I want to search for...
Permit #2018050484
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00250-0170 |
| CONDITIONED SPACE: 2287 sqft |
| GARAGE: 524 sqft |
| OPENED PORCH (WITH ROOF) : 276 sqft |
| OPENED PORCH (WITH ROOF) : 181 sqft |
| Total Square Footage: 3268 sqft |
| Block: 00250 |
| Subdivision: - |
| Job Phone: (386) 547-0409 |
| Location Address: 83 SEA TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/17/2018 |
| NOC: RECORDED |
| Applicant name: BOHDAN HAWRYLUK |
| Owner: HAWRYLUK BOHDAN & IDA H&W |
|
Address 14 SLIPPER ORCHARD TRAIL E PALM COAST, FL 32164 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤100,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERCOASTAL CONSTRUCTION CO.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
14 SLIPPER ORCHID TRAIL EAST PALM COAST, FL 32164 |
CBC035048 (Exp: 08/31/2024) | (386) 547-0409 | 386-673-8868 |
Sub Contractors
WILLIE D OGLESBY
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
8401 STARR DR ORLANDO, FL 32818 |
CAC1814843 (Exp: 08/31/2022) | 407-252-3535 | 407-668-4066 |
BOHDAN HAWRYLUK
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
14 SLIPPER ORCHID TRAIL EAST PALM COAST, FL 32164 |
CBC035048 (Exp: 08/31/2024) | (386) 547-0409 | 386-673-8868 |
GREGORY ALLEN HENRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1332 SUNSET BLVD DAYTONA BEACH, FL 32117 |
EC13009193 (Exp: 08/31/2026) | 386-679-6908 |
JOHN ROBERT LONGFRITZ
| Status | Location Address | State License Number | Phone |
| CANCEL |
1323 10TH ST HOLLY HILL, FL 32117 |
CFC057901 (Exp: 08/31/2022) | 386-258-7316 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/13/2020 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH Insulation Calc needed NO WATER!! UNABLE TO CHECK ACCESSORIES. | |||
| BLD - BUILDING FINAL | 10/12/2020 | Disapproved - NO FEE | FWILLIS |
| Note: ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH Insulation Calc needed NO WATER!! UNABLE TO CHECK ACCESSORIES. | |||
| ROW - STORMWATER FINAL | 10/12/2020 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 10/12/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: spoke w/BO who said he would switch out the squared nut sewer cleanout cap with a flush mount | |||
| ROW - FINAL APRON (AFTER POUR) | 10/09/2020 | APPROVED | GBERTOLA |
| Note: THIS IS A REINSPECTION CLEAN CONCRETE OUT OF CULVERT PIPE AND REMOVE CONCRETE FROM SWALE AREA PAST THE MITERED END FOOTER ON THE RIGHT SIDE 10/09/2020 CORRECTION MADE IT | |||
| GRAVITY SEWER TEST | 10/08/2020 | APPROVED | JGIBSON |
| Note: As per Mark | |||
| ROW - FINAL APRON (AFTER POUR) | 08/18/2020 | Disapproved - NO FEE | KHOWELL |
| Note: CLEAN CONCRETE OUT OF CULVERT PIPE AND REMOVE CONCRETE FROM SWALE AREA PAST THE MITERED END FOOTER ON THE RIGHT SIDE | |||
| ROW - FINAL INSPECTION | 08/18/2020 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/27/2020 | APPROVED - AS NOTED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 07/27/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: CALL THE UTILITY DEPARTMENT AND GET THEM TO PUT A RAISER ON THE PEP TANK AND CLEAN DIRT AND CONCRETE DEBRIS OUT OF CULVERT PIPE PRIOR TO CALLING IN AFTER POUR AND ROW STORMWATER FINAL INSPECTIONS | |||
| ELECTRIC - EARLY POWER | 03/02/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEAED POWER 10:20 | |||
| ELECTRIC - EARLY POWER | 02/28/2020 | Disapproved - NO FEE | JMUNSON |
| Note: Main breaker is over 6ft 7in to the center. NEC 2014 art 240.24 Neautral is Phased wrong color. NEC 2014 200.7 A/C whip needs to be in box. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/13/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/12/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: FORM BOAREDS AT THE TOP OF THE APRON NEED TO BE 18 INCHES FROM EDGE OF PIPE FORM BOARD ALONG EDGE OF PAVEMENT NEEDS TO BE STRAIGHTENED FROM EDGE OF PAVEMENT TO RIGHT OF WAY NEEDS TO BE 5 INCHES THICK, 4 THICK INCHES FROM R.O.W. TO GARAGE MATERIAL NEEDS TO BE HALF WAY UP THE PIPE AND MATERIAL COMPACTED | |||
| U - SEWER TIE IN | 11/22/2019 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 08/28/2019 | APPROVED | DROCKWELL |
| INSULATION | 08/13/2019 | APPROVED - AS NOTED | DROCKWELL |
| Note: Move bath exhaust duct to outside...front bath | |||
