Permit #2018041211

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7023-00090-0060
CONDITIONED SPACE: 1870 sqft
GARAGE: 483 sqft
OPENED PORCH (WITH ROOF) : 231 sqft
OPENED PORCH (WITH ROOF) : 118 sqft
Total Square Footage: 2702 sqft
Block: 00090
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 386-447-2202
Location Address: 18 WHITCOCK LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/10/2018
NOC: RECORDED
Applicant name: MICHAEL J LILLY
Owner: AYM HOLDINGS LLC

Address

24 CLARENDON CT S

PALM COAST, FL 32137

Lot: 0060
Contracted Stated Job Value: ¤135,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SERVPRO OF FLAGLER COUNTY
Status Location Address State License Number Phone Fax
INACTIVE

2205 DOBBS ROAD

BUNNELL, FL 32110

CGC1514660 (Exp: 08/31/2024) 904-429-4457 386-206-2188

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
BRIAN ALLEN MOLL
Status Location Address Mailing Address State License Number Phone
ACTIVE

1 ENTERPRISE DRIVE

BUNNELL, FL 32110

SUITE 8

BUNNELL, FL 32110

CAC1815106 (Exp: 08/31/2026) 386-447-3782
MICHAEL ANTONIO QUINONES
Status Location Address State License Number Phone
CANCEL

2948 1ST ST

ST AUGUSTINE, FL 32084

CFC1429017 (Exp: 08/31/2022) 904-735-5097
JAMES FRANCIS SUPLEE
Status Location Address State License Number Phone Fax
ACTIVE

