I want to search for...

Permit #2018080531

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00020-0040
CONDITIONED SPACE: 2614 sqft
GARAGE: 556 sqft
OPENED PORCH (WITH ROOF) : 153 sqft
OPENED PORCH (WITH ROOF) : 71 sqft
Total Square Footage: 3394 sqft
Block: 00020
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 16 NEW WATER OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/12/2018
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0040
Contracted Stated Job Value: ¤235,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/01/2019 APPROVED MWILLIAMS
U-CROSS CONNECTION 07/01/2019 APPROVED MBACON
ROW - FINAL APRON (AFTER POUR) 07/01/2019 APPROVED KHOWELL
ROW - STORMWATER FINAL 07/01/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 07/01/2019 FINAL APPROVED MBACON
ROW FIELD SURVEY /GRADING CERTIFICATION 06/28/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 06/28/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 06/27/2019 Disapproved - NO FEE KHOWELL
Note: SEE NOTES ON SURVEY MARK UP
ROW- PRE-APRON (PRE-POUR) 06/19/2019 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. BASE NEEDS GOOD COMPACTION BEFORE PAVERS ARE PLACED.
ELECTRIC - EARLY POWER 06/14/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 3:15
ROW- PRE-APRON (PRE-POUR) 06/13/2019 Disapproved -FEE REQUIRED KHOWELL
Note: COULD NOT FIND SITE PLAN, IT NEEDS TO BE PINNED IN DOC BOX. REMOVE WASP NEST FROM DOC BOX
ROW- PRE-APRON (PRE-POUR) 06/13/2019 PARTIALLY APPROVED KHOWELL
Note: THIS IS A REINSPECTION SIDEWALK AND APRON POUR PAVER UPPER
ROW- PAVER RESTRAINTS 06/13/2019 Disapproved - NO FEE KHOWELL
Note: WASHED IN AND DO NOT LOOK DEEP ENOUGH
ROW- PAVER RESTRAINTS 06/13/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 06/06/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 06/06/2019 APPROVED JGIBSON
ELECTRIC - EARLY POWER 05/13/2019 Disapproved -FEE REQUIRED RMARTIN
Note: WALL OVEN,MICRO,COOK TOP NOT SAFED OFF NEEDS TO BE CAPPED OFF AND IN A BOX WITH PLATE
LATH/BRICK/ WATER BARRIER 04/15/2019 APPROVED DROCKWELL
INSULATION 03/20/2019 APPROVED MWILLIAMS
ALL ROUGH 03/08/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/06/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/05/2019 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Josh
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/01/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: As previously noted front entry posts are covered and can not be seen with an extension ladder, Remove sheathing or provide an extension ladder tied offf to reach inspection port holes. THIS IS AN ONGOING ISSUE AND IT NEEDS TO BE CORRECTED> MUST LEAVE SHEATHING OFF AT TIE DOWN AREAS FOR INSPETION DO NOT COVER CRITICAL POINTS OF CONNECTION PRIOR TO INSPECTION>
ALL ROUGH 02/27/2019 Disapproved - NO FEE MWILLIAMS
Note: framing still in progress not ready for inspection sheathing braces and ties should be completed prior to this inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/27/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: framing beyond point of inspection front entry posts are covered up cant see tie downs this inspection should be called in prior to all rough
ROOF VALLEY & METAL 02/27/2019 APPROVED MWILLIAMS
ELECTRIC-TUG 02/21/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:30
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/12/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. X-BRACES CANNOT EXCEED 20' FROM HIP GIRDER TO CENTER OF X-BRACING PER DETAIL (TB05), 2. MISSING DTT2Z HIGHLIGHTED ON PLANS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/12/2019 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION WRONG INFO RESULTED PRIOR TO THIS RESULT DUE TO SYSTEM GLITCH FEE WILL NOT BE ADDED TO THE INSPECTION AS FEE WAS ALREADY CHARGED WHEN SYTEM RESULTED INCORRECTLY (FEE WAS CHARGED ON PRIOR INSPECTION) 1. CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH 2. STRAPS MISSING FASTENERS HIGHLIGHTED ON PLANS
ROOF SHEATHING 01/22/2019 APPROVED MWILLIAMS
TIE BEAM / LINTEL 01/03/2019 APPROVED MWILLIAMS
TIE BEAM / LINTEL 12/28/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) (CHECK ALL) 2. MISSING STEEL IN TOP LENTEL (CHECK ALL)
MONOLITHIC SLAB 12/13/2018 APPROVED MWILLIAMS
MONOLITHIC SLAB 12/11/2018 Disapproved -FEE REQUIRED WMILLER
Note: STILL WORKING ON REPAIRS, NOT READY, (MAKE SURE REVISION FOR REPAIRS IS ON SITE FOR INSPECTION), REBAR MUST BE INSIDE CELLS AS MARKED ON PLANS AND PER CODE STEMWALL CONSTRUCTION DOES NOT COMPLY WITH ENGINERING,CODE,CONSTRUCTION DOCUMENTS,ACI 318 VERTICLE REINFORCEMENT DOES NOT COMPLY WITH PLANS OR BUILDING CODE FOR HOOKS, EMBEDMENT, AND ANCHORAGE ALL CUT OFF REBAR TO COMPLY WITH FBC FOR MINIMUM CLEARANCE NEED TO USE PROPER BLOCKS AS INDICATED IN PLANS
MONOLITHIC SLAB 11/27/2018 Disapproved - NO FEE WMILLER
Note: FOUNDATION STEMWALLS MUST BE GROUTED SOLID AND FREE OF DEBRIS AND DIRT. REBAR MUST BE INSIDE CELLS AS MARKED ON PLANS AND PER CODE STEMWALL CONSTRUCTION DOES NOT COMPLY WITH ENGINERING,CODE,CONSTRUCTION DOCUMENTS,ACI 318 VERTICLE REINFORCEMENT DOES NOT COMPLY WITH PLANS OR BUILDING CODE FOR HOOKS, EMBEDMENT, AND ANCHORAGE ALL CUT OFF REBAR TO COMPLY WITH FBC FOR MINIMUM CLEARANCE NEED TO USE PROPER BLOCKS AS INDICATED IN PLANS
MONOLITHIC SLAB 11/26/2018 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Josh
MONOLITHIC SLAB 11/20/2018 Disapproved -FEE REQUIRED WMILLER
Note: FOUNDATION STEMWALLS MUST BE GROUTED SOLID AND FREE OF DEBRIS AND DIRT. REBAR MUST BE INSIDE CELLS AS MARKED ON PLANS AND PER CODE STEMWALL CONSTRUCTION DOES NOT COMPLY WITH ENGINERING,CODE,CONSTRUCTION DOCUMENTS,ACI 318
FOUND SURVEY APPROVED (OFFICE) 11/20/2018 APPROVED DREWIS
PLUMBING 1ST ROUGH UNDERGROUND 11/16/2018 APPROVED JGIBSON
FOOTER 10/31/2018 APPROVED DROCKWELL
FOOTER 10/29/2018 CANCELLED BY APPLICANT WMILLER
Note: cancell per Josh
FOOTER 10/25/2018 Disapproved -FEE REQUIRED WMILLER
Note: 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) (CHECK ALL)

