapproved - NO FEE KHOWELL
Note: SOD ALL BARE AREAS
PROJECT STATUS (OFFICE USE) 04/01/2019 APPROVED - AS NOTED KHOWELL
Note: MET WITH CONTRACTOR ON SITE TO LOOK AT LOT GRADING. CONTRACTOR TO MAKE REPAIRS IN SWALE AREA ON LEFT REAR REMOVE THE SOD THAT IS COVERING THE REAR FENCE
BLD - BUILDING FINAL 03/29/2019 FINAL APPROVED DROCKWELL
BLD - BUILDING FINAL 03/27/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: House numbers required/Grout toilets at base/Attic access cover must be rated for flame spread
U -UTILITY RESIDENTIAL FINAL 03/27/2019 FINAL APPROVED AHALL
ROW - FINAL APRON (AFTER POUR) 03/27/2019 APPROVED - AS NOTED KHOWELL
Note: CONTRACTOR CAUSE TO GRIND DOWN THE DRIVEWAY AAPRON AT THE EDGE OF PAVEMENT WHICH SHOULD HAVE HAD A ASPHALT PATCH DONE
ROW - FINAL INSPECTION 03/27/2019 Disapproved -FEE REQUIRED KHOWELL
Note: THE SWALE AREA WAS NOT GRADED OR SODDED, THE REAR PROPERTY HAS SOD THAT IS HIGHER THEN THE BOTTOM OF THE FENCE WHICH IS NOT ALLOWED. THE REAR HAS HIGH AND LOW AREAS IN DRAINAGE WHICH WILL CAUSE WATER TO POND AND NOT DRAIN. THE RIGHT SIDE OF PROPERTY IS A LOT HIGHER AND IS PUSHING WATER ONTO THE NEIGHBORS LOT NEED MORE ELEVATIONS TO SHOW THAT IT WILL NOT NEGETIVELY IMPACT THE HOUSE
FINAL SURVEY (OFFICE USE ONLY) 03/26/2019 APPROVED RLEE
ROW - FINAL APRON (AFTER POUR) 02/21/2019 Disapproved - NO FEE CTROHA
Note: Required for this inspection: 1) Approved final survey 2) Sod in place 3) 1' x width of the driveway asphalt patch (tripping hazard)
LATH/BRICK/ WATER BARRIER 02/14/2019 APPROVED DROCKWELL
ROW- PRE-APRON (PRE-POUR) 02/12/2019 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 02/11/2019 Disapproved -FEE REQUIRED KHOWELL
Note: 1. CULVERT PIPE NOT 8' FROM EDGE OF PAVEMENT 2. SWALE PLAN IS REQUIRED TO BE ONSITE WITH THE SITE PLAN IN DOC BOX FOR THIS INSPECTION 3. NOT FORMED TO THE CITY STANDARD DETAIL 4. ROAD FORM BOARD IS REQUIRED 5. SEE CITY STANDARD DETAIL FOR MITERED END SECTION FORM REQUIREMENTS, CONCRETE THICKNESS REQUIREMENTS, APRON WIDTH AND CULVERT PIPE BACKFILL
U - SEWER TIE IN 02/07/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 02/07/2019 APPROVED JGIBSON
ELECTRIC - EARLY POWER 01/25/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 10:00
ELECTRIC - EARLY POWER 01/24/2019 Disapproved -FEE REQUIRED RMARTIN
Note: RISER CAN NOT BE TALLER THAN 3FT OR SHORTER THAN 18" NEC 230.24 ALSO NEED TO STRAP RISER NEC 230.28 NEED COMBO ARC FAULT GFCI BREAKERS ON ADDITIONAL CKTS BY FINAL NEC 210.12A ALSO NEED TO VERIFY ENTRY LIGHT IS APPROVED FOR OUTDOOR
INSULATION 11/27/2018 APPROVED DROCKWELL
INSULATION 11/26/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: Provide baffels along sizzor trusses above batt insulation to keep blown insulation in place from falling to the lower ceiling/ Pull down stair cover ingarage must be rated for fire/flame spread will check at final
ALL ROUGH 11/19/2018 APPROVED RLEE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/13/2018 APPROVED - AS NOTED DROCKWELL
Note: Strap ridge to truss blocking below/Strap rafter to truss beloe
ROOF VALLEY & METAL 11/13/2018 APPROVED DROCKWELL
ROOF SHEATHING 10/19/2018 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2018 CANCELLED BY APPLICANT DROCKWELL
Note: Call in roof sheathing inspection.OK to dry-in
TIE BEAM / LINTEL 10/01/2018 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 09/19/2018 APPROVED DREWIS
MONOLITHIC SLAB 09/05/2018 APPROVED CMINI
MONOLITHIC SLAB 09/04/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: UFER ground must be used if available/Complete formwork
PLUMBING 1ST ROUGH UNDERGROUND 08/30/2018 APPROVED JGIBSON
ELECTRIC TEMP POLE 08/28/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TEMP POWER 3:40

