Permit #2018080641
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00440-0200 |
| CONDITIONED SPACE: 2826 sqft |
| CONDITIONED SPACE: 1605 sqft |
| GARAGE: 935 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 78 sqft |
| OPENED PORCH (WITH ROOF) : 606 sqft |
| Total Square Footage: 6194 sqft |
| Block: 00440 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: (386)405-0323 |
| Location Address: 11 LANGDON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/21/2018 |
| NOC: RECORDED |
| Applicant name: SERGE ROMANYSZYN |
| Owner: POWELL LORENZO SR & PATINA TRINECE POWELL H&W |
|
Address 14 LAMONT LANE PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
ROMAN BUILDING CONTRACTORS LLC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
PO BOX 1265 PALM COAST, FL 32137 |
CBC1253753 (Exp: 08/31/2022) | (386)405-0323 |
Sub Contractors
JOSEPH JOHN VERRECHIO
| Status | Location Address | State License Number | Phone |
| CANCEL |
1325 WEST STATE RD. 100 BUNNELL, FL 32110 |
EC13004254 (Exp: 08/31/2024) | 386-447-9644 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
BRIAN BRESKI
| Status | Location Address | State License Number | Phone |
| CANCEL |
4260 NE 35TH ST OCALA, FL 34479 |
20428 (Exp: 08/31/2021) | 352-236-3355 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/11/2019 | FINAL APPROVED | JCOLASANTI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/11/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 10/11/2019 | APPROVED | RGROSS |
| Note: ON SITE WITH BUILDER TO MAKE SMALL ADJUSTMENT TO STORM WATER DRAINAGE NEAR THE FENCE LINE. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/10/2019 | APPROVED - AS NOTED | AHALL |
| Note: provide flush sanitary cleanout caps. | |||
| ROW - STORMWATER FINAL | 10/10/2019 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 10/10/2019 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/09/2019 | Disapproved - NO FEE | MMAJEWSKI |
| Note: DRAINAGE AT REAR OF HOUSE AND BEHIND POOL AREA WILL NOT WORK | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/09/2019 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. SPOKE WITH BUILDER ABOUT BETTER DEFINED GRADE ELEVATIONS ON SURVEY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/08/2019 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION. STILL NEED OUSIDE FOUNDATION ELEVATION TO COMPARE TO THE FINISHED FLOOR ELEVATIONS. SEE FEILD SURVY MARK-UP. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/04/2019 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION. OUTSIDE FOUNDATION ELEVATIONS MUST BE SHOWN TO COMPARE TO THE FINISHED FLOOR ELEVATION. SEE SURVEY MARK-UP IN DOCUMENT ATTACHMENTS. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/03/2019 | CANCELLED BY APPLICANT | STHOMAS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 09/30/2019 | Disapproved - NO FEE | RGROSS |
| Note: SOD NEEDS TO BE PLACED BEFORE FINAL SURVEY. ON SITE WITH SUPER. | |||
| U - SEWER TIE IN | 08/21/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED ON 8/20/18 | |||
| GRAVITY SEWER TEST | 08/20/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS IS A REINSPECTION THIS WAS FOR GRAVITY SEWER AND U- TIE IN CONTRACTOR TO CALL AND SCHEDULE U-TIE INSPECTION PER PHONE CALL TO PLUMBING CONTRACTOR KEHEL PLUMBING | |||
| ELECTRIC - EARLY POWER | 08/12/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION spoke to Susan at FPL to release power | |||
| ROW- PRE-APRON (PRE-POUR) | 08/08/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION. CULVERT OUT OF TOLERANCE. EXACTLY 1 FT TOO HIGH. SEE SWALE PLAN AND RESET CULVERT. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/08/2019 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. THIS CULVERT WAS INSPECTED AND FAILED. HOWEVER, THERE WERE 2 NAILS IN THE SAME POLE. INSPECTOR SET UP OFF THE WRONG BM NUMBER. ON SITE TOWARD THE END OF THE DAY AND SET UP ON THE CORRECT BM. APPROVED AS NOTED. READY TO POUR FEE REMOVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/07/2019 | CANCELLED BY APPLICANT | RGROSS |
| Note: 9:55AM | |||
| PEP TANK INSTALLATION REQUEST | 07/29/2019 | APPROVED | CSTONE |
| Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved. | |||
| INSULATION | 05/29/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 05/22/2019 | APPROVED | JCOLASANTI |
