I want to search for...

Permit #2018080510

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00010-0090
CONDITIONED SPACE: 2443 sqft
CONDITIONED SPACE: 269 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 442 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
Total Square Footage: 4009 sqft
Block: 00010
Subdivision: 2108 - Hidden Lakes- Phase II-Toscana
Job Phone: 863-420-2100
Location Address: 17 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/12/2018
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0090
Contracted Stated Job Value: ¤275,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/19/2019 APPROVED MWILLIAMS
U-CROSS CONNECTION 07/19/2019 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 07/19/2019 APPROVED KHOWELL
ROW - STORMWATER FINAL 07/19/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 07/19/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 07/18/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 07/18/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 07/17/2019 Disapproved - NO FEE KHOWELL
Note: SEE NOTES ON SURVEY MARK UP
ROW- PRE-APRON (PRE-POUR) 06/21/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 06/18/2019 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 06/18/2019 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON POUR PAVER UPPER DRIVEWAY
GRAVITY SEWER TEST 06/14/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 06/13/2019 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 06/12/2019 Disapproved -FEE REQUIRED JGIBSON
Note: concealment uncover all of sanitary sewer for inspection
U - SEWER TIE IN 06/12/2019 APPROVED - AS NOTED JGIBSON
Note: U-SEWER TIE IN WAS DONE BY UTILITIES
ELECTRIC - EARLY POWER 06/11/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
ELECTRIC - EARLY POWER 06/07/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION deficiencies noted at prior inspection resolved however due to tile work several switch and outlet covers need to be replaced prior to early power. CHECK ALL OUTLETS in tile areas..NEC 314.20 also due to tile work arc shields needed at tile areas CHECK ALL OUTLETS in tile areas..NEC 314.20
ELECTRIC - EARLY POWER 05/22/2019 Disapproved -FEE REQUIRED RMARTIN
Note: NEED TO SAFE OFF MICROWAVE CONDUCTORS
TIE BEAM / LINTEL 05/14/2019 APPROVED MWILLIAMS
LATH/BRICK/ WATER BARRIER 04/17/2019 APPROVED MWILLIAMS
INSULATION 03/27/2019 APPROVED MWILLIAMS
ALL ROUGH 03/21/2019 APPROVED - AS NOTED MWILLIAMS
Note: missing plumbing pressure test on waterlines and no 5' head pressure. Will check on insulation.
GAS ROUGH 03/21/2019 APPROVED - AS NOTED JGIBSON
Note: NEED BOND WIRE RAN BY GAS FINAL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/01/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: missing tie downs on header at front entry. Also sheathing covering headers at front entry. Previously explained that sheathing needs to be left off for inspection.
ROOF VALLEY & METAL 03/01/2019 APPROVED MWILLIAMS
ELECTRIC-TUG 02/19/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG 3:00
ROOF SHEATHING 02/14/2019 APPROVED - AS NOTED DROCKWELL
Note: Provide solid blocking where ply clips are missing.See garage hip area master bedroom area
TIE BEAM / LINTEL 01/28/2019 APPROVED MWILLIAMS
MONOLITHIC SLAB 01/11/2019 APPROVED WMILLER
Note: APPROVED
MONOLITHIC SLAB 12/10/2018 Disapproved -FEE REQUIRED WMILLER
Note: ADDED VERTICLEROOD AT LOCATION HIGHLIGHTED ON APPROVED PLANS SHOWS AN 8 INCH FOOTING. REPAIR SAYS TO DRILL AND EPOXY 6 INCHES DEEP. THIS DOES NOT ALLOW MINIMUM COVERAGE FOR REINFORCEMENT. (CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4) REPAIR NEEDS TO HAVE A REVISION FROM ENGINEER ON HOW TO MAKE CORRECTION
MONOLITHIC SLAB 12/06/2018 CANCELLED BY APPLICANT MWILLIAMS
MONOLITHIC SLAB 12/04/2018 CANCELLED BY APPLICANT WMILLER
Note: CANCELLED PER JOSH
MONOLITHIC SLAB 12/03/2018 Disapproved -FEE REQUIRED WMILLER
Note: FOUNDATION STEMWALLS MUST BE GROUTED SOLID AND FREE OF DEBRIS AND DIRT. REBAR MUST BE INSIDE CELLS AS MARKED ON PLANS AND PER CODE (NEED TO CUT OFF AND REMOVE VERTICLE REINFORCEMENT THAT IS OUT SIDE OF WALLS AND COLLUMNS THEN COVER WITH AT LEAST 3 INCHES AT AS PER CODE) MISSING VIERTICLE REINFORCEMENT ( CIRCLED ON PLANS ON SITE NOTE (PLANS ON SITE SHOW RECIEVED BY COPC BUT DO NOT SHOW APPROVAL) (NEED APPROVED PLANS ON SITE)
PLUMBING 1ST ROUGH UNDERGROUND 11/27/2018 APPROVED JGIBSON
FOUND SURVEY APPROVED (OFFICE) 11/20/2018 APPROVED DREWIS
FOOTER 10/31/2018 APPROVED DROCKWELL
FOOTER 10/30/2018 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Josh

Review History

Department Status Date In Date Out
PLUM COMPLETE 03/20/2019 03/27/2019
Note: Released By: JHINDMAN
BLD COMPLETE 01/25/2019 01/31/2019
Note: Released By: JHINDMAN
BLD COMPLETE 01/03/2019 01/10/2019
Note: Released By: JHINDMAN
BLD HOLD 12/17/2018 12/21/2018
Note: Held By: JHINDMAN 1. Provide a complete digitally signed ans sealed plan that identifies the missing dowels and how to replace them. 6th ed. FBC 107.1 107.3.5 and 6th ed. FBC R404. J. Hindman 986-3784.
SW1 COMPLETE 11/19/2018 11/20/2018
Note: Released By: DREWIS
MECH COMPLETE 08/22/2018 08/27/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 08/22/2018 08/27/2018
Note: Released By: JHINDMAN
BLD COMPLETE 08/14/2018 08/15/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 08/14/2018 08/15/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 08/14/2018 08/14/2018
Note: Released By: TBAKER
MECH HOLD 08/14/2018 08/14/2018
Note: Held By: FREODICA Provide complete information (address of new home) on energy performance level (EPL) display card per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
PLUM HOLD 08/14/2018 08/14/2018
Note: Held By: FREODICA Sanitary riser diagram does not match with floor plan. Coordinate per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
SW1 COMPLETE 08/14/2018 08/15/2018
Note: Released By: DREWIS
UD1 COMPLETE 08/14/2018 08/20/2018
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 08/14/2018 08/14/2018
Note: Released By: AMOBLEY
URB COMPLETE 08/14/2018 08/15/2018
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
NEW RESIDENTIAL INSPECTIONS ¤708.00 09/12/2018
SITE PLAN 20 ¤20.00 09/12/2018
SURCHARGE FS 533.721 ¤17.07 09/12/2018
SURCHARGE - FS 468.631 ¤25.60 09/12/2018
STORM WATER PERMIT FEES ¤80.00 09/12/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 09/12/2018
ADMIN FEE ¤20.00 09/12/2018
ELECTRIC FEE ¤272.40 09/12/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 09/12/2018
IMPACT FEE FIRE ¤218.79 09/12/2018
IMPACT FEE PARKS ¤849.24 09/12/2018
IMPACT FEE SCHOOL ¤3,600.00 09/12/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 09/12/2018
MECHANICAL FEE ¤272.40 09/12/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/12/2018
PLAN CHECK FEE ¤141.60 09/12/2018
PLUMBING FEE ¤272.40 09/12/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,597.03