Permit #2018080091

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00050-0290
CONDITIONED SPACE: 2274 sqft
GARAGE: 557 sqft
OPENED PORCH (WITH ROOF) : 85 sqft
OPENED PORCH (WITH ROOF) : 351 sqft
Total Square Footage: 3267 sqft
Block: 00050
Subdivision: 2108 - Hidden Lakes- Phase II-Toscana
Job Phone: 863-420-2100
Location Address: 7 NEW OAK LEAF DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/22/2018
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0290
Contracted Stated Job Value: ¤275,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/24/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 04/23/2019 Disapproved - NO FEE MWILLIAMS
Note: missing cover plate in bedroom smoke alarm not working in bed room broken window.
U-CROSS CONNECTION 04/22/2019 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 04/22/2019 APPROVED KHOWELL
ROW - FINAL INSPECTION 04/22/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 04/22/2019 FINAL APPROVED LFITZGERALD
FINAL SURVEY (OFFICE USE ONLY) 04/18/2019 APPROVED RLEE
ELECTRIC - EARLY POWER 04/17/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO FPL RELEASED POWER 3:50
ELECTRIC - EARLY POWER 04/15/2019 Disapproved -FEE REQUIRED RMARTIN
Note: ALL OUTLET AND SWITCH PLATES ARE OFF, NEED TO BE ON FOR INSPECTION
ROW- PRE-APRON (PRE-POUR) 03/29/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW- PRE-APRON (PRE-POUR) 03/28/2019 CANCELLED BY APPLICANT KHOWELL
ELECTRIC-TUG 03/27/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 2:50
ELECTRIC-TUG 03/26/2019 Disapproved -FEE REQUIRED RMARTIN
Note: GROUNDING ELECTRODE SHALL NOT BE CLOSER THAN 6FT NEC 250.53 3
ROW- PAVER RESTRAINTS 03/22/2019 APPROVED - AS NOTED KHOWELL
Note: REDIG THE FOOTERS AT THE GARAGE TO WHAT THE SITE PLAN SHOWS 18' DUG AT 16' AT TIME OF INSPECTION, SPOKE TO MASON HE SAID THEY WILL FIX AND SEND ME A PICTURE
ROW- PRE-APRON (PRE-POUR) 03/22/2019 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON POUR PAVER UPPER
U - SEWER TIE IN 03/04/2019 APPROVED - AS NOTED JGIBSON
Note: VIDEO SENT BY PLUMBER OF U-TIE IN
GRAVITY SEWER TEST 03/04/2019 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 02/26/2019 APPROVED MWILLIAMS
INSULATION 02/19/2019 APPROVED MWILLIAMS
ALL ROUGH 02/14/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/14/2019 APPROVED MWILLIAMS
ROOF VALLEY & METAL 02/14/2019 APPROVED MWILLIAMS
PROJECT STATUS (OFFICE USE) 02/14/2019 APPROVED - AS NOTED MWILLIAMS
Note: On this date I have inspected the prior corner damage of the main structure of the home. (Left elevation front corner) It has been repaired by replacing the damged block areas with new steel reinforcing per engineered spec. This home has passed all required inspections to date and has been released to proceed with construction.
DOWN CELL 02/14/2019 APPROVED MWILLIAMS
ROOF VALLEY & METAL 01/15/2019 Disapproved - NO FEE MWILLIAMS
Note: This inspection can not be completed at this time. Braces ties and down cell was failed yesterday and notes entered that no further inspections will take place until the structual issues are addressed on the front corner of the home.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/14/2019 Disapproved - NO FEE MWILLIAMS
Note: The front wall damage of the home needs to be repaired per direction and approval of plans by a third party engineer and the Building Dept. No Further inspections will be allowed until this issue has been addressed.
PROJECT STATUS (OFFICE USE) 01/11/2019 Disapproved - NO FEE JHINDMAN
Note: 1. Based on field visit on 1/11 at 3 pm the left front and left side cmu walls were damaged. Provide a 3rd party Engineers report status on the damage and stating how to replace and repair the damaged cmu block.
ROOF SHEATHING 01/02/2019 APPROVED MWILLIAMS
TIE BEAM / LINTEL 12/21/2018 APPROVED - AS NOTED MWILLIAMS
Note: This inspection was completed by me yesterday while doing other inspections. I was asked by Mason the superintendent to look at this because they missed calling it in. I reviewed the palns and everything was in order.
