I want to search for...

Permit #2018061122

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01610-0140
CONDITIONED SPACE: 1833 sqft
GARAGE: 484 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
Total Square Footage: 2570 sqft
Block: 01610
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 386-338-1755
Location Address: 52 BIRCHWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/26/2018
NOC: RECORDED
Applicant name: SOPHAN KES
Owner: ISB CONSTRUCTION CORP

Address

107 BURROUGHS DRIVE

PALM COAST, FL 32137

Lot: 0140
Contracted Stated Job Value: ¤120,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KES CONSTRUCTION INC
Status Location Address State License Number Phone
INACTIVE

107 BURROUGHS

PALM COAST, FL 32164

CRC1332024 (Exp: 08/31/2022) 386-338-1755

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone
ACTIVE

60 COOPER LANE

PALM COAST, FL 32137

EC13008029 (Exp: 08/31/2028) 386-225-1937
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ROBERT JAMES BARROW JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

2323 N STATE ST

BUNNELL, FL 32110

UNIT 126

BUNNELL, FL 32110

CAC1817890 (Exp: 08/31/2026) 386-627-5500
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/29/2019 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 05/24/2019 FINAL APPROVED KHOWELL
ROW - FINAL INSPECTION 05/24/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 05/24/2019 CANCELLED BY APPLICANT JCOLASANTI
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 05/22/2019 FINAL APPROVED JNICHOLS
Note: sewer cleanout needs to be cut down flush to grade of thee yard
ROW - FINAL INSPECTION 05/22/2019 Disapproved -FEE REQUIRED RGROSS
Note: SOD THE BARE EARTH AREA IN THE ADJACENT VACANT ROW. SOD MUST BE BAHIA AND MATCH THE EXISTING GRADE.
ROW - FINAL APRON (AFTER POUR) 05/22/2019 APPROVED RGROSS
BLD - BUILDING FINAL 05/22/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need address on house...need access to jetted tub....need to seal hole at garage wall AHU whip....need to secure laundry tub...need electric cover under sink
FINAL SURVEY (OFFICE USE ONLY) 05/21/2019 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 04/17/2019 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 04/09/2019 APPROVED JGIBSON
ELECTRIC - EARLY POWER 03/11/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:45
ELECTRIC - EARLY POWER 02/14/2019 Disapproved - NO FEE RMARTIN
Note: THIS IS A REINSPECTION DO NOT CALL BACK IN EARLY POWER UNTIL ALL DEVICES,FIXTURES,ETC. ARE TRIMMED OUT
ELECTRIC TEMP POLE 02/13/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TEMP POWER 3:20
ELECTRIC - EARLY POWER 02/12/2019 Disapproved - NO FEE RMARTIN
Note: WRONG INSPECTION CALLED IN, NEEDS TO BE TEMP POLE INSPECTION
LATH/BRICK/ WATER BARRIER 01/28/2019 APPROVED JCOLASANTI
ALL ROUGH 01/17/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/17/2019 APPROVED MWILLIAMS
INSULATION 01/17/2019 APPROVED - AS NOTED MWILLIAMS
Note: For future reference An all rough inspection should be called for and passed prior to insulation being installed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/15/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ALL ROUGH 01/15/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need nail plate on dryer duct, need to fur walls in bath to protect pipes FBC 2405
ROOF VALLEY & METAL 12/05/2018 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 11/27/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: Valley linings shall be the following type: lined metal at least 16" wide, smooth roll roofing ASTM 6380 at least 36" wide FBC 905.2.8.2 (1,2,3)need two layers of underlayment or metal flashing for valleys
