Permit #2018060371
Permit Details
Status: FINAL
| Parcel Id: 44-11-31-0000-01010-0020 |
| Block: 01010 |
| Subdivision: - |
| Job Phone: 904-669-2931 |
| Location Address: 4500 PALM COAST PKWY |
| Type: CSDM - COMMERCIAL SITE DEV -MINOR |
| Issue Date: 07/10/2018 |
| NOC: RECORDED |
| Applicant name: GARY M MCCUMBER |
| Owner: WATCHTOWER BIBLE AND TRACT SOCIETY OF NEW YORK |
|
Address 900 RED MILLS ROAD WALLKILL, NY 12589 |
|
Address C/O REAL ESTATE DEPARTMENT WALLKILL, NY 12589 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: PARKING LOT ASPHALT , LANDSCAPING & LIFT ARM GATES |
| Type: CN |
Contractor
MCCUMBER HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
52 TUSCAN WAY STE 202-353 ST AUGUSTINE, FL 32092 |
CGCA17888 (Exp: 08/31/2022) | 904-669-2931 |
Sub Contractors
KORY WOLVERTON
| Status | Location Address | Phone |
| CANCEL |
2 POTWOOD PLACE PALM COAST, FL 32164 |
386-679-7978 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 07/10/2019 | FINAL APPROVED | BDAWSON |
| Note: THIS IS A REINSPECTION | |||
| BLD- ADA PARKING | 03/26/2019 | APPROVED | WMILLER |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 03/22/2019 | Disapproved - NO FEE | BDAWSON |
| Note: Provide irrigation as-built. Modify landscape as-built as needed for any replacements of dead material. | |||
| LDSC- LANDSCAPE FINAL | 03/22/2019 | Disapproved -FEE REQUIRED | BDAWSON |
| Note: Sod or mulch disturbed/bare dirt areas around parking lot, replace the dead loropetalum, replace (1) dead azalea around ac unit, pull excess mulch off of existing oak trees. | |||
| UC-FINAL SITE INSPECTION | 10/31/2018 | FINAL APPROVED | LFITZGERALD |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 10/31/2018 | FINAL APPROVED | LFITZGERALD |
| BLD- ADA PARKING | 10/31/2018 | PARTIALLY APPROVED | WMILLER |
| Note: ADA PARKING SIGNS IN PLACE | |||
| LDSC- LANDSCAPE FINAL | 09/26/2018 | Disapproved -FEE REQUIRED | WBUTLER |
| Note: WMB 9/26/18 During a site walk of the perimeter of the repaved areas it was noted that several areas outside of the paving limits had been disturbed and not properly graded out, excess soil and asphalt removed and the disturbed areas either sodded with Bahia grass or mulched. This needs to be done and the inspection called in again. | |||
| CONCRETE FORM WORK | 09/24/2018 | APPROVED | CMINI |
| BLD- UNDERGROUND ELEC/GAS | 09/24/2018 | APPROVED | RMARTIN |
| BLD - SITE STRUCTURE - TRASH DUMPSTER | 09/24/2018 | APPROVED | CMINI |
| UC - PROJECT STATUS | 09/18/2018 | APPROVED | LFITZGERALD |
| Note: Due to lack of detail in the plans regarding existing striping/signage, pictures were taken all along site to compliment the approved plans to ensure that existing was placed back. As discussed with owner rep. some non functiobnal striping possibly to be eliminated at the discetion of the owner. | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 09/18/2018 | APPROVED | LFITZGERALD |
| UC-ASPHALT PRE PLACEMENT | 09/18/2018 | APPROVED | LFITZGERALD |
| Note: as an overlay, tack coat was applied at proper rate and both aspahalt and tack were constantly tested and monitored by their QA department who were on site he entire time of this scope of work. | |||
| CONCRETE FORM WORK | 07/13/2018 | PARTIALLY APPROVED | JHINDMAN |
| Note: footings for enclosures |
Review History
| Department | Status | Date In | Date Out |
| PLLA | COMPLETE | 07/07/2020 | 07/13/2020 |
| Note: Released By: BDAWSON | |||
| PLLA | COMPLETE | 03/14/2019 | 03/14/2019 |
| Note: Released By: BDAWSON | |||
| PLLA | HOLD | 01/17/2019 | 01/22/2019 |
| Note: Held By: BDAWSON It is unclear what the landscape revisions are. Please cloud the landscape revisions and relabel any sheets that show irrigation as irrigation plan. | |||
| PLLA | COMPLETE | 07/09/2018 | 07/09/2018 |
| Note: Released By: WBUTLER | |||
| PLLA | HOLD | 07/02/2018 | 07/05/2018 |
| Note: Held By: WBUTLER Cannot approve this permit contingent on another separate permit as that permit that was referenced has still not addressed all comments and not issued yet. Other comments remain as well (see mark-up). | |||
| ENGIN1 | COMPLETE | 07/02/2018 | 07/06/2018 |
| Note: Released By: SVANDEGRAAF | |||
| ENGIN1 | HOLD | 06/22/2018 | 06/29/2018 |
| Note: Held By: MPEEL Please add the following notes to the plans: "Contractor shall ensure a smooth transition to existing asphalt within Palm Coast Right-of-Way (ROW)." "Contractor shall prepare and submit a Maintenance of Traffic (MOT) Plan to the City for approval prior to beginning any work within City ROW." | |||
| PLLA | HOLD | 06/22/2018 | 06/25/2018 |
| Note: Held By: WBUTLER See comments on dumpster detail sheet and comments for the landscape and irrigation on the landscape plan for permit 2018060377 which apply to this permit as well. | |||
| BLD | COMPLETE | 06/11/2018 | 06/13/2018 |
| Note: Released By: JHINDMAN 1. Provide seperate permits for the gates and dumpster. | |||
| DSD | COMPLETE | 06/11/2018 | 06/12/2018 |
| Note: Released By: DRAMIREZ | |||
| ENGIN1 | HOLD | 06/11/2018 | 06/12/2018 |
| Note: Held By: SVANDEGRAAF Held By: MPEEL Clearly deliniate area and scope of work on site plan | |||
| PLLA | HOLD | 06/11/2018 | 06/12/2018 |
| Note: Held By: WBUTLER See comments on site plan. | |||
| UD1 | COMPLETE | 06/11/2018 | 06/11/2018 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/02/2020 |
| REINSPECTION FEE | ¤40.00 | 07/02/2020 |
| SITE PLAN 20 | ¤20.00 | 07/10/2018 |
| PERMIT FEE | ¤125.00 | 07/10/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤225.00 |