1955 ST RF 16

ST AUGUSTINE, FL 32084

CCC1329903 (Exp: 08/31/2026) 904-230-5548 904-230-5547

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/26/2019 FINAL APPROVED FWILLIS
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 11/25/2019 CANCELLED BY APPLICANT WMILLER
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 11/22/2019 CANCELLED BY APPLICANT JCOLASANTI
U -UTILITY RESIDENTIAL FINAL 11/22/2019 APPROVED - AS NOTED MBACON
Note: THIS IS A REINSPECTION Sewer cleanout needs to be flush with sod grade
GRAVITY SEWER TEST 11/21/2019 APPROVED - AS NOTED PBUCKLEY
Note: supporting letter on file
ROW - STORMWATER FINAL 11/13/2019 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 11/01/2019 Disapproved - NO FEE LFITZGERALD
Note: pep tank sewer clean out cover not observed, please make visible with it being a flush mount cap that is flush with sod grades.
ROW - DRAINAGE 11/01/2019 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 11/01/2019 Disapproved - NO FEE MMAJEWSKI
Note: THERE IS A 20 FOOT LONG AREA IN THE SWALE WHERE THE SOD HAS BEEN TORE UP. THIS WILL NEED TO BE REPLACED.
GRAVITY SEWER TEST 11/01/2019 Disapproved - NO FEE JCOLASANTI
Note: THIS IS A REINSPECTION need to obtain ok from building official to clear inspection
MONOLITHIC SLAB 11/01/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION approved at previous inspection
ROW - FINAL APRON (AFTER POUR) 10/30/2019 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 10/18/2019 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. ROAD REPAIR MUST BE HOT PATCH. NOT COLD PATCH. ALSO MUST BE REPAIRED SO AS NOT TO CREATE A TRIPPING HAZARD.
ROW - FINAL APRON (AFTER POUR) 10/16/2019 Disapproved -FEE REQUIRED MMAJEWSKI
Note: THIS IS A REINSPECTION. PAVEMENT IN FRONT OF DRIVEWAY NOT REPAIRED
ROW FIELD SURVEY /GRADING CERTIFICATION 10/15/2019 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 10/15/2019 APPROVED MMAJEWSKI
ROW - FINAL APRON (AFTER POUR) 09/11/2019 Disapproved -FEE REQUIRED KHOWELL
Note: THIS IS A REINSPECTION CONCRETE APRON IS NOT ALLOWED TO BE PORED INTO THE ROADWAY. THIS INSPECTION CAN NOT BE DONE UNTIL THE FINAL SURVEY HGAS BEEN APPROVED TO VERIFY INVERT ELEVATION OF THE CULVERT PIPE IS CORRECT. THE MITERED ENDS IS REQUIRED TO HAVE 2" OF CONCRETE ABOVE THE OPENING OF ON THE CULVERT MITERED END SECTIONS. SAW CUT IS REQUIRED TO BE OVER THE CENTER OF THE CULVERT PIPE PER DETAIL.
ROW- PRE-APRON (PRE-POUR) 09/10/2019 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. APRON SLOPE TOO STEEP. SEE CULVERT DETAIL. NEEDS MORE COMPACTION IN THE APRON. REMOVE ORGANIC GRASS GROWING IN THE POUR AREA. DISREGARD THIS INSPECTION RESULT. INSPECTOR ENTERED INFO ON THE WRONG ADDRESS.
ROW- PRE-APRON (PRE-POUR) 09/10/2019 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. ON SITE WITH SUPER TO ENSURE A FACE BOARD WAS USED ALONG THE ROAD EDGE. AFTER INSTALLED, READY TO POUR. NOTE: THE ORIGINAL INSPECTION FOR THIS CULVERT WAS MISTAKENLY FAILED BY THE INSPECTOR AT A DIFFERENT ADDRESS AND PRE POUR THAT FAILED. THIS WAS RE-SCHEDULED THE SAME DAY BY THE INSPECTOR. ANY QUESTIONS CALL ROBERT 386-793-3980.
ROW- PRE-APRON (PRE-POUR) 08/28/2019 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. NO SWALE PLAN ON SITE. MITERED ENDS NOT FORMED CORRECTLY. SEE CITY WEB SITE SEARCH "DRIVEWAY CULVERT DETAIL" IT IS A PDF FOR HOW MITERED ENDS ARE TO BE FORMED. PHOTO'S ATTACHED.
ROW- PRE-APRON (PRE-POUR) 08/14/2019 Disapproved -FEE REQUIRED KHOWELL
Note: SWALE SHEET NOT IN DOC BOX, PIN THE APRROVED SITE PLAN AND SWALE SHEET TOGETHER DID NOT SHOT CULVERT ELEVATION. REMOVE THE GRASS, REPAIR WASHOUTS AND COMPACT THE PAD AREA. 4" MINIMUM THICK CONCRETE REQUIRED PAST THE R.O.W., 5" MINIMUM THICK CONCRETE REQUIRED IN THE R.O.W. THE MITERED ENDS ARE NOT FORMED PER THE CITY STANDARD DETAIL. A ROAD FORM BOARD IS REQUIRED SO THE INSIDE OF THE FORM LINES UP WITH THE EXISTING EDGE OF PAVEMENT. THE CULVERT FOOTERS ARE REQUIRED TO BE MINIMUM OF 6" DEEP, SEE CITY STANDARD DRIVEWAY DETAIL