| INSULATION | 05/17/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to use rated fire caulk at all penetrations....energy calcs call for R19 at exterior wood walls, R13 installed need approved revision on site. | |||
| ALL ROUGH | 04/23/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need mastic around exhausts....fireblock all chases FBC 302 | |||
| ALL ROUGH | 04/22/2019 | CANCELLED BY APPLICANT | JCOLASANTI |
| GRAVITY SEWER TEST | 03/22/2019 | Disapproved - NO FEE | JGIBSON |
| Note: wrong inspection called in | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/22/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: Straps above headers on 2nd floor...bolt rear window 1st story....Straps on Girder truss on rear of house left side...Truss revision needs to be approved by city and placed at job site...FBC802 | |||
| ROOF VALLEY & METAL | 02/14/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: Previously have inspected this roof. Had to wait on Manufacturer Specs on front wall flashing to approve this inspection. I recieved the spec sheet and am now approving this inspection based on prior observation/inspection | |||
| ROOF VALLEY & METAL | 02/11/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: Improperly installed roof flashing as described in previous failure report. No correction has been made from prior failure. | |||
| ROOF VALLEY & METAL | 02/08/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. ALL LAPS SHALL BE A MINIMUM OF 4in. FULLY SEALED IN APPROVED FLASHING CEMENTTHE ENTIRE EDGE OF THE HORIZONTAL FLANGE SHALL BE SEALED COVERING ALL NAIL PENITRATIONS WITH APPROVED FLASHING CEMENT AND MEMBRANE. FLASHING SHALL START AT THE LOWER PROTION OF THE ROOF TO ENSURE WATER-SHEDDING CAPABILITIES OF ALL METAL LAPS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/08/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: Framing for openings in second floor does not match approved plans. Must have a revision from design professional approved by the building official. Or build openings to match existing drawings. Missing double cripples and double king studs and not strapped per plan. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/06/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: Framing detail on page D1 need to frame and strap openings as shown on approved plan check all tie downs | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/01/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: not ready for inspection partial list follows missing decking at bottom of hip on left sideand loose sheething on right front of garage and over third window right side missing many straps throughout missing stud packs truss layout not as proposed | |||
| TIE BEAM / LINTEL | 01/04/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC TEMP POLE | 01/04/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:50 | |||
| ELECTRIC TEMP POLE | 01/03/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED TO GROUND POLE NEC 250 | |||
| ELECTRIC - EARLY POWER | 12/28/2018 | Disapproved - NO FEE | RMARTIN |
| Note: THINK WRONG INSPECTION IS CALLED IN, MAYBE TEMP POLE? | |||
| TIE BEAM / LINTEL | 12/18/2018 | Disapproved - NO FEE | JCOLASANTI |
| Note: need revision to show concrete lintel for rear second floor as plans show LVL beam FBC 802 | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/17/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 11/15/2018 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/05/2018 | APPROVED | JCOLASANTI |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/20/2019 | 05/28/2019 |
| Note: Released By: RLEE | |||
| ZON | COMPLETE | 03/21/2019 | 03/21/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 03/21/2019 | 03/25/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/21/2019 | 03/21/2019 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 03/21/2019 | 03/26/2019 |
| Note: Released By: AHALL PEP Panel not shown on electrical plans (Builder Electrical Plan see page 2.) PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| BLD | COMPLETE | 02/25/2019 | 03/01/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 02/14/2019 | 02/21/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 12/21/2018 | 01/03/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 12/13/2018 | 12/17/2018 |
| Note: Released By: DREWIS foundation | |||
