Permit #2018071035
Permit Details
Status: COED
| Parcel Id: 15-11-31-2830-00000-0240 |
| CONDITIONED SPACE: 1840 sqft |
| GARAGE: 583 sqft |
| OPENED PORCH (WITH ROOF) : 210 sqft |
| OPENED PORCH (WITH ROOF) : 29 sqft |
| Total Square Footage: 2662 sqft |
| Block: 00000 |
| Subdivision: 1071 - FRONT STREET @ GRAND HAVEN PHASE 1 |
| Job Phone: (386)383-0376 |
| Location Address: 22 CHINIER ST |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/10/2018 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: TRAMONTANO DEAN & MEREDITH H&W |
|
Address 166 RIDGE ROAD JUPITER, FL 33477 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
TODD MICHAEL ORIE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
560 S. YONGE ST. ORMOND BEACH, FL 32174 |
CBC036417 (Exp: 08/31/2026) | (386)673-4589 | (386)673-8045 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/12/2019 | FINAL APPROVED | WMILLER |
| ROW - FINAL APRON (AFTER POUR) | 04/12/2019 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 04/12/2019 | FINAL APPROVED | RGROSS |
| Note: BEES IN THE DOC BOX. COULD NOT SIGN PERMIT. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/11/2019 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 04/10/2019 | APPROVED | JHINDMAN |
| ROW- PAVER RESTRAINTS | 02/01/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 01/28/2019 | APPROVED | RGROSS |
| Note: READY FOR PAVERS | |||
| ELECTRIC - EARLY POWER | 01/17/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:20 | |||
| GRAVITY SEWER TEST | 01/15/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 01/15/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 11/28/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| INSULATION | 11/16/2018 | APPROVED - AS NOTED | WMILLER |
| Note: PLACE OUTLET BOX AT LOW VOLTAGE CONSOLE BEFORE GOING FORWARD | |||
| ELECTRIC-TUG | 11/15/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED TUG 3:50 | |||
| ALL ROUGH | 11/13/2018 | APPROVED | WMILLER |
| Note: approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/09/2018 | APPROVED | WMILLER |
| Note: APPROVED (TB01 REVISION ON SITE) | |||
| ROOF VALLEY & METAL | 11/09/2018 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION APPROVED | |||
| ROOF VALLEY & METAL | 10/31/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. 2. UNDERLAYMENT AND OR FASTENERS AS REQUIRED, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) (FASTENED WITH TWO STAGGERED ROWS IN THE FIELD WITH A MAXIMUM FASTENER SPACING OF 12 inches, AND ONE ROW AT THE OVERLAPS FASTENED 6 inches OC, LAPS OFFSET BY 6 feet, AND WITH THE MANUFACTURER SPECS) | |||
| ROOF SHEATHING | 10/23/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF SHEATHING | 10/17/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: MANY LOOSE SHEETS (CHECK ALL) | |||
| TIE BEAM / LINTEL | 10/01/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 09/28/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: CANCELLED PER JEFF | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/20/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 09/06/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/04/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/04/2019 | 04/10/2019 |
| Note: Released By: JHINDMAN Final S | |||
| BLD | COMPLETE | 03/27/2019 | 04/03/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 03/27/2019 | 03/27/2019 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 02/25/2019 | 03/01/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 02/25/2019 | 02/25/2019 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 10/30/2018 | 11/05/2018 |
| Note: Released By: RLEE | |||
| BLD | COMPLETE | 10/22/2018 | 10/29/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/19/2018 | 09/20/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 08/03/2018 | 08/06/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 08/03/2018 | 08/06/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 08/03/2018 | 08/06/2018 |
| Note: Released By: DREWIS | |||
| PLUM | COMPLETE | 08/03/2018 | 08/08/2018 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 07/27/2018 | 07/31/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 07/27/2018 | 07/31/2018 |
| Note: Held By: DREWIS Provide the following: Signed and sealed plans by the designing engineer or the signature and licence number of the designing electrical contractor, FBC 6ht ed 107.1 Load calculation, NEC 2014 220. Disconnect for the AHU, 440.14. GFCI for both guest bathroom counter tops, 210.52D. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 07/27/2018 | 07/31/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 07/27/2018 | 07/31/2018 |
| Note: Released By: FREODICA | |||
| PLUM | HOLD | 07/27/2018 | 07/31/2018 |
| Note: Held By: FREODICA Tub at master bathroom is shown on sanitary riser diagram but not on floor plan. Coordinate per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| SW1 | HOLD | 07/27/2018 | 07/31/2018 |
| Note: Held By: DREWIS Provide proposed elevations for grades 10' away from the foundation wall, FBC 6th ed R401.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 07/27/2018 | 08/01/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 07/27/2018 | 07/30/2018 |
| Note: Held By: AMOBLEY Flood maps were updated 6/6/18. Surveys must have the new information |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 04/12/2019 |
| REINSPECTION FEE | ¤40.00 | 04/12/2019 |
| REINSPECTION FEE | ¤40.00 | 04/12/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤700.00 | 08/10/2018 |
| SITE PLAN 20 | ¤20.00 | 08/10/2018 |
| SURCHARGE FS 533.721 | ¤16.90 | 08/10/2018 |
| SURCHARGE - FS 468.631 | ¤25.35 | 08/10/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/10/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 08/10/2018 |
| ADMIN FEE | ¤20.00 | 08/10/2018 |
| ELECTRIC FEE | ¤270.00 | 08/10/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 08/10/2018 |
| IMPACT FEE FIRE | ¤218.79 | 08/10/2018 |
| IMPACT FEE PARKS | ¤849.24 | 08/10/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/10/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 08/10/2018 |
| MECHANICAL FEE | ¤270.00 | 08/10/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/10/2018 |
| PLAN CHECK FEE | ¤140.00 | 08/10/2018 |
| PLUMBING FEE | ¤270.00 | 08/10/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,459.81 |