Permit #2018050730

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00260-0120
CONDITIONED SPACE: 2002 sqft
GARAGE: 477 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2708 sqft
Block: 00260
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: (386)383-0376
Location Address: 82 EASTWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/12/2018
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: ONATE, ENRIQUE

Address

82 EASTWOOD DR

PALM COAST, FL 32164

Lot: 0120
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC052446 (Exp: 08/31/2026) 386-445-5023 386-446-4614
BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
WILLIAM D ALLEN
Status Location Address State License Number Phone Fax
INACTIVE

546 S. SHELL ROAD

DEBARY, FL 32713

LQ27843 (Exp: 08/13/2024) 386-668-9592 (386)668-8577

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/10/2019 FINAL APPROVED WMILLER
Note: FINAL APPROVED
ROW - FINAL APRON (AFTER POUR) 01/09/2019 APPROVED KHOWELL
ROW - FINAL INSPECTION 01/09/2019 CANCELLED BY APPLICANT KHOWELL
Note: COULD NOT DO FINAL R.O.W. BECAUSE PEP TANK HAS SINK HOLE NEXT TO IT.
ROW - FINAL INSPECTION 01/09/2019 FINAL APPROVED KHOWELL
Note: THIS IS A REINSPECTIONPEP TANK SINK HOLE IS BEING CAUSED BY HOME NEXT DOOR TO THIS NEW HOME, UTILITY DEPARTMENT WILL MAKE REPAIRS TO TANK AND SOD
U -UTILITY RESIDENTIAL FINAL 01/09/2019 FINAL APPROVED MBACON
FINAL SURVEY (OFFICE USE ONLY) 01/08/2019 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
GAS ROUGH 12/19/2018 CANCELLED BY APPLICANT LMUSGROVE
GAS FINAL 12/19/2018 APPROVED JGIBSON
GAS ROUGH 12/17/2018 APPROVED - AS NOTED JGIBSON
Note: BOTH REGULATOR VENTS NEED TO BE 5' AWAY FROM IGNITION SOURCE, POOL HEATER AND HOUSE REGULATOR VENTS
FINAL SURVEY (OFFICE USE ONLY) 12/17/2018 Disapproved - NO FEE DREWIS
Note: Elevations on the left allow flow from the adjacent property past easement and elevations on the right allow flow onto the adjacent property, Tech. Manual Sec. 5 Eng. Standard 300.01. Provide 5% slope for grade from the foundation wall, FBC R401.3 Daniel Rewis 986-4736
GAS FINAL 12/10/2018 APPROVED JGIBSON
GRAVITY SEWER TEST 12/03/2018 APPROVED JGIBSON
U - SEWER TIE IN 12/03/2018 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 11/15/2018 APPROVED KHOWELL
ROW- PAVER RESTRAINTS 11/15/2018 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 11/01/2018 APPROVED CTROHA
Note: ready for pavers
ROW- PRE-APRON (PRE-POUR) 10/26/2018 PARTIALLY APPROVED KHOWELL
Note: APRON AND PIPE POUR PAVER DRIVEWAY A PAVER RESTRAINT INSPECTION WILL NEED TO BE DONE
ROW- PRE-APRON (PRE-POUR) 10/25/2018 Disapproved -FEE REQUIRED KHOWELL
Note: NOT FORMED AT THE TIME OF INSPECTION
ELECTRIC - EARLY POWER 10/22/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:40
GAS ROUGH 09/19/2018 APPROVED - AS NOTED JGIBSON
Note: THIS WAS FOR GAS RUNNING TO POOL HEATER AND FUTURE GRILL AND FOR FUTURE FIRE-PLACE, NEED TO CALL FOR ANOTHER GAS ROUGH WHEN GAS IS RAN TO POOL EQUIPMENT AT A LATER DATE
INSULATION 09/18/2018 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 09/18/2018 APPROVED DROCKWELL
ALL ROUGH 09/13/2018 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/12/2018 APPROVED DROCKWELL
ROOF VALLEY & METAL 08/29/2018 APPROVED DROCKWELL
TIE BEAM / LINTEL 08/01/2018 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 07/23/2018 APPROVED DREWIS
MONOLITHIC SLAB 07/12/2018 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 07/10/2018 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/03/2019 01/08/2019
Note: Released By: JHINDMAN Rev Final S
BLD COMPLETE 12/20/2018 12/28/2018
Note: Released By: RLEE
ELEC COMPLETE 12/14/2018 12/19/2018
Note: Released By: DREWIS
