Permit #2018081223

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-2090
CONDITIONED SPACE: 2815 sqft
GARAGE: 684 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
OPENED PORCH (WITH ROOF) : 227 sqft
Total Square Footage: 3766 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: (386)383-0376
Location Address: 200 ASPEN WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/11/2018
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: YEAGER STEVEN & SHARON JOHNSTON JTWROS

Address

39 FAIRHILL LANE

PALM COAST, FL 32137

Lot: 2090
Contracted Stated Job Value: ¤505,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
PATRICK FRANCIS MCADAMS
Status Location Address State License Number Phone Fax
ACTIVE

1201 South Flagler Ave

Flagler Beach, FL 32136

CFC057805 (Exp: 08/31/2026) 386-283-9236 321-248-0447
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
EDWARD MILLER
Status Location Address State License Number Phone
CANCEL

PO BOX 238179

PORT ORANGE, FL 32129

CRC1330597 (Exp: 08/31/2020) 386-756-8770
WILLIAM D ALLEN
Status Location Address State License Number Phone Fax
INACTIVE

546 S. SHELL ROAD

DEBARY, FL 32713

LQ27843 (Exp: 08/13/2024) 386-668-9592 (386)668-8577

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/09/2019 FINAL APPROVED JCOLASANTI
U-CROSS CONNECTION 10/04/2019 APPROVED AHALL
ROW - STORMWATER FINAL 10/04/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 10/02/2019 APPROVED AHALL
ROW - STORMWATER FINAL 10/02/2019 Disapproved - NO FEE RGROSS
Note: WASHOUT IN THE POND WAS REPAIRED BUT THE BARE EARTH ON THE BANK NEEDS BAHIA SOD TO PREVENT ANOTHER WASHOUT.
ROW - FINAL APRON (AFTER POUR) 10/02/2019 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 09/27/2019 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 09/27/2019 APPROVED RGROSS
GAS FINAL 09/16/2019 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
GAS FINAL 08/26/2019 Disapproved - NO FEE JGIBSON
Note: THIS WAS A GAS ROUGH FOR GAS LINE GOING FROM TANK TO ALL HOUSE CONNCTIONS OK TO COVER UP DITCHES, GAS FINAL NOT APPROVED
ROW- PRE-APRON (PRE-POUR) 08/08/2019 APPROVED RGROSS
Note: READY FOR PAVERS
ROW- PAVER RESTRAINTS 08/02/2019 APPROVED RGROSS
GAS ROUGH 06/18/2019 APPROVED JGIBSON
ELECTRIC - EARLY POWER 06/12/2019 APPROVED - AS NOTED RMARTIN
Note: spoke to susan fpl released power 3:30
GRAVITY SEWER TEST 05/20/2019 APPROVED JGIBSON
U - SEWER TIE IN 05/20/2019 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 03/18/2019 APPROVED MWILLIAMS
INSULATION 03/01/2019 APPROVED WMILLER
Note: APPROVED
ALL ROUGH 02/25/2019 APPROVED - AS NOTED WMILLER
Note: Need fire blocking beside master bedroom right side (by insulation) (gas on separate inspection)
GAS ROUGH 02/25/2019 APPROVED - AS NOTED JGIBSON
Note: PER GAS MANUFACTURE TRAC-PIPE IS TO BE BONDED ALL OTHER IS OK
WALL SHEATHING 02/04/2019 APPROVED WMILLER
Note: WALL SHEATHING WAS COMPLETE DURRING ROOF SHEATHING/BRACES/TIES INSPECTION SO I ADDED THE WALL SHEATHING INSPECTION AND APPROVED IT
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/04/2019 APPROVED WMILLER
Note: APPROVED
ROOF VALLEY & METAL 02/04/2019 APPROVED WMILLER
Note: APPROVED
ROOF SHEATHING 01/22/2019 APPROVED WMILLER
Note: approved
ELECTRIC-TUG 12/04/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 11:20
TIE BEAM / LINTEL 11/16/2018 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 11/11/2018 APPROVED DREWIS
MONOLITHIC SLAB 10/31/2018 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2018 APPROVED - AS NOTED JGIBSON
Note: NEED TO INSULATE RESIRCULATION LINES FROM MASTER BATH TO TANKLESS WATER HEATER IN GARAGE PER PLAN, NEED RELIEVING ARCH OR TWO PIPE SIZES LARGER AT SUMMER KITCHEN WASTE PER P-2603.4

