I want to search for...
Permit #2018061196
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00010-0080 |
| CONDITIONED SPACE: 2632 sqft |
| GARAGE: 705 sqft |
| OPENED PORCH (WITH ROOF) : 331 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 3740 sqft |
| Block: 00010 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 15 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/01/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
YUVAL BOTANSKY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/30/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: THIS IS A REINSPECTION house locked no access | |||
| BLD - BUILDING FINAL | 07/30/2019 | FINAL APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION House was locked earlier today no access inspection failed. Builder sent pics of the 2 items that were up for reinspection issues corrected now passing final inspection | |||
| BLD - BUILDING FINAL | 05/22/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Plans call for a concrete stoop and rear bed bath exit door/Also needs light installed same location | |||
| U-CROSS CONNECTION | 05/17/2019 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 05/17/2019 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 05/02/2019 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 05/02/2019 | FINAL APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 04/30/2019 | APPROVED | JHINDMAN |
| U-CROSS CONNECTION | 04/23/2019 | Disapproved - NO FEE | LFITZGERALD |
| Note: no re-use meter yet installed | |||
| U -UTILITY RESIDENTIAL FINAL | 04/23/2019 | CANCELLED BY APPLICANT | LFITZGERALD |
| TUB SET | 03/26/2019 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 02/26/2019 | APPROVED | KHOWELL |
| ROW- PAVER RESTRAINTS | 02/21/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 02/21/2019 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON AND SIDEWALK ONLY. PVER RESTRAINTS INSPECTED AND APPROVED AT THE TIME OF THIS PRE POUR. | |||
| U - SEWER TIE IN | 02/15/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: PLUMBER SENT VIDEO OF U- TIE IN | |||
| GRAVITY SEWER TEST | 02/15/2019 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 02/08/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 2:30 | |||
| LATH/BRICK/ WATER BARRIER | 01/25/2019 | APPROVED | MWILLIAMS |
| INSULATION | 01/02/2019 | APPROVED | MWILLIAMS |
| INSULATION | 12/28/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NOT READY FOR REINSPECTION SECOND REQUEST FOR THE FOLLOWING 1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need energy calcs on site for inspection) 2. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (all pipes and wires need to have the correct fire foam applied) SECOND REQUEST | |||
| INSULATION | 12/26/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need energy calcs on site for inspection) 2. FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) (all pipes and wires need to have the correct fire foam applied) (also at top of electric panel) 3. romex for waterheater is no in the wall, needs to be placed in the wall and (add nail plates if needed after) Will look for this to be done by reinspection for insulation | |||
| ALL ROUGH | 12/20/2018 | APPROVED | MWILLIAMS |
| ALL ROUGH | 12/18/2018 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: 1. Missing nail plates in top plate of front bedroom by garage in 3/4 furring 2. Over nothich for electrical wires in studs of load bearing wall in right rear of home per FBC 602.6.1 nothing and bored hole notching in load bearing stud may not exceed 25% of thickeness. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/17/2018 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 12/14/2018 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/13/2018 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: Still missing *' scab on both sides of truss A01 as indicated on plan Load bearing wall not framed 12" on center and strapped per plan Both Items are points of failure noted in prior inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/19/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, PARTIAL LIST AS FOLLOWS 1. still missing CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH WILL CHECK STRAPS AND BRACING WHEN ALL DOCS ARE ONSITE 2. BEARING WALL 12INCH OC MAX SPACING EXCEEDED 3. MISSING 8 FOOT 2X4 SCAB ALONG EACH SIDE OF TRUSS A01 CENTGERED OF BEARING POINT PER PLANS | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED TRUSS ENGINEERING DOCUMENTS ON SITE FOR INSPECTION (PARTIAL INSPECTION ONLY COULD NOT PERFORM FULL INSPECCTION WITHOUT TRUSS ENGINEERING) PARTIAL LIST AS FOLLOWS CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH WILL CHECK STRAPS AND BRACING WHEN ALL DOCS ARE ONSITE | |||
| ROOF VALLEY & METAL | 11/15/2018 | Disapproved - NO FEE | WMILLER |
| Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/11/2018 | APPROVED | DREWIS |
| ELECTRIC-TUG | 11/09/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 2:50 | |||
| ROOF SHEATHING | 11/09/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ELECTRIC-TUG | 10/30/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: PLANS ON SITE NEED TO BE THE APPROVED SET FROM CITY OF PALM COAST | |||
| ELECTRIC-TUG | 10/25/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED TO HAVE APPROVED PLAN ON SITE, PLAN ON SITE WAS NOT CORRECT SET | |||