Review History

Department Status Date In Date Out
SW1 COMPLETE 03/26/2019 03/26/2019
Note: Released By: RLEE Final Survey
SW1 COMPLETE 09/18/2018 09/19/2018
Note: Released By: DREWIS
ELEC COMPLETE 05/22/2018 05/23/2018
Note: Released By: DREWIS
SW1 COMPLETE 05/22/2018 05/23/2018
Note: Released By: DREWIS
MECH COMPLETE 05/22/2018 05/23/2018
Note: Released By: FREODICA
ZON COMPLETE 05/14/2018 05/14/2018
Note: Released By: AMOBLEY
ELEC HOLD 05/14/2018 05/15/2018
Note: Held By: DREWIS Receptacle behind the master bedroom door swing, 210.52. Daniel Rewis 986-4736
SW1 HOLD 05/14/2018 05/15/2018
Note: Held By: DREWIS Provide the proposed elevations 10' away from the foundation wall. Daniel Rewis 986-4736
UD1 COMPLETE 05/14/2018 05/18/2018
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
PLUM COMPLETE 05/14/2018 05/16/2018
Note: Released By: FREODICA
MECH HOLD 05/14/2018 05/16/2018
Note: Held By: FREODICA Submitted hvac plan shall have balanced return air from all bedrooms per FBCR 6th ed. M1602.3. F.Reodica -386-986-4734.
SWALE COMPLETE 04/27/2018 05/17/2018
Note: Released By: TBAKER
BLD COMPLETE 04/25/2018 05/01/2018
Note: Released By: JHINDMAN
ELEC HOLD 04/25/2018 04/27/2018
Note: Held By: DREWIS Provide: Conductor sizes for the riser diagram. Receptacle behind the master bedroom door swing, 210.52. Disconnecting means for the AHU/compressor and water heater, 440.14 & 422.31B Daniel Rewis 986-4736
ENGIN1 COMPLETE 04/25/2018 04/27/2018
Note: Released By: TBAKER
MECH HOLD 04/25/2018 05/02/2018
Note: Held By: FREODICA 1. Provide hvac plan either prepared by design professional or an hvac contractor with signature and license number per FBC 6th ed. 107.1. 2. Directional orientation of the building as shown on energy calculation shall match with site plan to comply with FBCEC 6th ed. R403.7.1. F.Reodica -386-986-4734.
PLUM HOLD 04/25/2018 05/02/2018
Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
SW1 HOLD 04/25/2018 04/27/2018
Note: Held By: DREWIS Proposed elevations too blurred for review of storm water flow, provide a darker outlined site plan. Provide a site plan depicting proposed elevations 10' away from the foundation wall of the residence with a 5% slope,FBC 6th ed. R401.3 Daniel Rewis 986-4736
UD1 HOLD 04/25/2018 05/02/2018
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 04/25/2018 04/25/2018
Note: Held By: TDOAK 1. Landscape plan must depict the following: a. Sizes and types of trees & foundation/screening plantings b. The correct minimum number of required foundation plantings in the front of the home. c. Mechanical equipment must be screened from neighboring property as well as the public right-of-way. 2. Covered entry must be included in area calculations.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/27/2019
REINSPECTION FEE ¤40.00 03/27/2019
REINSPECTION FEE ¤40.00 02/11/2019
REINSPECTION FEE ¤40.00 01/24/2019
REINSPECTION FEE ¤40.00 01/24/2019
REINSPECTION FEE ¤40.00 09/04/2018
NEW RESIDENTIAL INSPECTIONS ¤368.00 06/04/2018
SITE PLAN 20 ¤20.00 06/04/2018
SURCHARGE FS 533.721 ¤9.93 06/04/2018
SURCHARGE - FS 468.631 ¤14.89 06/04/2018
STORM WATER PERMIT FEES ¤80.00 06/04/2018
3% TRANS IMPACT FEE CREDIT (¤48.96) 06/04/2018
ADMIN FEE ¤20.00 06/04/2018
ELECTRIC FEE ¤170.40 06/04/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 06/04/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 06/04/2018
IMPACT FEE PARKS ¤849.24 06/04/2018
IMPACT FEE SCHOOL ¤3,600.00 06/04/2018
IMPACT FEE TRANSPORTATION ¤1,632.00 06/04/2018
MECHANICAL FEE ¤170.40 06/04/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/04/2018
PLAN CHECK FEE ¤73.60 06/04/2018
PLUMBING FEE ¤170.40 06/04/2018
Fees Total Due: ¤0.00 Total Paid: ¤7,556.65