Review History

Department Status Date In Date Out
ZON COMPLETE 07/10/2019 07/11/2019
Note: Released By: AMOBLEY
BLD COMPLETE 06/24/2019 07/01/2019
Note: Released By: RLEE
SW1 COMPLETE 06/24/2019 06/24/2019
Note: Released By: JMUNSON
ZON HOLD 06/24/2019 06/24/2019
Note: Held By: AMOBLEY Please provide setbacks from tank to property lines on site plan
BLD COMPLETE 05/14/2019 05/21/2019
Note: Released By: RLEE
BLD COMPLETE 02/15/2019 02/22/2019
Note: Released By: JHINDMAN
ELEC COMPLETE 02/15/2019 02/22/2019
Note: Released By: JHINDMAN
BLD HOLD 02/07/2019 02/13/2019
Note: Held By: JHINDMAN 1. Provide signed and sealed engineering revision. Copies of a digital seal are not valid.
ELEC HOLD 02/07/2019 02/13/2019
Note: Held By: JHINDMAN 1. Provide an electric plan signed by the contractor with their license number. 6th ed. FBC 107.1.
BLD COMPLETE 01/22/2019 01/29/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 11/08/2018 11/11/2018
Note: Released By: DREWIS foundation s
BLD HOLD 10/23/2018 10/30/2018
Note: Held By: JHINDMAN 1. Provide an original signed and sealed bracing engineering letter. 6th ed. FBC 107.1. J. Hindman 986-3784.
MECH COMPLETE 09/27/2018 10/03/2018
Note: Released By: JHINDMAN
MECH HOLD 09/19/2018 09/26/2018
Note: Held By: JHINDMAN 2. Provide form R405 summary page with the a/c units listed or the room load summary from rhvac with the equipment data on it.. J. Hindman 986-3784.
ZON COMPLETE 09/12/2018 09/13/2018
Note: Released By: TDOAK
MECH HOLD 09/12/2018 09/18/2018
Note: Held By: JHINDMAN 1. The revised energy calculations are not a full set including the summary page that lists the components. J. hindman 986-3784.
BLD COMPLETE 08/31/2018 09/07/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 08/31/2018 09/07/2018
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 08/31/2018 09/05/2018
Note: Released By: TBAKER
MECH HOLD 08/31/2018 09/07/2018
Note: Held By: JHINDMAN 1. The square footage on the energy calculation project report 2780 sq. ft. and the square footage of the plans do not match 2815 sq. ft. 6th ed. FBC 107.3.5 J. Hindman 986-3784.
PLUM COMPLETE 08/31/2018 09/07/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 08/31/2018 09/07/2018
Note: Released By: JHINDMAN
UD1 COMPLETE 08/31/2018 09/06/2018
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON HOLD 08/31/2018 08/31/2018
Note: Held By: AMOBLEY This lot has two flood panel numbers. Survey must have both Please show rear setback from home and not pool deck Must have 5 replacement trees for lot size. They must be within the property lines. The ones by the water do not count
URB COMPLETE 08/31/2018 09/10/2018
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 10/11/2018
ELECTRIC FEE ¤363.00 10/11/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 10/11/2018
IMPACT FEE FIRE ¤218.79 10/11/2018
IMPACT FEE PARKS ¤849.24 10/11/2018
IMPACT FEE SCHOOL ¤3,600.00 10/11/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 10/11/2018
MECHANICAL FEE ¤363.00 10/11/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/11/2018
PLAN CHECK FEE ¤202.00 10/11/2018
PLUMBING FEE ¤363.00 10/11/2018
NEW RESIDENTIAL INSPECTIONS ¤1,010.00 10/11/2018
SITE PLAN 20 ¤20.00 10/11/2018
SURCHARGE FS 533.721 ¤23.41 10/11/2018
SURCHARGE - FS 468.631 ¤35.12 10/11/2018
STORM WATER PERMIT FEES ¤80.00 10/11/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 10/11/2018
Fees Total Due: ¤0.00 Total Paid: ¤10,007.09