MONOLITHIC SLAB 12/12/2018 APPROVED MWILLIAMS
MONOLITHIC SLAB 11/27/2018 Disapproved -FEE REQUIRED WMILLER
Note: FOUNDATION STEMWALLS MUST BE GROUTED SOLID AND FREE OF DEBRIS AND DIRT. REBAR MUST BE INSIDE CELLS AS MARKED ON PLANS AND PER CODE STEMWALL CONSTRUCTION DOES NOT COMPLY WITH ENGINERING,CODE,CONSTRUCTION DOCUMENTS,ACI 318 VERTICLE REINFORCEMENT DOES NOT COMPLY WITH PLANS OR BUILDING CODE FOR HOOKS, EMBEDMENT, AND ANCHORAGE ALL CUT OFF REBAR TO COMPLY WITH FBC FOR MINIMUM CLEARANCE NEED TO USE PROPER BLOCKS AS INDICATED IN PLANS
FOUND SURVEY APPROVED (OFFICE) 11/20/2018 APPROVED DREWIS
PLUMBING 1ST ROUGH UNDERGROUND 11/19/2018 APPROVED JGIBSON
FOOTER 10/30/2018 APPROVED WMILLER
Note: approved
FOOTER 10/29/2018 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Josh
FOOTER 10/25/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) (CHECK ALL)

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/12/2019 04/18/2019
Note: Released By: RLEE final
BLD COMPLETE 01/25/2019 01/31/2019
Note: Released By: RLEE
BLD COMPLETE 11/30/2018 12/07/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 11/19/2018 11/20/2018
Note: Released By: DREWIS Foundation S
ZON COMPLETE 08/22/2018 08/22/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 08/15/2018 08/16/2018
Note: Released By: DREWIS
ZON HOLD 08/15/2018 08/16/2018
Note: Held By: TAWILLIAMS Repeat comment: Please specify the specific type of magnolias being used on landscape plan
PLUM COMPLETE 08/15/2018 08/16/2018
Note: Released By: FREODICA
MECH COMPLETE 08/15/2018 08/16/2018
Note: Released By: FREODICA
URB COMPLETE 08/06/2018 08/07/2018
Note: Released By: JBEAUDET
BLD COMPLETE 08/02/2018 08/03/2018
Note: Released By: JHINDMAN
ELEC HOLD 08/02/2018 08/06/2018
Note: Held By: DREWIS Receptacles needed in both rear right side bedrooms between the door and closet, NEC 2014 210.52. Daniel Rewis 986-4736
ENGIN1 COMPLETE 08/02/2018 08/09/2018
Note: Released By: TBAKER
MECH HOLD 08/02/2018 08/08/2018
Note: Held By: FREODICA Provide the reference design location either St.Augustine, FL or Daytona Beach, FL on energy/sizing calculations per FBC 6th ed. R301. F.Reodica -386-986-4734.
PLUM HOLD 08/02/2018 08/08/2018
Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
SW1 COMPLETE 08/02/2018 08/06/2018
Note: Released By: DREWIS
UD1 COMPLETE 08/02/2018 08/07/2018
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON HOLD 08/02/2018 08/06/2018
Note: Held By: AMOBLEY Please specify the specific type of magnolias being used on landscape plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/19/2019
REINSPECTION FEE ¤40.00 04/19/2019
REINSPECTION FEE ¤40.00 04/19/2019
REVISION ¤40.00 04/19/2019
REINSPECTION FEE ¤40.00 10/25/2018
SITE PLAN 20 ¤20.00 08/22/2018
SURCHARGE FS 533.721 ¤14.51 08/22/2018
SURCHARGE - FS 468.631 ¤21.76 08/22/2018
STORM WATER PERMIT FEES ¤80.00 08/22/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 08/22/2018
NEW RESIDENTIAL INSPECTIONS ¤586.00 08/22/2018
ADMIN FEE ¤20.00 08/22/2018
ELECTRIC FEE ¤235.80 08/22/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 08/22/2018
IMPACT FEE FIRE ¤218.79 08/22/2018
IMPACT FEE PARKS ¤849.24 08/22/2018
IMPACT FEE SCHOOL ¤3,600.00 08/22/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 08/22/2018
MECHANICAL FEE ¤235.80 08/22/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/22/2018
PLAN CHECK FEE ¤117.20 08/22/2018
PLUMBING FEE ¤235.80 08/22/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,294.43