Permit #2018061196

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00010-0080
CONDITIONED SPACE: 2632 sqft
GARAGE: 705 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
Total Square Footage: 3740 sqft
Block: 00010
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 15 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/01/2018
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0080
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
YUVAL BOTANSKY
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/30/2019 Disapproved - NO FEE MWILLIAMS
Note: THIS IS A REINSPECTION house locked no access
BLD - BUILDING FINAL 07/30/2019 FINAL APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION House was locked earlier today no access inspection failed. Builder sent pics of the 2 items that were up for reinspection issues corrected now passing final inspection
BLD - BUILDING FINAL 05/22/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: Plans call for a concrete stoop and rear bed bath exit door/Also needs light installed same location
U-CROSS CONNECTION 05/17/2019 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 05/17/2019 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 05/02/2019 APPROVED KHOWELL
ROW - FINAL INSPECTION 05/02/2019 FINAL APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 04/30/2019 APPROVED JHINDMAN
U-CROSS CONNECTION 04/23/2019 Disapproved - NO FEE LFITZGERALD
Note: no re-use meter yet installed
U -UTILITY RESIDENTIAL FINAL 04/23/2019 CANCELLED BY APPLICANT LFITZGERALD
TUB SET 03/26/2019 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 02/26/2019 APPROVED KHOWELL
ROW- PAVER RESTRAINTS 02/21/2019 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 02/21/2019 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR CONCRETE APRON AND SIDEWALK ONLY. PVER RESTRAINTS INSPECTED AND APPROVED AT THE TIME OF THIS PRE POUR.
U - SEWER TIE IN 02/15/2019 APPROVED - AS NOTED JGIBSON
Note: PLUMBER SENT VIDEO OF U- TIE IN
GRAVITY SEWER TEST 02/15/2019 APPROVED JGIBSON
ELECTRIC - EARLY POWER 02/08/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 2:30
LATH/BRICK/ WATER BARRIER 01/25/2019 APPROVED MWILLIAMS
INSULATION 01/02/2019 APPROVED MWILLIAMS
INSULATION 12/28/2018 Disapproved -FEE REQUIRED WMILLER
Note: NOT READY FOR REINSPECTION SECOND REQUEST FOR THE FOLLOWING 1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need energy calcs on site for inspection) 2. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (all pipes and wires need to have the correct fire foam applied) SECOND REQUEST
INSULATION 12/26/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need energy calcs on site for inspection) 2. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (all pipes and wires need to have the correct fire foam applied) (also at top of electric panel) 3. romex for waterheater is no in the wall, needs to be placed in the wall and (add nail plates if needed after) Will look for this to be done by reinspection for insulation
ALL ROUGH 12/20/2018 APPROVED MWILLIAMS
ALL ROUGH 12/18/2018 Disapproved -FEE REQUIRED MWILLIAMS
Note: 1. Missing nail plates in top plate of front bedroom by garage in 3/4 furring 2. Over nothich for electrical wires in studs of load bearing wall in right rear of home per FBC 602.6.1 nothing and bored hole notching in load bearing stud may not exceed 25% of thickeness.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/17/2018 APPROVED MWILLIAMS
ROOF VALLEY & METAL 12/14/2018 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/13/2018 Disapproved -FEE REQUIRED MWILLIAMS
Note: Still missing *' scab on both sides of truss A01 as indicated on plan Load bearing wall not framed 12" on center and strapped per plan Both Items are points of failure noted in prior inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2018 Disapproved -FEE REQUIRED WMILLER
Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, PARTIAL LIST AS FOLLOWS 1. still missing CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH WILL CHECK STRAPS AND BRACING WHEN ALL DOCS ARE ONSITE 2. BEARING WALL 12INCH OC MAX SPACING EXCEEDED 3. MISSING 8 FOOT 2X4 SCAB ALONG EACH SIDE OF TRUSS A01 CENTGERED OF BEARING POINT PER PLANS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/15/2018 Disapproved -FEE REQUIRED WMILLER
Note: NEED TRUSS ENGINEERING DOCUMENTS ON SITE FOR INSPECTION (PARTIAL INSPECTION ONLY COULD NOT PERFORM FULL INSPECCTION WITHOUT TRUSS ENGINEERING) PARTIAL LIST AS FOLLOWS CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH WILL CHECK STRAPS AND BRACING WHEN ALL DOCS ARE ONSITE
ROOF VALLEY & METAL 11/15/2018 Disapproved - NO FEE WMILLER
Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR
FOUND SURVEY APPROVED (OFFICE) 11/11/2018 APPROVED DREWIS
ELECTRIC-TUG 11/09/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 2:50
ROOF SHEATHING 11/09/2018 APPROVED WMILLER
Note: APPROVED
ELECTRIC-TUG 10/30/2018 Disapproved -FEE REQUIRED RMARTIN
Note: PLANS ON SITE NEED TO BE THE APPROVED SET FROM CITY OF PALM COAST
ELECTRIC-TUG 10/25/2018 Disapproved -FEE REQUIRED RMARTIN
Note: NEED TO HAVE APPROVED PLAN ON SITE, PLAN ON SITE WAS NOT CORRECT SET
ELECTRIC-TUG 10/23/2018 Disapproved -FEE REQUIRED WMILLER
Note: PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
TIE BEAM / LINTEL 10/22/2018 APPROVED CMINI
TIE BEAM / LINTEL 10/19/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET 2. DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID (NEED TO CLEAN DEBRIS) ALL MARKED ON PLANS
MONOLITHIC SLAB 10/08/2018 APPROVED CMINI
MONOLITHIC SLAB 10/05/2018 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 10/04/2018 APPROVED JGIBSON
FOUND SURVEY APPROVED (OFFICE) 09/28/2018 APPROVED DREWIS
FOOTER 09/06/2018 APPROVED CMINI
FOOTER 09/05/2018 Disapproved -FEE REQUIRED CMINI
Note: need to remove all vegetation and organic material from footers, removal of tree root. FBC 408.5. CLEARANCE ON REBAR FROM EARTH 3 1D FBC 403