SW1 HOLD 12/13/2018 12/17/2018
Note: Held By: DREWIS final Elevations on the left allow flow from the adjacent property past easement and elevations on the right allow flow onto the adjacent property, Tech. Manual Sec. 5 Eng. Standard 300.01. Provide 5% slope for grade from the foundation wall, FBC R401.3 Daniel Rewis 986-4736
BLD COMPLETE 08/31/2018 09/06/2018
Note: Released By: JHINDMAN
BLD COMPLETE 07/30/2018 07/31/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 07/23/2018 07/23/2018
Note: Released By: DREWIS Foundation survey
SW1 COMPLETE 06/08/2018 06/11/2018
Note: Released By: DREWIS
PLUM COMPLETE 06/08/2018 06/11/2018
Note: Released By: FREODICA
ZON COMPLETE 06/08/2018 06/08/2018
Note: Released By: AMOBLEY
ZON COMPLETE 05/31/2018 06/01/2018
Note: Released By: TDOAK
ELEC COMPLETE 05/31/2018 06/01/2018
Note: Released By: DREWIS
SW1 HOLD 05/31/2018 06/01/2018
Note: Held By: DREWIS Provide additional elevations for flow on the left side. As it is now it appears that flow from the adjacent property flows onto the lot. Daniel Rewis 986-4736
PLUM HOLD 05/31/2018 06/05/2018
Note: Held By: FREODICA Gas pipe sizes shall comply with FBCFG 6th ed. T-402.4 (32) and T-402.4(35). F.Reodica -386-986-4734.
BLD COMPLETE 05/31/2018 06/07/2018
Note: Released By: JHINDMAN
UD1 COMPLETE 05/31/2018 06/04/2018
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
SWALE COMPLETE 05/18/2018 06/07/2018
Note: Released By: TBAKER
BLD HOLD 05/15/2018 05/17/2018
Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition of the Florida Building Code. J. Hindman 986-3784.
ELEC HOLD 05/15/2018 05/17/2018
Note: Held By: DREWIS Electrical plan E1 not provided. Daniel Rewis 986-4736
ENGIN1 COMPLETE 05/15/2018 05/18/2018
Note: Released By: TBAKER
MECH COMPLETE 05/15/2018 05/17/2018
Note: Released By: FREODICA
PLUM HOLD 05/15/2018 05/17/2018
Note: Held By: FREODICA Gas riser diagram: Provide gas pipe sizes and materials for future grill and gas logs and delivery pressure from first stage to second stage regulator per FBCFG 6th ed. 402. F.Reodica -386-986-4734.
SW1 HOLD 05/15/2018 05/17/2018
Note: Held By: DREWIS Site plan too blurred for review. Provide a clear site plan depicting proposed storm water flow elevations and slope requirements away from the residence per FBC 6th ed R401.3. Daniel Rewis 986-4736
UD1 HOLD 05/15/2018 05/18/2018
Note: Held By: LFITZGERALD PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan
ZON HOLD 05/15/2018 05/16/2018
Note: Held By: TAWILLIAMS The Right-Of-Away Utilization Agreement needs to be signed by Mrs. Orate excatly like her name appears on the deed. She signed as Amy Onate. All names must match on all pages. Then the signature page will need to be notorized again.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 01/10/2019
REVISION ¤40.00 01/10/2019
REVISION ¤40.00 01/10/2019
REINSPECTION FEE ¤40.00 01/10/2019
NEW RESIDENTIAL INSPECTIONS ¤600.00 06/12/2018
SITE PLAN 20 ¤20.00 06/12/2018
SURCHARGE FS 533.721 ¤14.80 06/12/2018
SURCHARGE - FS 468.631 ¤22.20 06/12/2018
STORM WATER PERMIT FEES ¤80.00 06/12/2018
3% TRANS IMPACT FEE CREDIT (¤48.96) 06/12/2018
ADMIN FEE ¤20.00 06/12/2018
ELECTRIC FEE ¤240.00 06/12/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 06/12/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 06/12/2018
IMPACT FEE PARKS ¤849.24 06/12/2018
IMPACT FEE SCHOOL ¤3,600.00 06/12/2018
RECORDING FEE REIMBURSE DOC ¤52.50 06/12/2018
IMPACT FEE TRANSPORTATION ¤1,632.00 06/12/2018
MECHANICAL FEE ¤240.00 06/12/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/12/2018
PLAN CHECK FEE ¤120.00 06/12/2018
PLUMBING FEE ¤240.00 06/12/2018
Fees Total Due: ¤0.00 Total Paid: ¤8,028.53