MONOLITHIC SLAB 08/14/2019 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION Driveway Apron not 6" in areas as required by code.
ELECTRIC - EARLY POWER 07/09/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION not conected in meter panel
U - SEWER TIE IN 06/03/2019 APPROVED - AS NOTED JGIBSON
Note: THIS IS A REINSPECTION STILL NEED TEST ON GRAVITY SEWER AND GRAVITY SEWER INSPECTION
U - SEWER TIE IN 05/22/2019 Disapproved - NO FEE JGIBSON
Note: per contractor NEED C/O AT TAPE LOCATION
GRAVITY SEWER TEST 05/22/2019 Disapproved -FEE REQUIRED JGIBSON
Note: P-312.6 GRAVITY SEWER TEST, NO 5' HEAD TEST
INSULATION 03/18/2019 APPROVED JCOLASANTI
ALL ROUGH 03/15/2019 APPROVED - AS NOTED WMILLER
Note: NEED TO SEE THE FOLLOWING BY INSULATION INSPECTION (WAS REQUEST ALREADY AT ALL-ROUGH INSPEDCTION PRIOR) provide 5ft test pressure on waste lines. 5th ed. FBC R P2503.5.1. 2 (SECOND REQUEST)
INSULATION 03/13/2019 Disapproved - NO FEE JCOLASANTI
Note: need to have approved all rough inspection before insullation inspection
LATH/BRICK/ WATER BARRIER 03/08/2019 APPROVED JCOLASANTI
ALL ROUGH 03/05/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need to seal tub trench..need to install plastic, treat and seal slab at front guest bedroom... provide 5ft test pressure on waste lines. 5th ed. FBC R P2503.5.1. 2
ROW - FINAL INSPECTION 01/04/2019 CANCELLED BY APPLICANT STHOMAS
ALL ROUGH 01/03/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need exterior doors and windows at time of inspection
ROOF VALLEY & METAL 12/27/2018 APPROVED JCOLASANTI
U - SEWER TIE IN 12/04/2018 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/03/2018 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2018 Disapproved -FEE REQUIRED RLEE
Note: need revision to show truss connection to block, detail shows twist straps for repair of missing straps 802 Also need full set of approved plans in organized fashion with truss engineering package on site for next inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/09/2018 Disapproved - NO FEE JCOLASANTI
Note: need revision to show truss connection to block, detail shows twist straps for repair of missing straps 802
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/06/2018 Disapproved - NO FEE JCOLASANTI
Note: roof sheathing needs to be complete for this inspection
ROOF VALLEY & METAL 11/05/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: not ready for roof valley inspection
TIE BEAM / LINTEL 10/09/2018 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 10/08/2018 APPROVED DREWIS
MONOLITHIC SLAB 09/25/2018 APPROVED JCOLASANTI
Note: this inspection already complete, need to call tie beam/lintel
MONOLITHIC SLAB - GREEN 09/11/2018 APPROVED JCOLASANTI
MONOLITHIC SLAB 09/10/2018 Disapproved - NO FEE JCOLASANTI
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 107.3,1. (need documents onsite at time of inspection)
ELECTRIC TEMP POLE 08/23/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TEMP POWER 10:00
ELECTRIC - EARLY POWER 08/22/2018 Disapproved - NO FEE RMARTIN
Note: WRONG INSPECTION IS CALLED IN, NEEDS TO BE TEMP POLE INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 08/16/2018 APPROVED JCOLASANTI
ROW - DRAINAGE 08/15/2018 Disapproved - NO FEE KHOWELL
Note: EROSION FROM YOUR SITE IS RUNNING INTO THE SWALE AT 20 WHITCOCK LANE THAT NEEDS TO BE REMOVED AND SILT FENCE INSTALLED ALSO REMOVE DIRT FROM THE SWALE THAT IS BLOCKING THE FLOW OF WATER. THIS WILL BE REINSPECTED FOR CORRECTION ON TUESDAY AUGUST 21, 2018. IF IT HAS NOT BEEN CORRECTED THERE BE INSPECTION FEES FOR THIS UNTIL IT IS CORRECTED
PLUMBING 1ST ROUGH UNDERGROUND 08/14/2018 Disapproved -FEE REQUIRED JGIBSON
Note: P-2503.2 CONCEALMENT-UNCOVER ALL FITTINGS AND PIPE FOR INSPECTION,P-2503.5.1 ROUGH PLUMBING TEST HEAD PRESSURE NOT HOLDING, NEED TO REMOVEALL TREE STUMPS FROM SLAB P-2604.1
PLUMBING 1ST ROUGH UNDERGROUND 08/13/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 107.3,1. (need documents onsite at time of inspection)....NOC need to be posted on site....need plumbing riser on site at time of inspection

