Permit #2018041290
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2930 |
| CONDITIONED SPACE: 2856 sqft |
| OPENED PORCH (WITH ROOF) : 395 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| GARAGE: 590 sqft |
| Total Square Footage: 3972 sqft |
| Block: 0 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-947-4481 |
| Location Address: 450 SWEETGUM LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/03/2018 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: MANN GERALD F & JOANNE L H&W |
|
Address 7745 SUMMIT ROCH POINT COLUMBUS, OH 43235 |
| Lot: 293 |
| Contracted Stated Job Value: ¤687,000.00 |
| Job Description: NEW SINGLE FAMILY RESIDENTIAL |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/07/2019 | APPROVED | MWILLIAMS |
| BLD - BUILDING FINAL | 01/17/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. HOLES IN WALLS OR CEILINGS MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING (AHU ceiling) 2. SPACES AROUND PIPES MUST BE SEALED….SEALING OF ANNULAR SPACES…P2606.1 (behind consenser) 3. EXHAUST VENTS TERMINATE 3 feet FROM OPENINGS FBC.R.M1506 CANNOT TERMINATE WITHIN 3 feet OF OPENINGS (OPERABLE OR NON-OPERABLE) 4. WEATHER STRIPPING NEEDS TO BE INSTALLED R 612.1 FBC 5. HALL LIGHT AT POOL BATH NOT WORKING 6. EXHAUST FANS IN BOTH BATHS ON RIGHT SIDE OF HOUSE NOT WORKING | |||
| ROW - FINAL INSPECTION | 01/16/2019 | APPROVED - AS NOTED | RGROSS |
| Note: PER SUPER. SLEEVES CUT AND CAPPED WITH TEMPORARY CAPS IN DRIVEWAY UNTIL BRASS CAPS ARRIVE. BRASS CAPS HAVE BEEN ORDERED. | |||
| ROW - FINAL INSPECTION | 01/11/2019 | Disapproved -FEE REQUIRED | CTROHA |
| Note: Repair erosion from roof drains Valve sleves need to be cut and capped in the driveway | |||
| ROW- PRE-APRON (PRE-POUR) | 01/11/2019 | APPROVED | CTROHA |
| ROW - FINAL APRON (AFTER POUR) | 01/11/2019 | APPROVED - AS NOTED | CTROHA |
| Note: The Conservatory has valve sleves in the driveway that need cut and capped before final row inspection | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/11/2019 | APPROVED | JHINDMAN |
| ROW- PAVER RESTRAINTS | 12/13/2018 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 12/13/2018 | FINAL APPROVED | JNICHOLS |
| ROW - FINAL APRON (AFTER POUR) | 12/06/2018 | Disapproved - NO FEE | RGROSS |
| Note: NOT READY FOR FINAL INSPECTION. POSSIBLE WRONG INSPECTION SCHEDULED. NO FEE. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/16/2018 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON POUR ONLY. PAVER DRIVEWAY. PAVER RESTRAINTS NOT READY. | |||
| ELECTRIC - EARLY POWER | 11/07/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:35 | |||
| ELECTRIC - EARLY POWER | 11/06/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED APPROVED REVISION OF ELECTRIC SERVICE CHANGE ON SITE, ALSO PLANS ON SITE NEED ATTENTION | |||
| GRAVITY SEWER TEST | 10/15/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| U - SEWER TIE IN | 10/15/2018 | APPROVED | DSPENCER |
| LATH/BRICK/ WATER BARRIER | 10/01/2018 | APPROVED | CMINI |
| INSULATION | 09/24/2018 | APPROVED | CMINI |
| INSULATION | 09/21/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: CORRECTIONS NOT MADE 1. STILL NEED NAIL PLATE AT DRYER VENT (ASKED FOR AT ALL-ROUGH AND ALL-ROUGH REINSPECT) 2. FIREBLOCKING R302.11 1-6 ELECTRIC THROUGH FIRE BLOCKING AND TOP PLATE AT REF. AND PANTRY | |||
| INSULATION | 09/13/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. STILL NEED NAIL PLATE AT DRYER VENT (ASKED FOR AT ALL-ROUGH AND ALL-ROUGH REINSPECT) 2. FIREBLOCKING R302.11 1-6 ELECTRIC THROUGH FIRE BLOCKING AND TOP PLATE AT REF. AND PANTRY | |||
| ALL ROUGH | 09/07/2018 | APPROVED - AS NOTED | CMINI |
| Note: nail plate at dryer vent | |||
| ALL ROUGH | 09/05/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, 1. BOX OUT AROUND ELECT OVER PANELS 2. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 3. PRESSURE TEST FOR SUPPLLY LINES P2503.7 WATER SUPPLY-SYSTEM TESTING. 4. NEED TO SEAL DRYER DUCT AT ROOF WITH MASTIC..FBC.. M1502.4.2 AND M1601.4.1 26 5. NAIL PLATES FBC 26 R, M1308.2 PROTECTION FROM PHYSICAL DAMAGE 26 INSPECTION STOPPED NOTHING FURTHER LOOKED AT | |||