| PEP TANK INSTALLATION REQUEST | 08/13/2019 | APPROVED | CSTONE |
| Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved | |||
| ALL ROUGH | 08/06/2019 | APPROVED - AS NOTED | DROCKWELL |
| Note: Move vent termination points 3ft away from openings in block/Plug hole in dryer vent w/epoxy | |||
| ROOF VALLEY & METAL | 06/07/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/17/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 04/17/2019 | APPROVED | DROCKWELL |
| ELECTRIC TEMP POLE | 04/09/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:30 | |||
| TIE BEAM / LINTEL | 04/08/2019 | APPROVED | MWILLIAMS |
| FOUND SURVEY APPROVED (OFFICE) | 01/17/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 01/02/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 12/28/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. missing compaction report see highlighted on plans 2. CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/12/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED RELIEVING ARCH ON SEWER LINES AT REAR BATHROOM |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/10/2019 | 01/17/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | COMPLETE | 09/06/2018 | 09/13/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 08/28/2018 | 08/29/2018 |
| Note: Released By: AMOBLEY | |||
| MECH | HOLD | 08/28/2018 | 09/04/2018 |
| Note: Held By: JHINDMAN Repeat of previous comment. The total calculated cooling load shows 33,488 btuh and the selected hvac units capacity shows 43,185 btuh. This is over 1.15 times greater than the calculated load and doesn not comply with FBCEC 6th ed. R403.7.1.1 J. Hindman 986-3784. | |||
| ZON | HOLD | 08/17/2018 | 08/20/2018 |
| Note: Held By: AMOBLEY Walkways can not exceed the maximum width of 6ft | |||
| MECH | HOLD | 08/17/2018 | 08/21/2018 |
| Note: Held By: FREODICA Repeat comment item 4: 4. Provide complete information of selected hvac units on heating/cooling equipment summary per FBCEC 6th ed. R403.7. F.Reodica -386-986-4734. Note: The total calculated cooling load shows 33,488 btuh and the selected hvac units capacity shows 43,185 btuh. This is over 1.15 times greater than the calculated load and doesn not comply with FBCEC 6th ed. R403.7.1.1 | |||
| BLD | COMPLETE | 08/17/2018 | 08/23/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 08/07/2018 | 08/08/2018 |
| Note: Held By: AMOBLEY Walkways can not exceed the maximum width of 6ft Landscape plan is very difficult to read AC pad must be screened with 7 gallon shrubs Please specify the type of trees being used for the 4 required trees Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. | |||
| BLD | HOLD | 08/07/2018 | 08/09/2018 |
| Note: Held By: JHINDMAN Wall section section C does not match foundation plan. It is for an interior wall. Section C has both interior and exterior walls on the foundation plan. J. Hindman 986-3784 3rd request | |||
| MECH | HOLD | 08/07/2018 | 08/09/2018 |
| Note: Held By: FREODICA Repeat comments: 1. Florida energy code compliance certification shall be signed by owner/agent per FBCEC R405.3. 2. Energy perfomance level (EPL) dispaly card shall be signed by the builder per FBCE 6th ed. 401.3. 3. Referenced design location on energy calculation shows Daytona Beach, FL but equipment sizing calculation shows St. Augustine, FL. Coordinate per FBC 6th ed. 107.1. 4. Provide complete information of selected hvac units on heating/cooling equipment summary per FBCEC 6th ed. R403.7. F.Reodica -386-986-4734. | |||
| ZON | HOLD | 08/01/2018 | 08/01/2018 |
| Note: Held By: AMOBLEY Walkways can not exceed the maximum width of 6ft Landscape plan is very difficult to read AC pad must be screened with 7 gallon shrubs Please specify the type of trees being used for the 4 required trees Shrubs must wrap each corner and must have at least 4 shrubs along each side of home | |||
| ELEC | COMPLETE | 08/01/2018 | 08/03/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 08/01/2018 | 08/03/2018 |
| Note: Released By: DREWIS | |||
| BLD | HOLD | 08/01/2018 | 08/03/2018 |
| Note: Held By: JHINDMAN 5. Provide truss layout plan 6th ed. FBC 103.5. 6.. Wall section section C does not match foundation plan. It is for an interior wall. Section C has both interior and exterior walls on the foundation plan. J. Hindman 986-3784 | |||