| ZON | COMPLETE | 09/20/2018 | 09/21/2018 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 09/17/2018 | 09/17/2018 |
| Note: Held By: AMOBLEY Landscape plan should state if irrigation will be installed and show that AC pad should be screened with 7 gallon shrubs Please put all this information on the landscape plan. We can only stamp one landscape plan. | |||
| MECH | COMPLETE | 09/17/2018 | 09/19/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 09/07/2018 | 09/10/2018 |
| Note: Held By: AMOBLEY Landscape plan should state if irrigation will be installed and show that AC pad should be screened with 7 gallon shrubs | |||
| MECH | HOLD | 09/07/2018 | 09/14/2018 |
| Note: Held By: RLEE 1. Florida energy code compliance certification shall be signed by the owner/agent per FBCEC 6th ed. R405.3. | |||
| UD1 | COMPLETE | 09/07/2018 | 09/14/2018 |
| Note: Released By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| SW1 | COMPLETE | 09/07/2018 | 09/14/2018 |
| Note: Released By: RLEE | |||
| ELEC | COMPLETE | 09/07/2018 | 09/14/2018 |
| Note: Released By: RLEE | |||
| BLD | COMPLETE | 09/07/2018 | 09/14/2018 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 09/07/2018 | 09/14/2018 |
| Note: Released By: RLEE | |||
| SWALE | COMPLETE | 08/21/2018 | 08/28/2018 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 08/16/2018 | 08/22/2018 |
| Note: Held By: JHINDMAN 1. On page D3 provide a roof underlayment that comlies with 6th ed. FBC R905. 2. On page D4 revise handrail gaurd note to the 6th edition Florida building code residential. J. Hindman 986-3784. | |||
| ELEC | HOLD | 08/16/2018 | 08/22/2018 |
| Note: Held By: JHINDMAN 1. Provide electrical load calculations 2014 NEC art.220. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 08/16/2018 | 08/21/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 08/16/2018 | 08/20/2018 |
| Note: Held By: FREODICA 1. Florida energy code compliance certification shall be signed by the owner/agent per FBCEC 6th ed. R405.3. 2. Energy performance level (EPL) display card shall be signed by the builder per FBCEC 6th ed. R401.3. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 08/16/2018 | 08/22/2018 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser diagram signed and sealed or signed by the plumbing contractor with thier license number. 6th ed. FBC 107.1. J. Hindman 986-3784. | |||
| SW1 | HOLD | 08/16/2018 | 08/22/2018 |
| Note: Held By: JHINDMAN 1. Provide positive flow along the right side property line from the rear to the front street. J. Hindman 986-3784. | |||
| UD1 | HOLD | 08/16/2018 | 08/22/2018 |
| Note: Held By: LFITZGERALD PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan | |||
| ZON | HOLD | 08/16/2018 | 08/17/2018 |
| Note: Held By: AMOBLEY 1. House does not meet the minimum side setback of 7.5' 2. Landscape plan should state if irrigation will be installed 3. AC pad should be screened with 7 gallon shrubs 4. Please show the total height of structure the maximum height is 35ft 5. Survey states a proposed 1 story and plans show a 2 story 6. Can not have an office in a single family residence. Please revise blueprints |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/11/2019 |
| REINSPECTION FEE | ¤40.00 | 10/11/2019 |
| REINSPECTION FEE | ¤40.00 | 10/11/2019 |
| REINSPECTION FEE | ¤40.00 | 10/11/2019 |
| REINSPECTION FEE | ¤40.00 | 10/11/2019 |
| REVISION | ¤40.00 | 10/11/2019 |
| SITE PLAN 20 | ¤20.00 | 09/21/2018 |
| SURCHARGE FS 533.721 | ¤25.85 | 09/21/2018 |
| SURCHARGE - FS 468.631 | ¤38.77 | 09/21/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/21/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 09/21/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,126.00 | 09/21/2018 |
| ADMIN FEE | ¤20.00 | 09/21/2018 |
| ELECTRIC FEE | ¤397.80 | 09/21/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 09/21/2018 |
| IMPACT FEE FIRE | ¤218.79 | 09/21/2018 |
| IMPACT FEE PARKS | ¤849.24 | 09/21/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/21/2018 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 09/21/2018 |
| MECHANICAL FEE | ¤397.80 | 09/21/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/21/2018 |
| PLAN CHECK FEE | ¤225.20 | 09/21/2018 |
| PLUMBING FEE | ¤397.80 | 09/21/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,188.25 |