Permit #2018060339
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7006-00030-0100 |
| Block: 00030 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: (386)447-8003 |
| Location Address: 2 FLEMING CT |
| Type: SW - SEAWALL |
| Issue Date: 07/02/2018 |
| NOC: RECORDED |
| Applicant name: CHRIS HOWARD |
| Owner: FERRO'S PALM COAST LLC |
|
Address 10 WILLIAM STREET BEDFORD, MA 01730 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤37,835.00 |
| Job Description: 161 FT GRAY VINYL SEAWALL PANELS |
| Type: CN |
Contractor
JC MARINE CONTRACTORS INC
| Status | Location Address | Phone |
| CANCEL |
2550 N US 1 SUITE 2 BUNNELL, FL 32110 |
(386)447-8003 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEAWALL FINAL | 12/20/2019 | FINAL APPROVED | JDELBONIS |
| ROW - FINAL INSPECTION | 12/19/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| LDSC-LANDSCAPE/IRRIGATION FINAL | 12/09/2019 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 12/09/2019 | Disapproved - NO FEE | RGROSS |
| Note: TURBIDITY BARRIER NEEDS REMOVED. | |||
| SEAWALL DEADMAN CAP | 06/20/2019 | APPROVED | MWILLIAMS |
| TURBIDITY BARRIER | 04/08/2019 | APPROVED | MWILLIAMS |
| PROJECT STATUS (OFFICE USE) | 04/05/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: On this date I spoke with the homeowner at this permitted address. She reported that this project is nearing one year since it started. This project appears to be at about half completed. The disturbed unprotected soil is now heavily eroding on the bank near the seawall area. There is construction debris and trash laying in the yard. The owner reports there has been very little work completed in recent months. She also reported that the same contractor installed a boat lift for them at this address. There is a heavy build up of silt under the lift and it keeps them from lowering the boat into the water or using the lift. According to the homeowner report it appears that the contractor has abandoned this project. He has been telling her the city is holding him up on a permit to repair damage to the neighboring seawall. There is no delay at this time with the Building Department. It appears the permit was only recently submitted within the past week. | |||
| PROJECT STATUS (OFFICE USE) | 03/28/2019 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION (SECOND REQUEST) Turbidity barrier is still not in place (only a portion is in place, the entire length must be protected with turbidity barrier) and must be placed. No further work until turbidity barrier is in place. Make corrections immediately. | |||
| PROJECT STATUS (OFFICE USE) | 11/30/2018 | Disapproved - NO FEE | WMILLER |
| Note: Turbidity barrier is not in place and must be placed. No further work until turbidity barrier is in place. Make corrections immediately. | |||
| TURBIDITY BARRIER | 07/06/2018 | APPROVED | WMILLER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/08/2018 | 06/15/2018 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 06/08/2018 | 06/12/2018 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 06/08/2018 | 06/11/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 06/08/2018 | 06/11/2018 |
| Note: Released By: TDOAK |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 12/19/2019 |
| PLAN CHECK FEE | ¤40.00 | 07/02/2018 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 07/02/2018 |
| SITE PLAN 20 | ¤20.00 | 07/02/2018 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/02/2018 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/02/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/02/2018 |
| ADMIN FEE | ¤20.00 | 07/02/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤244.00 |