| MECH | HOLD | 08/01/2018 | 08/06/2018 |
| Note: Held By: FREODICA Review comments based on submitted correction on energy calculations: 1. Florida energy code compliance certification shall be signed by owner/agent per FBCEC R405.3. 2. Energy perfomance level (EPL) dispaly card shall be signed by the builder per FBCE 6th ed. 401.3. 3. Referenced design location on energy calculation shows Daytona Beach, FL but equipment sizing calculation shows St. Augustine, FL. Coordinate per FBC 6th ed. 107.1. 4. Provide complete information of selected hvac units on heating/cooling equipment summary per FBCEC 6th ed. R403.7. F.Reodica -386-986-4734. | |||
| SWALE | COMPLETE | 05/10/2018 | 05/30/2018 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 05/10/2018 | 05/11/2018 |
| Note: Held By: JHINDMAN 1. Provide a complete set of plans that are signed and sealed. the plans only have a photocopy of the seal and the new signature does not have a seal under it per statute. 2. On page 3/8 Provide the correct code references on the plans. The code criteria is not to the current code. The general note number 14 references the wrong code and the handwritten note for the garage walls is the wrong code section.3. The plans have 2 types of design criteria one is for an enclosed building and the other is for a partially enclosed structure with the wrong code sections. 4. Provide a roof underlayment on the typical wall section that complies with the 6th ed. FBC R905.1.1. 5. Provide truss layout plan with connectors per typical wall note and 6th ed. FBC 103.5. 6. page 8 is not legible and roof sheathing table is for 120 mph. not 130.mph. 7. Foundation section C does not match foundation plan. J. Hindman 986-3784 | |||
| ELEC | HOLD | 05/10/2018 | 05/11/2018 |
| Note: Held By: DREWIS Notes too blurred for review. Update to NEC 2014. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 05/10/2018 | 05/10/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 05/10/2018 | 05/15/2018 |
| Note: Held By: FREODICA 1. Provide hvac plan with signature and licens number of hvac contractor per FBC 6th ed. 105.3.1.2(3) . 2. The capacity of selected hvac units shall not be more than 1.15 times greater than the calculated total cooling load per FBCEC 6th ed. R403.7.1.1. 3. Directional orienatation of the building shown on energy calculations shall be coordinated with site plan to comply with FBCEC 6th ed. R403.7.1. 4. The energy calculations shall be based on the updated code FBCEC 6th ed. (2017). F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 05/10/2018 | 05/15/2018 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 05/10/2018 | 05/11/2018 |
| Note: Held By: DREWIS Provide a complete site plan with proposed elevations for storm water and grades at the foundation and 10' away per FBC 6th ed. R401.3. and COPC Tech. Manual Sec. 5 Eng. Standard. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 05/10/2018 | 05/15/2018 |
| Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 05/10/2018 | 05/10/2018 |
| Note: Held By: AMOBLEY Please provide a landscape plan Site plan should show lot total square footage Floor plan area calculations aren't adding up correctly |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 10/16/2020 |
| REINSPECTION FEE | ¤40.00 | 10/16/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤588.00 | 09/17/2018 |
| SITE PLAN 20 | ¤20.00 | 09/17/2018 |
| SURCHARGE FS 533.721 | ¤14.55 | 09/17/2018 |
| SURCHARGE - FS 468.631 | ¤21.82 | 09/17/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/17/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 09/17/2018 |
| ADMIN FEE | ¤20.00 | 09/17/2018 |
| ELECTRIC FEE | ¤236.40 | 09/17/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 09/17/2018 |
| IMPACT FEE FIRE | ¤218.79 | 09/17/2018 |
| IMPACT FEE PARKS | ¤849.24 | 09/17/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/17/2018 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 09/17/2018 |
| MECHANICAL FEE | ¤236.40 | 09/17/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/17/2018 |
| PLAN CHECK FEE | ¤117.60 | 09/17/2018 |
| PLUMBING FEE | ¤236.40 | 09/17/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,870.20 |