Review History

Department Status Date In Date Out
BLD COMPLETE 01/04/2019 01/10/2019
Note: Released By: JHINDMAN
BLD COMPLETE 11/14/2018 11/21/2018
Note: Released By: RLEE
SW1 COMPLETE 10/03/2018 10/08/2018
Note: Released By: DREWIS Foundation survey
MECH COMPLETE 06/29/2018 06/29/2018
Note: Released By: FREODICA
MECH HOLD 06/21/2018 06/28/2018
Note: Held By: FREODICA Review comments on submitted correction for energy caculations dated 6-21-18 : 1. Insulation R-value for exterior block wall, 8 inch thick (item 9c) shows manually input data of R=4.4 on EPL display card but anotther manually input data for the same wall shows R=0 on page 4 of energy calculation. These insulation R-value data shall be computer-entered into the energy calculation software and not manually- done to be included in the calculations per FBCEC 6th ed. R405.4. 2. Revised equipment sizing calculations shall be included in the submittal package due to changes per FBCEC 6th ed. R403. 7.1. F. Reodica -386-986-4734.
PLUM COMPLETE 06/14/2018 06/15/2018
Note: Released By: FREODICA
MECH HOLD 06/14/2018 06/15/2018
Note: Held By: FREODICA Repeat comment: Repeat comment: Provide complete package of energy calculations, the number of bedrooms and R- value on block wall stucco (item 9c) are not indicated per FBCEC 6th ed. R405. F.Reodica -386-986-4734. Note: The insulation R-value on block wll stucco (item 9c) on energy calculation still shows zero (0) value.
UD1 COMPLETE 06/07/2018 06/13/2018
Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind
PLUM HOLD 06/07/2018 06/08/2018
Note: Held By: FREODICA Repeat comment: Provide complete pipe sizes and indicate the fixtures name for clarity per FBC 6th ed. 105.3.1. F.Reodica -386-986-4734.
MECH HOLD 06/07/2018 06/08/2018
Note: Held By: FREODICA Repeat comment: Provide complete package of energy calculations, the number of bedrooms and R- value on block wall stucco (item 9c) are not indicated per FBCEC 6th ed. R405. F.Reodica -386-986-4734.
ZON COMPLETE 06/07/2018 06/08/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 06/07/2018 06/11/2018
Note: Released By: DREWIS
ELEC HOLD 05/25/2018 05/29/2018
Note: Held By: DREWIS Update code references to the FBC 6ht ed and 2014 NEC. Provide an additional GFCI in the laundry area, 210.52F Daniel Rewis 986-4736
SW1 COMPLETE 05/25/2018 05/31/2018
Note: Released By: DREWIS
BLD COMPLETE 05/25/2018 05/31/2018
Note: Released By: JHINDMAN
UD1 HOLD 05/25/2018 05/29/2018
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
MECH HOLD 05/25/2018 05/29/2018
Note: Held By: FREODICA Provide complete package of energy calculations, Energy Performace Level (EPL) display card and other mandatory requirements are missing, the number of bedrooms and R- value on block wall stucco (item 9c) are not indicated per FBCEC 6th ed. R405. F.Reodica -386-986-4734.
PLUM HOLD 05/25/2018 05/29/2018
Note: Held By: FREODICA Provide complete pipe sizes and indicate the fixtures name for clarity per FBC 6th ed. 105.3.1. F.Reodica -386-986-4734.
ZON HOLD 05/25/2018 05/29/2018
Note: Held By: TDOAK REPEAT COMMENTS: 1. Landscape plan must depict the following: a. There must be a minimum of 4 foundation plantings on the each side of home and 8 foundation plantings in the front. (THIS DOES NOT INCLUDE THE 7 GALLON PLANTS SCREENING THE A/C EQUIPMENT). b. Foundation plantings must wrap the corners of the home. c. What type of sod will be installed? If St Augustine, plans must note that an irrigation system will be included. d. Demonstrate which existing trees will be saved. Also note that saved trees must be barricaded to the dripline throughout the construction process.
