I want to search for...
Permit #2018071174
Permit Details
Status: FINAL
| Parcel Id: 33-11-31-3061-00060-0020 |
| Total Square Footage: 2777 sqft |
| Block: 00060 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: (386)304-2600 |
| Location Address: 48 NEW WATER OAK DR |
| Type: GEN - GENERATOR |
| Issue Date: 01/15/2019 |
| NOC: Unknown |
| Applicant name: GERALD EDWARD MASTERS JR |
| Owner: LO HECTOR G |
|
Address 48 NEW WATER OAK DRIVE PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤1,700.00 |
| Job Description: Electrical Installation of Generator and Transfer Switch |
| Type: CN |
Contractor
MASTERS ELECTRIC INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC FINAL | 01/28/2019 | FINAL APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION PER crystal | |||
| ELECTRIC FINAL | 01/22/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: SPOKE WITH HOMEOWNER VIA RING DOOR BELL HE IS OUT OF TOWN, NEED CONTRACTOR ON SITE TO OPEN TRANSFERSWITCH AND ELECTRIC PANEL ALSO TO START GENERATOR ON LOAD |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 09/28/2018 | 09/28/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 09/28/2018 | 10/02/2018 |
| Note: Released By: DREWIS | |||
| PLUM | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 08/14/2018 | 08/14/2018 |
| Note: Held By: AMOBLEY Need the setbacks and dimensions written on the survey. That is what zoning will review and put the approval stamp on | |||
| ELEC | HOLD | 08/14/2018 | 08/15/2018 |
| Note: Held By: DREWIS Released By: DREWIS Repeat Aug. 9th comment. Daniel Rewis 986-4736 | |||
| PLUM | HOLD | 08/14/2018 | 08/15/2018 |
| Note: Held By: FREODICA Repeat comment: Provide gas contractor per FS 489, gas riser diagram with signature and license number of gas contractor or a separate gas permit per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| ZON | HOLD | 08/08/2018 | 08/08/2018 |
| Note: Held By: AMOBLEY Please show the setback from generator pad to property line on site plan | |||
| ELEC | HOLD | 08/08/2018 | 08/09/2018 |
| Note: Held By: DREWIS Need gas subcontractor or seperate gas permit. Daniel Rewis 986-4736 | |||
| PLUM | HOLD | 08/08/2018 | 08/10/2018 |
| Note: Held By: FREODICA Repeat comment: Provide gas contractor per FS 489, gas riser diagram with signature and license number of gas contractor or a separate gas permit per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| ELEC | HOLD | 07/30/2018 | 08/01/2018 |
| Note: Held By: DREWIS Provide a gas subcontractor or have a gas contractor open a sepreate permit. Provide a complete riser diagram for this installation. Daniel Rewis 986-4736 | |||
| PLUM | HOLD | 07/30/2018 | 08/01/2018 |
| Note: Held By: FREODICA Provide gas contractor per FS 489, gas riser diagram with signature and license number of gas contractor or a separate gas permit per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| ZON | HOLD | 07/30/2018 | 07/31/2018 |
| Note: Held By: AMOBLEY Please show the setback from generator pad to property line on site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/23/2019 |
| SITE PLAN 20 | ¤20.00 | 01/15/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/15/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/15/2019 |
| ADMIN FEE | ¤20.00 | 01/15/2019 |
| ELECTRIC FEE | ¤61.02 | 01/15/2019 |
| PLAN REVIEW 25 | ¤25.00 | 01/15/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤170.02 |