Review History

Department Status Date In Date Out
BLD COMPLETE 01/25/2019 01/31/2019
Note: Released By: JHINDMAN
BLD COMPLETE 11/30/2018 12/07/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 11/19/2018 11/20/2018
Note: Released By: DREWIS FOUND S
MECH HOLD 08/30/2018 08/30/2018
Note: Held By: JHINDMAN just a revision form that all was send 1. Coordinate the number of bedrooms on energy calculations and floor plan per FBC 6th ed. 107.1 The Den has closets and is considered a bedroom by code. J. Hindman 986-3784.
MECH COMPLETE 08/30/2018 09/06/2018
Note: Released By: JHINDMAN
ZON COMPLETE 08/23/2018 08/23/2018
Note: Released By: AMOBLEY
SW1 COMPLETE 08/23/2018 08/29/2018
Note: Released By: JHINDMAN
MECH HOLD 08/23/2018 08/29/2018
Note: Held By: JHINDMAN 1. Coordinate the number of bedrooms on energy calculations and floor plan per FBC 6th ed. 107.1 The Den has closets and is considered a bedroom by code.
BLD COMPLETE 08/22/2018 08/22/2018
Note: Released By: JHINDMAN
BLD HOLD 08/15/2018 08/21/2018
Note: Held By: JHINDMAN 1. On page A-3 and A-4 provide a roof underlayment that complies with the 6th ed. FBC R905. J. Hindman 986-3784.
ELEC COMPLETE 08/15/2018 08/16/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 08/15/2018 08/15/2018
Note: Released By: TBAKER
MECH HOLD 08/15/2018 08/21/2018
Note: Held By: FREODICA 1. Coordinate the number of bedrooms on energy calculations and floor plan per FBC 6th ed. 107.1 2. Provide the new home address on enegy performace level (EPL) display card per FBCEC 6th ed. R401.3. 3. Coordinate the design location for climate zone using Daytona Beach, FL as shown on eenrgy calculation and not Orlando, FL as shown on equipment sizing calculation per FBCEC 6th ed. R301. 4. Provide balanced return air from the Den per FBCR 6th ed. M1602.3. F.Reodica -386-986-4734.
PLUM COMPLETE 08/15/2018 08/20/2018
Note: Released By: FREODICA
SW1 HOLD 08/15/2018 08/16/2018
Note: Held By: DREWIS Rear right side elevation of 23.9 allows flow from the adjacent lot, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736
UD1 COMPLETE 08/15/2018 08/22/2018
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 08/15/2018 08/15/2018
Note: Held By: AMOBLEY Landscaping... Must have shrubs wrapping corners and at least 4 shrubs along each interior side
URB COMPLETE 08/15/2018 08/16/2018
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 06/13/2019
REINSPECTION FEE ¤40.00 12/11/2018
REINSPECTION FEE ¤40.00 12/11/2018
ELECTRIC FEE ¤62.04 12/11/2018
REVISION ¤40.00 12/11/2018
REINSPECTION FEE ¤40.00 10/25/2018
SITE PLAN 20 ¤20.00 09/12/2018
SURCHARGE FS 533.721 ¤15.72 09/12/2018
SURCHARGE - FS 468.631 ¤23.59 09/12/2018
STORM WATER PERMIT FEES ¤80.00 09/12/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 09/12/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 09/12/2018
IMPACT FEE FIRE ¤218.79 09/12/2018
IMPACT FEE PARKS ¤849.24 09/12/2018
IMPACT FEE SCHOOL ¤3,600.00 09/12/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 09/12/2018
MECHANICAL FEE ¤253.20 09/12/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 09/12/2018
PLAN CHECK FEE ¤128.80 09/12/2018
PLUMBING FEE ¤253.20 09/12/2018
ADMIN FEE ¤20.00 09/12/2018
ELECTRIC FEE ¤253.20 09/12/2018
NEW RESIDENTIAL INSPECTIONS ¤644.00 09/12/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,681.31