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/14/2018 PARTIALLY APPROVED JCOLASANTI
Note: just roof ok to dry in.
TIE BEAM / LINTEL 10/24/2018 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 10/23/2018 APPROVED JHINDMAN
MONOLITHIC SLAB 10/05/2018 APPROVED JCOLASANTI
MONOLITHIC SLAB 10/04/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: right sid entry footing needs to be 16" deep all four sides, (demension facing street not deep enough)
PLUMBING 1ST ROUGH UNDERGROUND 09/27/2018 APPROVED JGIBSON
GRAVITY SEWER TEST 09/27/2018 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ELEC COMPLETE 02/07/2019 02/14/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 10/19/2018 10/23/2018
Note: Released By: JHINDMAN foundation
MECH COMPLETE 07/24/2018 07/26/2018
Note: Released By: FREODICA
ZON COMPLETE 07/16/2018 07/16/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 07/16/2018 07/18/2018
Note: Released By: DREWIS
MECH HOLD 07/16/2018 07/20/2018
Note: Held By: FREODICA Repeat comments for items 1 and 3: Held By: FREODICA 1. Florida energy code compliance certification shall be signed by an owner/agent per FBCEC 6th ed. R 405.3.. 3. . Building orientation shown on energy calcualtion shal be coordinated with site plan to comply with FBCEC 6th ed. R403.7.1. F.Reodica -386-986-4734.
UD1 COMPLETE 07/16/2018 07/18/2018
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
SWALE COMPLETE 06/27/2018 07/26/2018
Note: Released By: TBAKER
BLD COMPLETE 06/26/2018 07/03/2018
Note: Released By: JHINDMAN
ELEC HOLD 06/26/2018 07/02/2018
Note: Held By: DREWIS Provide an additinal GFCI in the garage, NEC 2014 210.52G. Daniel Rewis 986-4736
ENGIN1 COMPLETE 06/26/2018 06/27/2018
Note: Released By: TBAKER
MECH HOLD 06/26/2018 07/02/2018
Note: Held By: FREODICA 1. Florida energy code compliance certification shall be signed by an owner/agent per FBCEC 6th ed. R 405.3.. 2. Energy performace level (EPL) display card shall be signed by the builder per FBCEC R401.3. 3. . Building orientation shown on energy calcualtion shal be coordinated with site plan to comply with FBCEC 6th ed. R403.7.1. 4.Referenced design location shows (2) locations. Ocala, FL on energy calculation and Daytona Beach, FL on equipment sizing calculation. Use Datona Beach, FL for design location per FBCEC 6th ed. R301.1. F.Reodica -386-986-4734.
PLUM COMPLETE 06/26/2018 07/02/2018
Note: Released By: FREODICA
SW1 COMPLETE 06/26/2018 07/02/2018
Note: Released By: DREWIS
UD1 HOLD 06/26/2018 07/03/2018
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 06/26/2018 06/27/2018
Note: Held By: TDOAK Flood maps changed effective 6/6/18. Provide revised site plan/survey with correct information.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/23/2019
REINSPECTION FEE ¤40.00 05/23/2019
REINSPECTION FEE ¤40.00 05/23/2019
REINSPECTION FEE ¤40.00 05/23/2019
REINSPECTION FEE ¤40.00 05/23/2019
NEW RESIDENTIAL INSPECTIONS ¤468.00 07/26/2018
SITE PLAN 20 ¤20.00 07/26/2018
SURCHARGE FS 533.721 ¤12.03 07/26/2018
SURCHARGE - FS 468.631 ¤18.04 07/26/2018
STORM WATER PERMIT FEES ¤80.00 07/26/2018
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/26/2018
ADMIN FEE ¤20.00 07/26/2018
ELECTRIC FEE ¤200.40 07/26/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 07/26/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 07/26/2018
IMPACT FEE PARKS ¤849.24 07/26/2018
IMPACT FEE SCHOOL ¤3,600.00 07/26/2018
IMPACT FEE TRANSPORTATION ¤1,632.00 07/26/2018
MECHANICAL FEE ¤200.40 07/26/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/26/2018
PLAN CHECK FEE ¤93.60 07/26/2018
PLUMBING FEE ¤200.40 07/26/2018
Fees Total Due: ¤0.00 Total Paid: ¤7,731.90