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/29/2019 04/30/2019
Note: Released By: JHINDMAN
SW1 HOLD 03/22/2019 03/27/2019
Note: Held By: RLEE Final Survey Positive drainage not to be on neighboring property. Provide survey identifying grades between building and lotside lot lines indicating flow and 5% slope per code. Greades provides does not indicate location .
SW1 COMPLETE 11/06/2018 11/11/2018
Note: Released By: DREWIS Foundation S
SW1 COMPLETE 09/26/2018 09/28/2018
Note: Released By: DREWIS Foundation survey
ELEC COMPLETE 07/23/2018 07/26/2018
Note: Released By: DREWIS
URB COMPLETE 07/23/2018 07/26/2018
Note: Released By: JBEAUDET
ZON COMPLETE 07/12/2018 07/12/2018
Note: Released By: AMOBLEY
URB HOLD 07/12/2018 07/20/2018
Note: Held By: JBEAUDET 7/20/18 (JB) Need to submit a plan showing approved street trees, type, size and placement per the approved street tree plan for Hidden Lakes Phase 2
UD1 COMPLETE 07/12/2018 07/16/2018
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ELEC HOLD 07/12/2018 07/17/2018
Note: Held By: DREWIS Provide load calculations. Daniel Rewis 986-4736
SW1 COMPLETE 07/12/2018 07/16/2018
Note: Released By: DREWIS
MECH COMPLETE 07/12/2018 07/18/2018
Note: Released By: FREODICA
URB HOLD 06/28/2018 06/29/2018
Note: Held By: JBEAUDET 1: Need to install 2 street trees 1 Live oak right front and 1 Laurel oak left front 2" caliper measured 6" from the top of the root plate, 30 gallon minimum container size installed Maximum 50ft o/c and Minimum 5ft and Maximum of 12ft. 6in. from sidewalks, curbing, driveways and utilities. This is per the approved street tree plan agreement for Hidden Lakes PUD Phase 2 Water Oaks.
BLD COMPLETE 06/27/2018 07/05/2018
Note: Released By: JHINDMAN
ELEC HOLD 06/27/2018 07/03/2018
Note: Held By: DREWIS Provide load calculations and an additional GFCI in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-4736
ENGIN1 COMPLETE 06/27/2018 07/02/2018
Note: Released By: TBAKER
MECH HOLD 06/27/2018 07/03/2018
Note: Held By: FREODICA 1. Provide referenced design location either Daytona Beach or St. Agustine per FBCEC 6th ed. R301.1 2. Florida energy code compliance certification shall be signed by owner/agent per FBCEC 6th ed. R405.3 3. Energy performance level (EPL) display card shall be signed by the builder per FBCEC 6th ed. R401.3. 4. The capacity of selected hvac units shall not be more than 1.15 times greater than the total calculated cooling loads per FBCEC 6th ed. R403.7.1.1. F.Reodica -386-986-4734.
PLUM COMPLETE 06/27/2018 07/03/2018
Note: Released By: FREODICA
SW1 HOLD 06/27/2018 07/03/2018
Note: Held By: DREWIS Proposed elevations on the right side and front between walkway and garage do not meet FBC R401.3 requirements. Daniel Rewis 986-4736
UD1 HOLD 06/27/2018 07/03/2018
Note: Held By: LFITZGERALD No marked utility site plan submitted
ZON HOLD 06/27/2018 06/28/2018
Note: Held By: AMOBLEY Flood maps were updated 6/6/18. Surveys must have the new information

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 11/05/2018
REINSPECTION FEE ¤40.00 11/05/2018
REINSPECTION FEE ¤40.00 10/25/2018
REINSPECTION FEE ¤40.00 10/25/2018
REINSPECTION FEE ¤40.00 10/25/2018
NEW RESIDENTIAL INSPECTIONS ¤674.00 08/01/2018
SITE PLAN 20 ¤20.00 08/01/2018
SURCHARGE FS 533.721 ¤16.35 08/01/2018
SURCHARGE - FS 468.631 ¤24.53 08/01/2018
STORM WATER PERMIT FEES ¤80.00 08/01/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 08/01/2018
ADMIN FEE ¤20.00 08/01/2018
ELECTRIC FEE ¤262.20 08/01/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 08/01/2018
IMPACT FEE FIRE ¤218.79 08/01/2018
IMPACT FEE PARKS ¤849.24 08/01/2018
IMPACT FEE SCHOOL ¤3,600.00 08/01/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 08/01/2018
MECHANICAL FEE ¤262.20 08/01/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/01/2018
PLAN CHECK FEE ¤134.80 08/01/2018
PLUMBING FEE ¤262.20 08/01/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,763.84