Permit #2018050235

Permit Details

Status: FINAL

Parcel Id: 05-11-31-5918-00000-00C0
Block: 00000
Subdivision: 2244 - VILLAGE AT PALM COAST PH 1
Job Phone: (386)586-6363
Location Address: 26 LONGVIEW WAY N
Type: SW - SEAWALL
Issue Date: 10/29/2018
NOC: RECORDED
Applicant name: CRAIG PECK
Owner: VILLAGE AT PALM COAST HOMEOWNERS ASSOC INC

Address

135 LONGVIEW WAY N

PALM COAST, FL 32137

Lot: 00F0
Contracted Stated Job Value: ¤15,000.00
Job Description: 113 LONGVIEW WAY - WOOD BULKHEAD
Type: CN

Contractor

SEAPECK SALES & SERVICE INC
Status Location Address State License Number Phone Fax
ACTIVE

3271 NORTH OLD DIXIE HIGHWAY

BUNNELL, FL 32110

CRC1329041 (Exp: 08/31/2026) (386)586-6363 (386)586-6363

Inspection History

Type Request Date Result Inspector
LDSC-LANDSCAPE/IRRIGATION FINAL 06/04/2019 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION
LDSC-LANDSCAPE/IRRIGATION FINAL 06/04/2019 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. THIS WAS SCHEDULED AND REINSPECTED BY INSPECTOR THE SAME DAY IT FAILED BECAUSE INSPECTOR ACCIDENTILY HIS THE WRONG RESULT CODE. FEE REMOVED CORRECTIONS MADE WITH THE CORRECT RESULT.
ROW - FINAL INSPECTION 05/30/2019 APPROVED KHOWELL
LDSC-LANDSCAPE/IRRIGATION FINAL 05/30/2019 Disapproved - NO FEE KHOWELL
Note: REALLY DO NOT LIKE THE WAY THE BANK IS ON THE RIGHT SIDE, I WILL LET ROBERT MAKE THE FINAL DECISION HE WILL BE BACK JUNE 3RD 2019 CALL IN FOR REINSPECTION JUNE 3RD
SEAWALL FINAL 05/30/2019 APPROVED MWILLIAMS
SEAWALL DEADMAN CAP 04/12/2019 APPROVED - AS NOTED WMILLER
Note: wood bulkhead
TURBIDITY BARRIER 04/04/2019 APPROVED WMILLER
LDSC-PRE-CLEARING 01/02/2019 APPROVED RGROSS

Review History

Department Status Date In Date Out
BLD COMPLETE 10/18/2018 10/25/2018
Note: Released By: JHINDMAN
PLENV COMPLETE 10/18/2018 10/22/2018
Note: Released By: JMYERS All comments addressed.
BLD HOLD 05/04/2018 05/04/2018
Note: Held By: JHINDMAN 1. Provide signed and sealed engineered plans designed to the 6th edition of the Florida Building Code. J. Hindman 986-3784.
ENGIN1 COMPLETE 05/04/2018 05/10/2018
Note: Released By: TBAKER
SW1 COMPLETE 05/04/2018 05/07/2018
Note: Released By: JHINDMAN
ZON COMPLETE 05/04/2018 05/07/2018
Note: Released By: TDOAK Zoning review being done by environmental planner. No separate zoning review required.
PLENV HOLD 05/04/2018 05/09/2018
Note: Held By: JMYERS Please provide a Listed Species Assessment as Gopher Tortoise have been located in the area. If access is being proposed through the Parent Property, 113 Longview Way North, the assessment shall cover the entire extent of the property as well. Provide an overview of how access to the shoreline will be accommodated. Provide a status of permit modification with SJRWMD for the alteration of the Maintained Vegetated Buffer. Provide a copy of agreement with HOA giving permission to disturb the Maintained Vegetated Buffer. The following actions shall be taken during construction. All projects must use Florida Fish and Wildlife Conservation Commission (FFWCC) approved screens or barriers to prevent manatees from entering the construction zone. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. All projects shall implement a manatee observer with after action reporting. At least one person shall be designated as a manatee observer when in-water work is being performed. That person shall have experience in manatee observation and equipped with polarized sunglasses to aid in observation. The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any in-water construction activity. Movement of a work barge, other associated vessels, or any in-water work shall not be performed after sunset, or before sunrise when the possibility of spotting manatees is negligible. All vessels associated with the construction project shall operate at “Idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Awareness signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used. One sign measuring at least 3 ft. by 4 ft. which reads Caution: Manatee Area must be posted. A second sign measuring at least 8-1/2” by 11” explaining the requirements for “Idle Speed/No Wake” and the shutdown of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. Construction staff shall undergo a pre-construction educational program to familiarize the staff with manatee regulations and proper in-water protocol to prevent harm to manatees.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 10/29/2018
PLAN CHECK FEE ¤40.00 10/29/2018
REMODEL/ADDITION/ACCES INSPECT ¤40.00 10/29/2018
SITE PLAN 20 ¤20.00 10/29/2018
SURCHARGE FS 533.721 ¤2.00 10/29/2018
SURCHARGE - FS 468.631 ¤2.00 10/29/2018
STORM WATER PERMIT FEES ¤80.00 10/29/2018
Fees Total Due: ¤0.00 Total Paid: ¤204.00