Permit #2018080091
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00050-0290 |
| CONDITIONED SPACE: 2274 sqft |
| GARAGE: 557 sqft |
| OPENED PORCH (WITH ROOF) : 85 sqft |
| OPENED PORCH (WITH ROOF) : 351 sqft |
| Total Square Footage: 3267 sqft |
| Block: 00050 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 7 NEW OAK LEAF DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/22/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤275,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/24/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 04/23/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: missing cover plate in bedroom smoke alarm not working in bed room broken window. | |||
| U-CROSS CONNECTION | 04/22/2019 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 04/22/2019 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 04/22/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 04/22/2019 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 04/18/2019 | APPROVED | RLEE |
| ELECTRIC - EARLY POWER | 04/17/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO FPL RELEASED POWER 3:50 | |||
| ELECTRIC - EARLY POWER | 04/15/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL OUTLET AND SWITCH PLATES ARE OFF, NEED TO BE ON FOR INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 03/29/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2019 | CANCELLED BY APPLICANT | KHOWELL |
| ELECTRIC-TUG | 03/27/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 2:50 | |||
| ELECTRIC-TUG | 03/26/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: GROUNDING ELECTRODE SHALL NOT BE CLOSER THAN 6FT NEC 250.53 3 | |||
| ROW- PAVER RESTRAINTS | 03/22/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: REDIG THE FOOTERS AT THE GARAGE TO WHAT THE SITE PLAN SHOWS 18' DUG AT 16' AT TIME OF INSPECTION, SPOKE TO MASON HE SAID THEY WILL FIX AND SEND ME A PICTURE | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2019 | PARTIALLY APPROVED | KHOWELL |
| Note: SIDEWALK AND APRON POUR PAVER UPPER | |||
| U - SEWER TIE IN | 03/04/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: VIDEO SENT BY PLUMBER OF U-TIE IN | |||
| GRAVITY SEWER TEST | 03/04/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 02/26/2019 | APPROVED | MWILLIAMS |
| INSULATION | 02/19/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 02/14/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/14/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 02/14/2019 | APPROVED | MWILLIAMS |
| PROJECT STATUS (OFFICE USE) | 02/14/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: On this date I have inspected the prior corner damage of the main structure of the home. (Left elevation front corner) It has been repaired by replacing the damged block areas with new steel reinforcing per engineered spec. This home has passed all required inspections to date and has been released to proceed with construction. | |||
| DOWN CELL | 02/14/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 01/15/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: This inspection can not be completed at this time. Braces ties and down cell was failed yesterday and notes entered that no further inspections will take place until the structual issues are addressed on the front corner of the home. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/14/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: The front wall damage of the home needs to be repaired per direction and approval of plans by a third party engineer and the Building Dept. No Further inspections will be allowed until this issue has been addressed. | |||
| PROJECT STATUS (OFFICE USE) | 01/11/2019 | Disapproved - NO FEE | JHINDMAN |
| Note: 1. Based on field visit on 1/11 at 3 pm the left front and left side cmu walls were damaged. Provide a 3rd party Engineers report status on the damage and stating how to replace and repair the damaged cmu block. | |||
| ROOF SHEATHING | 01/02/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 12/21/2018 | APPROVED - AS NOTED | MWILLIAMS |
| Note: This inspection was completed by me yesterday while doing other inspections. I was asked by Mason the superintendent to look at this because they missed calling it in. I reviewed the palns and everything was in order. | |||
| MONOLITHIC SLAB | 12/12/2018 | APPROVED | MWILLIAMS |
| MONOLITHIC SLAB | 11/27/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: FOUNDATION STEMWALLS MUST BE GROUTED SOLID AND FREE OF DEBRIS AND DIRT. REBAR MUST BE INSIDE CELLS AS MARKED ON PLANS AND PER CODE STEMWALL CONSTRUCTION DOES NOT COMPLY WITH ENGINERING,CODE,CONSTRUCTION DOCUMENTS,ACI 318 VERTICLE REINFORCEMENT DOES NOT COMPLY WITH PLANS OR BUILDING CODE FOR HOOKS, EMBEDMENT, AND ANCHORAGE ALL CUT OFF REBAR TO COMPLY WITH FBC FOR MINIMUM CLEARANCE NEED TO USE PROPER BLOCKS AS INDICATED IN PLANS | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/20/2018 | APPROVED | DREWIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/19/2018 | APPROVED | JGIBSON |
| FOOTER | 10/30/2018 | APPROVED | WMILLER |
| Note: approved | |||
| FOOTER | 10/29/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: cancelled per Josh | |||
| FOOTER | 10/25/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) (CHECK ALL) |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/12/2019 | 04/18/2019 |
| Note: Released By: RLEE final | |||
| BLD | COMPLETE | 01/25/2019 | 01/31/2019 |
| Note: Released By: RLEE | |||
| BLD | COMPLETE | 11/30/2018 | 12/07/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 11/19/2018 | 11/20/2018 |
| Note: Released By: DREWIS Foundation S | |||
| ZON | COMPLETE | 08/22/2018 | 08/22/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 08/15/2018 | 08/16/2018 |
| Note: Released By: DREWIS | |||
| ZON | HOLD | 08/15/2018 | 08/16/2018 |
| Note: Held By: TAWILLIAMS Repeat comment: Please specify the specific type of magnolias being used on landscape plan | |||
| PLUM | COMPLETE | 08/15/2018 | 08/16/2018 |
| Note: Released By: FREODICA | |||
| MECH | COMPLETE | 08/15/2018 | 08/16/2018 |
| Note: Released By: FREODICA | |||
| URB | COMPLETE | 08/06/2018 | 08/07/2018 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 08/02/2018 | 08/03/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 08/02/2018 | 08/06/2018 |
| Note: Held By: DREWIS Receptacles needed in both rear right side bedrooms between the door and closet, NEC 2014 210.52. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 08/02/2018 | 08/09/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 08/02/2018 | 08/08/2018 |
| Note: Held By: FREODICA Provide the reference design location either St.Augustine, FL or Daytona Beach, FL on energy/sizing calculations per FBC 6th ed. R301. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 08/02/2018 | 08/08/2018 |
| Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 08/02/2018 | 08/06/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 08/02/2018 | 08/07/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 08/02/2018 | 08/06/2018 |
| Note: Held By: AMOBLEY Please specify the specific type of magnolias being used on landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/19/2019 |
| REINSPECTION FEE | ¤40.00 | 04/19/2019 |
| REINSPECTION FEE | ¤40.00 | 04/19/2019 |
| REVISION | ¤40.00 | 04/19/2019 |
| REINSPECTION FEE | ¤40.00 | 10/25/2018 |
| SITE PLAN 20 | ¤20.00 | 08/22/2018 |
| SURCHARGE FS 533.721 | ¤14.51 | 08/22/2018 |
| SURCHARGE - FS 468.631 | ¤21.76 | 08/22/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/22/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 08/22/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 08/22/2018 |
| ADMIN FEE | ¤20.00 | 08/22/2018 |
| ELECTRIC FEE | ¤235.80 | 08/22/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 08/22/2018 |
| IMPACT FEE FIRE | ¤218.79 | 08/22/2018 |
| IMPACT FEE PARKS | ¤849.24 | 08/22/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/22/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 08/22/2018 |
| MECHANICAL FEE | ¤235.80 | 08/22/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/22/2018 |
| PLAN CHECK FEE | ¤117.20 | 08/22/2018 |
| PLUMBING FEE | ¤235.80 | 08/22/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,294.43 |