| ELECTRIC-TUG | 08/27/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 2:50 NEED REVISION ON 300 AMP SERVICE BY EARLY POWER | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/20/2018 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 08/20/2018 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 08/17/2018 | Disapproved - NO FEE | CMINI |
| Note: roof sheathing/braces/ties and down cell inspection 2460, needs to be passed before this inspection can be passed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/03/2018 | Disapproved - NO FEE | CMINI |
| Note: sheathing only nail down, need to call back when anchor,ties and engineering complete | |||
| TIE BEAM / LINTEL | 07/23/2018 | APPROVED | WMILLER |
| TIE BEAM / LINTEL | 07/20/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION 26.. MARKED ON SHEET 5 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/20/2018 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 07/13/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 06/27/2018 | APPROVED | WMILLER |
| MONOLITHIC SLAB | 06/25/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: not ready for inspection, incomplete | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/19/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED REVISION TO SHOW SUMMER KIT. ON RISER AT BACK BATH ROOM,NEED BY LINTEL INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/31/2019 | 02/06/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | HOLD | 01/22/2019 | 01/29/2019 |
| Note: Held By: JHINDMAN 1. Provide the builders signature on page 1 of form r405 and the EPL card on the revised calculations | |||
| SW1 | COMPLETE | 01/08/2019 | 01/10/2019 |
| Note: Released By: JHINDMAN Final S | |||
| BLD | COMPLETE | 12/20/2018 | 12/28/2018 |
| Note: Released By: RLEE | |||
| ELEC | COMPLETE | 09/04/2018 | 09/10/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 07/12/2018 | 07/13/2018 |
| Note: Released By: DREWIS foundation s | |||
| PLUM | COMPLETE | 06/29/2018 | 07/05/2018 |
| Note: Released By: FREODICA Revision : changed sanitary risesr diagram-added summer kitchen sink.: | |||
| ZON | COMPLETE | 06/21/2018 | 06/21/2018 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 06/14/2018 | 06/21/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 04/26/2018 | 05/01/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 04/26/2018 | 04/27/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 04/26/2018 | 04/27/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 04/26/2018 | 05/02/2018 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 04/26/2018 | 05/02/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 04/26/2018 | 04/27/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 04/26/2018 | 05/03/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 04/26/2018 | 04/27/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/06/2019 |
| REINSPECTION FEE | ¤40.00 | 02/06/2019 |
| REINSPECTION FEE | ¤40.00 | 01/10/2019 |
| REINSPECTION FEE | ¤40.00 | 01/10/2019 |
| REINSPECTION FEE | ¤40.00 | 01/10/2019 |
| REINSPECTION FEE | ¤40.00 | 01/10/2019 |
| REINSPECTION FEE | ¤40.00 | 01/10/2019 |
| REINSPECTION FEE | ¤40.00 | 01/10/2019 |
| REVISION | ¤40.00 | 01/10/2019 |
| REVISION | ¤40.00 | 01/10/2019 |
| SITE PLAN 20 | ¤20.00 | 05/03/2018 |
| SURCHARGE FS 533.721 | ¤31.05 | 05/03/2018 |
| SURCHARGE - FS 468.631 | ¤46.58 | 05/03/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/03/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 05/03/2018 |
| ADMIN FEE | ¤20.00 | 05/03/2018 |
| ELECTRIC FEE | ¤472.20 | 05/03/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 05/03/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 05/03/2018 |
| IMPACT FEE PARKS | ¤849.24 | 05/03/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/03/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 05/03/2018 |
| MECHANICAL FEE | ¤472.20 | 05/03/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/03/2018 |
| PLAN CHECK FEE | ¤274.80 | 05/03/2018 |
| PLUMBING FEE | ¤472.20 | 05/03/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,374.00 | 05/03/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,329.95 |