I want to search for...

Permit #2018080324

Permit Details

Status: CANCEL

Parcel Id: 07-11-31-7027-00340-0230
Block: 00340
Subdivision: 2128 - SECTION 27-WYNNFIELD
Job Phone: 386-227-2646
Location Address: 14 WOODFAIR LN
Type: DR - DRIVEWAY
Issue Date: 08/16/2018
NOC: Unknown
Applicant name: JUAN P BARTOLOME HERNANDEZ
Owner: CARAFFINI RAUL J

Address

14 WOODFAIR LANE

PALM COAST, FL 32164

Lot: 0230
Contracted Stated Job Value: ¤1,000.00
Job Description: REPLACE DRIVEWAY CONCRETE
Type: CN

Contractor

A TOUCH OF SPAIN INC
Status Location Address Phone
INACTIVE

74 SEVEN WONDERS TRAIL

,

386-227-2646

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/17/2019 01/24/2019
Note: Released By: TBAKER
SW1 COMPLETE 01/17/2019 01/18/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 01/17/2019 01/18/2019
Note: Released By: MBACON All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear.
ZON COMPLETE 01/17/2019 01/17/2019
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 08/09/2018 08/09/2018
Note: Released By: TBAKER No work in right of way
SW1 COMPLETE 08/09/2018 08/09/2018
Note: Released By: DREWIS
UD1 COMPLETE 08/09/2018 08/16/2018
Note: Released By: MBACON All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear.
ZON COMPLETE 08/09/2018 08/09/2018
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 08/16/2018
SITE PLAN 20 ¤20.00 08/16/2018
SURCHARGE FS 533.721 ¤2.00 08/16/2018
SURCHARGE - FS 468.631 ¤2.00 08/16/2018
STORM WATER PERMIT FEES ¤40.00 08/16/2018
Fees Total Due: ¤0.00 Total Paid: ¤84.00