Permit #2018081241
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00010-0060 |
| CONDITIONED SPACE: 2480 sqft |
| CONDITIONED SPACE: 384 sqft |
| GARAGE: 499 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| OPENED PORCH (WITH ROOF) : 367 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| Total Square Footage: 4263 sqft |
| Block: 00010 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 11 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/24/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 04/23/2019 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 04/23/2019 | APPROVED | MWILLIAMS |
| U-CROSS CONNECTION | 04/22/2019 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 04/22/2019 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 04/22/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 04/22/2019 | FINAL APPROVED | LFITZGERALD |
| GAS ROUGH | 04/22/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS IS A REINSPECTION gas line ran | |||
| GAS FINAL | 04/22/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO BOND WIRE RAN PER GAS ROUGH APPROVAL | |||
| TUB SET | 04/16/2019 | APPROVED | WMILLER |
| FINAL SURVEY (OFFICE USE ONLY) | 04/10/2019 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 03/26/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: DO NOT LAY PAVERS UNTIL DEPTH OF BASE CAN BE INSPECTED | |||
| ROW- PAVER RESTRAINTS | 03/26/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: SHOULD HAVE BEEN DONE ON 3-13-19 RESTRAINTS ARE IN AND OK | |||
| ELECTRIC - EARLY POWER | 03/20/2019 | FINAL APPROVED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 03/13/2019 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR APRON AND SIDE WALK POUR ONLY. | |||
| U - SEWER TIE IN | 02/18/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: VIDEO SENT BY PLUMBING CONTRACTOR ON U-TIE IN | |||
| GRAVITY SEWER TEST | 02/18/2019 | APPROVED | JGIBSON |
| GAS ROUGH | 02/08/2019 | PARTIALLY APPROVED | JGIBSON |
| Note: INSIDE GAS LINE TO FIRE BOX GOOD NEED ANOTHER GAS ROUGH WHEN GAS IS RAN TO HOUSE. GAS ROUGH AND GAS FINAL CAN BE SCHEDULED AT THE SAME TIME | |||
| GAS FINAL | 02/08/2019 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 02/08/2019 | APPROVED | WMILLER |
| Note: approved | |||
| INSULATION | 02/07/2019 | APPROVED | DROCKWELL |
| INSULATION | 02/06/2019 | Disapproved - NO FEE | WMILLER |
| Note: NEED INSULATION RATING CERTIFICATE | |||
| INSULATION | 02/05/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: need energy calcs on site for inspection | |||
| ALL ROUGH | 01/28/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 12/21/2018 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/20/2018 | APPROVED | MWILLIAMS |
| ELECTRIC-TUG | 12/12/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 2:40 | |||
| ROOF SHEATHING | 11/30/2018 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 11/14/2018 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 11/13/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Front window bar in wrong cell left side | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/09/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 10/29/2018 | APPROVED | WMILLER |
| Note: approved | |||
| MONOLITHIC SLAB | 10/25/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NO EVIDENCE OF TERMITE TREATMENT OR INTENT TO TREAT 2. STEMWALL CELLS TO BE GROUTED SOLID R609.1.4, (REMOVE SOIL FORM CELLS CHECK ALL 3. 1804.3 Placement of fill. The excavation to be filled with soil that is free of organic material, and construction debris | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/23/2018 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/22/2018 | CANCELLED BY APPLICANT | WEB |
| FOOTER | 10/08/2018 | APPROVED | CMINI |
| FOOTER | 10/04/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.3.3.7.4 (6TH EDITION) |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/04/2019 | 04/10/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 11/06/2018 | 11/09/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 09/18/2018 | 09/21/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 09/10/2018 | 09/11/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 09/10/2018 | 09/17/2018 |
| Note: Released By: DREWIS | |||
| BLD | HOLD | 09/10/2018 | 09/17/2018 |
| Note: Held By: JHINDMAN 1. Provide pages S-1, S-4, and S-5 that are designed to the 6th ed. Florida building code. J. hindman 986-3784. | |||
| BLD | HOLD | 08/31/2018 | 09/07/2018 |
| Note: Held By: JHINDMAN 1. Provide a complete set of structural plans and details. 6th ed. FBC 107.3.5. J. Hindman 986-3784. (Pages appear to be missing). | |||
| ELEC | HOLD | 08/31/2018 | 09/07/2018 |
| Note: Held By: JHINDMAN 1. Provide an electrical plan and electrical riser detail. 6th ed. FBC 107.3.5. J. Hindman 986-3784 | |||
| ENGIN1 | COMPLETE | 08/31/2018 | 09/05/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 08/31/2018 | 09/07/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 08/31/2018 | 09/07/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 08/31/2018 | 09/07/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 08/31/2018 | 09/06/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 08/31/2018 | 09/04/2018 |
| Note: Held By: TDOAK If paver driveway will extend into the right of way, an original Right of Way Utilization Agreement must be submitted. The survey depicts a paver driveway and a concrete walkway but does not address the driveway apron. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/22/2019 |
| REINSPECTION FEE | ¤40.00 | 04/19/2019 |
| REINSPECTION FEE | ¤40.00 | 04/19/2019 |
| REINSPECTION FEE | ¤40.00 | 10/25/2018 |
| REINSPECTION FEE | ¤40.00 | 10/25/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤750.00 | 09/24/2018 |
| SITE PLAN 20 | ¤20.00 | 09/24/2018 |
| SURCHARGE FS 533.721 | ¤17.95 | 09/24/2018 |
| SURCHARGE - FS 468.631 | ¤26.93 | 09/24/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/24/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 09/24/2018 |
| ADMIN FEE | ¤20.00 | 09/24/2018 |
| ELECTRIC FEE | ¤285.00 | 09/24/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 09/24/2018 |
| IMPACT FEE FIRE | ¤218.79 | 09/24/2018 |
| IMPACT FEE PARKS | ¤849.24 | 09/24/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/24/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 09/24/2018 |
| MECHANICAL FEE | ¤285.00 | 09/24/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/24/2018 |
| PLAN CHECK FEE | ¤150.00 | 09/24/2018 |
| PLUMBING FEE | ¤285.00 | 09/24/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,647.44 |