ENGIN1 COMPLETE 05/25/2018 06/01/2018
Note: Released By: TBAKER
ENGIN1 COMPLETE 05/09/2018 05/10/2018
Note: Released By: TBAKER Held By: TBAKER SITE BENCHMARK NEEDS TO BE RESET DUE TO VANDALISM
SWALE COMPLETE 04/27/2018 06/01/2018
Note: Released By: TBAKER
BLD HOLD 04/25/2018 05/01/2018
Note: Held By: JHINDMAN 1. Provide signed and sealed plans 6th ed. FBC 107.1. J. Hindman 986-3784.
ELEC HOLD 04/25/2018 04/27/2018
Note: Held By: DREWIS Provide signature and license number of the electrical contractor on the plans or the signature and seal of an engineer, FBC 6th ed. 107.1. Provide a plan with clear notes, notes provided are too blurred for review. Provide a riser diagram. Provide an additional GFCI in the laundry area, 210.52F Provide receptacles for kitchen counters, bedroom and great area, 210.52. Daniel Rewis 986-4736
ENGIN1 COMPLETE 04/25/2018 04/27/2018
Note: Released By: TBAKER
MECH HOLD 04/25/2018 05/02/2018
Note: Held By: FREODICA 1. Provide energy calculations using peformance method per FBCEC 6th ed. R405. 2. Provide complete hvac plan either prepared by design professional or an hvac contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
PLUM HOLD 04/25/2018 05/02/2018
Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1 F.Reodica -386-986-4734.
SW1 HOLD 04/25/2018 04/27/2018
Note: Held By: DREWIS Leftside proposed elevation 28.4'-27.3' allow flow from the adjacent property, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736
UD1 HOLD 04/25/2018 05/02/2018
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 04/25/2018 04/26/2018
Note: Held By: TDOAK 1. Landscape plan must depict the following: a. That as per Land Development Code 11.02.03.D.2, the plan must demonstrate that the minimum NUMBER, TYPE AND SIZE of foundation plantings is being met. b. There must be a minimum of 4 foundation plantings on the each side of home and 8 foundation plantings in the front. c. Foundation plantings must wrap the corners of the home. d. A/C must be screened from the public right-of-way as well as neighboring property with 7 gallon plantings. e. Demonstrate which existing trees will be saved. Also note that saved trees must be barricaded to the dripline throughout the construction process. 2. Color Sheet must depict the garage door color name, manufacturer and its LRV. 3. Plans must show all exterior elevations, not just the right and left.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ELECTRIC FEE ¤205.20 07/10/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 07/10/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 07/10/2018
IMPACT FEE PARKS ¤849.24 07/10/2018
IMPACT FEE SCHOOL ¤3,600.00 07/10/2018
IMPACT FEE TRANSPORTATION ¤1,632.00 07/10/2018
MECHANICAL FEE ¤205.20 07/10/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/10/2018
PLAN CHECK FEE ¤96.80 07/10/2018
PLUMBING FEE ¤205.20 07/10/2018
ADMIN FEE ¤20.00 07/10/2018
NEW RESIDENTIAL INSPECTIONS ¤484.00 07/10/2018
SITE PLAN 20 ¤20.00 07/10/2018
SURCHARGE FS 533.721 ¤12.36 07/10/2018
SURCHARGE - FS 468.631 ¤18.55 07/10/2018
STORM WATER PERMIT FEES ¤80.00 07/10/2018
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/10/2018
REVISION ¤40.00
CONTRACTOR CHANGE ¤40.00
CONTRACTOR CHANGE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
REINSPECTION FEE ¤40.00
Fees Total Due: ¤640.00 Total Paid: ¤7,566.34