I want to search for...

Permit #2018060250

Permit Details

Status: COED

Parcel Id: 41-11-31-0000-01050-0000
Block: 01050
Subdivision: -
Job Phone: 386-237-0328
Location Address: 303 PALM COAST PKWY
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 09/24/2018
NOC: RECORDED
Applicant name: JAMES JOSEPH ALBANO
Owner: ST MARK BY THE SEA LUTHERAN CHURCH OF PALM COAST F

Address

303 PALM COAST PKWY NE

PALM COAST, FL 32137

Lot: 0000
Contracted Stated Job Value: ¤125,000.00
Job Description: KITCHEN RENOVATION
Type: CN

Contractor

ALBANO DESIGNS STUDIOS, INC
Status Location Address State License Number Phone
ACTIVE

82 LEE DR

PALM COAST, FL 32137

CBC050078 (Exp: 08/31/2026) 386-237-0328

Sub Contractors

GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
KURT A UMBACH
Status Location Address State License Number Phone Fax
HOLD

110 Foster Lane

Palm Coast, FL 32137

EC13003356 (Exp: 08/31/2020) (386) 446-3616 (386)446-3548
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688

Inspection History

Type Request Date Result Inspector
GAS FINAL 04/24/2019 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
FIRE FINAL 03/15/2019 APPROVED JHINDMAN
BUILDING FINAL 03/14/2019 APPROVED MWILLIAMS
ELECTRIC FINAL 03/14/2019 APPROVED RMARTIN
GAS ROUGH 03/14/2019 APPROVED - AS NOTED JGIBSON
Note: PRESSURE WAS GOOD WATER HEATER WORKING
GAS FINAL 03/14/2019 Disapproved - NO FEE JGIBSON
Note: NEED TO HAVE SAFETY BALLARDS IN PLACE PER CODE AND PLANS
U - UTILITY COMMERCIAL FINAL 02/12/2019 FINAL APPROVED JNICHOLS
U-GREASE INTERCEPTOR PRE-INSTALLATION 02/12/2019 APPROVED JNICHOLS
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 02/11/2019 APPROVED JNICHOLS
U-GREASE INTERCEPTOR FLOW/DYE TESTED 02/11/2019 APPROVED JNICHOLS
GAS ROUGH 02/11/2019 Disapproved - NO FEE JHINDMAN
Note: provide test guage on line.6th ed. FBC FG 406
ABOVE CEILING 02/11/2019 APPROVED JHINDMAN
PLUMBING FINAL 02/11/2019 APPROVED - AS NOTED JHINDMAN
Note: check hot water at gas final
HVAC FINAL 02/11/2019 APPROVED JHINDMAN
PLUMBING 2ND ROUGH 10/31/2018 APPROVED JGIBSON
HVAC ROUGH 10/30/2018 APPROVED JHINDMAN
PLUMBING 2ND ROUGH 10/30/2018 CANCELLED BY APPLICANT JGIBSON
Note: CONTRACTOR CALL TO CANCEAL
GAS ROUGH 10/30/2018 PARTIALLY APPROVED JGIBSON
Note: THIS WAS FOR INSIDE LINES ONLY, NEED UNDERGROUND FROM TANK TO BUILDING
ELECTRIC 2ND ROUGH 10/26/2018 APPROVED - AS NOTED RMARTIN
Note: NEED REVISION BY ELECTRIC FINAL ON ADDED AND DELETED SWITCHES/OUTLETS
FRAMING 10/24/2018 APPROVED WMILLER
Note: APPROVED
ELECTRIC 2ND ROUGH 10/23/2018 PARTIALLY APPROVED RMARTIN
Note: WALLS ONLY
PLUMBING 1ST ROUGH 10/23/2018 APPROVED - AS NOTED JGIBSON
Note: THIS WAS FOR SANITARY AND FOR GREASE LINES PER PLAN AND INDIRECT SPECIAL WASTE CODED 802.1.1