| ELECTRIC-TUG | 10/23/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| TIE BEAM / LINTEL | 10/22/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 10/19/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET 2. DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID (NEED TO CLEAN DEBRIS) ALL MARKED ON PLANS | |||
| MONOLITHIC SLAB | 10/08/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 10/05/2018 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/04/2018 | APPROVED | JGIBSON |
| FOUND SURVEY APPROVED (OFFICE) | 09/28/2018 | APPROVED | DREWIS |
| FOOTER | 09/06/2018 | APPROVED | CMINI |
| FOOTER | 09/05/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to remove all vegetation and organic material from footers, removal of tree root. FBC 408.5. CLEARANCE ON REBAR FROM EARTH 3 1D FBC 403 |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/29/2019 | 04/30/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 03/22/2019 | 03/27/2019 |
| Note: Held By: RLEE Final Survey Positive drainage not to be on neighboring property. Provide survey identifying grades between building and lotside lot lines indicating flow and 5% slope per code. Greades provides does not indicate location . | |||
| SW1 | COMPLETE | 11/06/2018 | 11/11/2018 |
| Note: Released By: DREWIS Foundation S | |||
| SW1 | COMPLETE | 09/26/2018 | 09/28/2018 |
| Note: Released By: DREWIS Foundation survey | |||
| ELEC | COMPLETE | 07/23/2018 | 07/26/2018 |
| Note: Released By: DREWIS | |||
| URB | COMPLETE | 07/23/2018 | 07/26/2018 |
| Note: Released By: JBEAUDET | |||
| ZON | COMPLETE | 07/12/2018 | 07/12/2018 |
| Note: Released By: AMOBLEY | |||
| URB | HOLD | 07/12/2018 | 07/20/2018 |
| Note: Held By: JBEAUDET 7/20/18 (JB) Need to submit a plan showing approved street trees, type, size and placement per the approved street tree plan for Hidden Lakes Phase 2 | |||
| UD1 | COMPLETE | 07/12/2018 | 07/16/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ELEC | HOLD | 07/12/2018 | 07/17/2018 |
| Note: Held By: DREWIS Provide load calculations. Daniel Rewis 986-4736 | |||
| SW1 | COMPLETE | 07/12/2018 | 07/16/2018 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 07/12/2018 | 07/18/2018 |
| Note: Released By: FREODICA | |||
| URB | HOLD | 06/28/2018 | 06/29/2018 |
| Note: Held By: JBEAUDET 1: Need to install 2 street trees 1 Live oak right front and 1 Laurel oak left front 2" caliper measured 6" from the top of the root plate, 30 gallon minimum container size installed Maximum 50ft o/c and Minimum 5ft and Maximum of 12ft. 6in. from sidewalks, curbing, driveways and utilities. This is per the approved street tree plan agreement for Hidden Lakes PUD Phase 2 Water Oaks. | |||
| BLD | COMPLETE | 06/27/2018 | 07/05/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 06/27/2018 | 07/03/2018 |
| Note: Held By: DREWIS Provide load calculations and an additional GFCI in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 06/27/2018 | 07/02/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 06/27/2018 | 07/03/2018 |
| Note: Held By: FREODICA 1. Provide referenced design location either Daytona Beach or St. Agustine per FBCEC 6th ed. R301.1 2. Florida energy code compliance certification shall be signed by owner/agent per FBCEC 6th ed. R405.3 3. Energy performance level (EPL) display card shall be signed by the builder per FBCEC 6th ed. R401.3. 4. The capacity of selected hvac units shall not be more than 1.15 times greater than the total calculated cooling loads per FBCEC 6th ed. R403.7.1.1. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 06/27/2018 | 07/03/2018 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 06/27/2018 | 07/03/2018 |
| Note: Held By: DREWIS Proposed elevations on the right side and front between walkway and garage do not meet FBC R401.3 requirements. Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 06/27/2018 | 07/03/2018 |
| Note: Held By: LFITZGERALD No marked utility site plan submitted | |||
| ZON | HOLD | 06/27/2018 | 06/28/2018 |
| Note: Held By: AMOBLEY Flood maps were updated 6/6/18. Surveys must have the new information |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 11/05/2018 |
| REINSPECTION FEE | ¤40.00 | 11/05/2018 |
| REINSPECTION FEE | ¤40.00 | 10/25/2018 |
| REINSPECTION FEE | ¤40.00 | 10/25/2018 |
| REINSPECTION FEE | ¤40.00 | 10/25/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤674.00 | 08/01/2018 |
| SITE PLAN 20 | ¤20.00 | 08/01/2018 |
| SURCHARGE FS 533.721 | ¤16.35 | 08/01/2018 |
| SURCHARGE - FS 468.631 | ¤24.53 | 08/01/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/01/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 08/01/2018 |
| ADMIN FEE | ¤20.00 | 08/01/2018 |
| ELECTRIC FEE | ¤262.20 | 08/01/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 08/01/2018 |
| IMPACT FEE FIRE | ¤218.79 | 08/01/2018 |
| IMPACT FEE PARKS | ¤849.24 | 08/01/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/01/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 08/01/2018 |
| MECHANICAL FEE | ¤262.20 | 08/01/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/01/2018 |
| PLAN CHECK FEE | ¤134.80 | 08/01/2018 |
| PLUMBING FEE | ¤262.20 | 08/01/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,763.84 |