I want to search for...

Permit #2018080757

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7012-00150-0060
Block: 00150
Subdivision: 2187 - SECTION 12-BELLE TERRE
Job Phone: 386-931-0401
Location Address: 11 BARRINGTON DR
Type: DR - DRIVEWAY
Issue Date: 09/11/2018
NOC: Unknown
Applicant name: RONNIE SANTOS AGUIAR
Owner: GNL MANAGEMENT LLC

Address

26 WEDGEWOOD DR

HUNTINGTON STATION, NY 11746

Lot: 0060
Contracted Stated Job Value: ¤2,375.00
Job Description: NEW DRIVEWAY
Type: CN

Contractor

SANTOS & SONS CONCRETE
Status Location Address Phone
INACTIVE

PO BOX 1903

BUNNELL, FL 32110

386-931-0401

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 10/08/2018 APPROVED RGROSS
ROW - FINAL INSPECTION 10/08/2018 FINAL APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 10/05/2018 FINAL APPROVED JNICHOLS
ROW- PRE-APRON (PRE-POUR) 09/25/2018 APPROVED RGROSS
Note: THIS IS A REINSPECTION. READY TO POUR
ROW- PRE-APRON (PRE-POUR) 09/24/2018 Disapproved -FEE REQUIRED RGROSS
Note: NOT FORMED CORRECTLY. MISSING AND BROKEN FORM BOARDS. NEEDS MORE COMPACTION.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 08/20/2018 08/23/2018
Note: Released By: TBAKER
SW1 COMPLETE 08/20/2018 08/21/2018
Note: Released By: JHINDMAN
UD1 COMPLETE 08/20/2018 08/27/2018
Note: Released By: MBACON Held By: LFITZGERALD NOTE:Existing pep tank is 6 feet from edge of driveway. The COPC Utility Standard requires 4.5 feet seperatin distance. The propposed widening of the driveway interfers with this requirement All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON COMPLETE 08/20/2018 08/20/2018
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 09/24/2018
SITE PLAN 20 ¤20.00 09/11/2018
SURCHARGE FS 533.721 ¤2.00 09/11/2018
SURCHARGE - FS 468.631 ¤2.00 09/11/2018
STORM WATER PERMIT FEES ¤40.00 09/11/2018
ADMIN FEE ¤20.00 09/11/2018
Fees Total Due: ¤0.00 Total Paid: ¤124.00