Review History

Department Status Date In Date Out
FI1 COMPLETE 08/16/2018 08/28/2018
Note: Released By: JHINDMAN
MECH COMPLETE 08/16/2018 08/16/2018
Note: Released By: FREODICA Separate hood permit will be applied by climate control per contractor's note on correction form.
PLUM COMPLETE 08/16/2018 08/16/2018
Note: Released By: FREODICA
BLD COMPLETE 07/10/2018 07/19/2018
Note: Released By: JHINDMAN
FI1 HOLD 07/10/2018 07/18/2018
Note: Held By: DREWIS Cannot release until additional permits applied for. Daniel Rewis 986-4736
MECH HOLD 07/10/2018 07/20/2018
Note: Held By: FREODICA Repaet comment for item 1: 1. Provide existing and proposed hvac plan either prepared by design professional or an hvac contractor with signature and license number per FBC 6th ed.105.3.1.2. C503,1/C403.2.1. F.REodica -386-986-4734.
PLUM HOLD 07/10/2018 07/20/2018
Note: Held By: FREODICA 1, Plumbing riser diagram shows (2) hand sinks but floor plan shows only (1) hand sink. Coordinate per FBC 6th ed. 107.1 2. Provide gas riser diagram complete with pipe sizes and materials with signature and license number of gas contractor per FBCFG 6th ed. 402/403. F.Reodica -386-986-4734.
UD1 COMPLETE 07/10/2018 07/11/2018
Note: Released By: CJOHNSON
BLD HOLD 06/06/2018 06/19/2018
Note: Held By: JHINDMAN 1. Provide a complete scope of work with an existing fixture and floorplan. J. Hindman 986-3784.6th ed. FBC 107.2.1.
ELEC COMPLETE 06/06/2018 06/11/2018
Note: Released By: DREWIS
FI1 HOLD 06/06/2018 06/19/2018
Note: Held By: JHINDMAN 1. Provide a complete scope of work. If Exhaust hood is new seperate permits for the hood and suppression systems will be required. J. Hindman 986-3784.
MECH HOLD 06/06/2018 06/19/2018
Note: Held By: FREODICA 1. Provide existing and proposed hvac plan either prepared by design professional or an hvac contractor with signature and license number per FBC 6th ed.105.3.1.2. 2. Provide hvac contractor per F.S. 489. 3. Provide separate permit for kitchen hood per FBC 6th ed. 107.1. 4. Provide hvac equipment sizing calculation for heating and cooling loads to verify if existing hvac units can handle the loaad or a new units are required per FBCEC 6th ed. C503,1/C403.2.1. F.REodica -386-986-4734.
PLUM HOLD 06/06/2018 06/19/2018
Note: Held By: FREODICA Provide sanitary, domestic water (hot and cold) and gas riser diagrams either prepared by design professional or registered contractors (plumbing and gas) with signature and license number per FBC 6th ed. 107.3.5. F.Reodica -386-986-4734.
UD1 HOLD 06/06/2018 06/25/2018
Note: Held By: CJOHNSON Revise A3 per approved grease intereceptor exemption form plan that was submitted.
ZON COMPLETE 06/06/2018 06/07/2018
Note: Released By: JGONZALEZ

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN COMMERCIAL ¤60.00 09/24/2018
INSPECTION - COMMERCIAL ADD ¤875.00 09/24/2018
CONTRACTOR CHANGE ¤40.00 09/24/2018
ELECTRIC FEE ¤135.00 09/24/2018
MECHANICAL FEE ¤135.00 09/24/2018
PLAN CHECK FEE ¤143.75 09/24/2018
PLUMBING FEE ¤135.00 09/24/2018
SITE PLAN 20 ¤20.00 09/24/2018
SURCHARGE FS 533.721 ¤6.29 09/24/2018
SURCHARGE - FS 468.631 ¤9.43 09/24/2018
Fees Total Due: ¤0.00 Total Paid: ¤1,559.47