Permit #2018090032
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00380-0020 |
| CONDITIONED SPACE: 2347 sqft |
| GARAGE: 412 sqft |
| SCREEN PORCH (SOLID ROOF) : 240 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 3071 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 386-960-7720 |
| Location Address: 3 EASTWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/09/2018 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address STE 600 PALM BAY, FL 32907 |
|
Address 1663 GEORGIA STREET NE PALM BAY, FL 32907 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤230,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/29/2019 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 04/26/2019 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION ASPHALT PATCH IS SCHEDULED TO BE DONE TODAY | |||
| BLD - BUILDING FINAL | 04/26/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Attic access cover must be rated for flame spread / | |||
| ROW - FINAL INSPECTION | 04/24/2019 | Disapproved - NO FEE | KHOWELL |
| Note: REPAIR ROAD DAMAGE RIGHT OF DRIVEWAY, ALSO WANT TO SEE HOW GRADES WORK WHEN IT RAINS AND SEE IF HOME TO THE RIGHT IS BEING IMPACTED WITH RUN OFF FROM THIS PROPERTY | |||
| ROW - FINAL APRON (AFTER POUR) | 04/23/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: FINISH SAW CUT OVER CULVERT PIPES AND NEED FINAL CITY APPROVED SURVEY TO VERIFY CULVERT INVERT ELEVATIONS | |||
| U -UTILITY RESIDENTIAL FINAL | 04/23/2019 | FINAL APPROVED | AHALL |
| FINAL SURVEY (OFFICE USE ONLY) | 04/18/2019 | APPROVED | RLEE |
| ROW - FINAL APRON (AFTER POUR) | 03/28/2019 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 03/21/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 03/21/2019 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 03/20/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. ADD FORMS TO THE ENDS OF THE MITERS SO CONCRETE DOES NOT GO UNDER INTO THE SWALE | |||
| PROJECT STATUS (OFFICE USE) | 03/19/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: MET ON SITE WITH BUILDER TO GO OVER DRIVEWAY FORM WORK | |||
| ROW- PRE-APRON (PRE-POUR) | 03/18/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THE ROAD FORM BOARDS NOT ALLOWED TO BE PLACED WHERE CONCRETE WILL BE POURD INTO THE ROADWAY. THE CULVERT PIPE ON THE RIGHT SIDE IS OUT OF TOLERANCE A MAXIMUM OF 0.1' OF SLOPED ALLOWED ACROSS THE PIPE. THE MITERED END SECTIONS NOT FORMED TO CITY STANADARD DRIVEWAY DETAIL 18" FROM THE SIDE OF THE PIPE AT THE TOP AND 9" FROM THE SIDE AT THE BOTTOM. THE FOOTERS ARE REQUIIRED TO BE DUG OUT A MINIMUM OF 3" UNDER THE CULVERT AND 6" DEEP. THA ROAD FORMS ARE REQUIRED TO FOLLOW THE EXISTING EDGE OF PAVEMENT AND FOLLOW THE RADIUS. THE CULVERT PIPES ARE REQUIRED TO BE DUG OUT HALK WAY DOWN THE PIPE SEE STANDARD DETAIL. CULVERT PIPE REQUIRED TO BE 8' FROM EXISTING EDGE OF PAVEMENT. REBAR FOR FOOTERS NOT ON SITE | |||
| U - SEWER TIE IN | 03/12/2019 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 03/12/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 10:45 | |||
| GRAVITY SEWER TEST | 03/12/2019 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 01/16/2019 | APPROVED | DROCKWELL |
| LATH/BRICK/ WATER BARRIER | 01/11/2019 | APPROVED | DROCKWELL |
| ALL ROUGH | 01/08/2019 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 12/21/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/19/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/18/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Girder trusses require 2 straps...se repair detail/Provide solid blocking along flat top trusses..OSB 7/16 cannot span more than 24in | |||
| TIE BEAM / LINTEL | 12/03/2018 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 11/29/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 11/19/2018 | APPROVED | RLEE |
| MONOLITHIC SLAB | 11/16/2018 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/14/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/17/2019 | 04/18/2019 |
| Note: Released By: RLEE Final S | |||
| SW1 | COMPLETE | 11/29/2018 | 11/29/2018 |
| Note: Released By: DREWIS Foundation Survey | |||
| ZON | COMPLETE | 10/03/2018 | 10/03/2018 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 09/26/2018 | 09/26/2018 |
| Note: Held By: AMOBLEY Please revise landscape plan showing the driveway change Please show that the stone on each side of house will wrap corners at least two feet | |||
| MECH | COMPLETE | 09/26/2018 | 10/02/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 09/26/2018 | 10/02/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 09/26/2018 | 10/02/2018 |
| Note: Released By: MBACON PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| SWALE | COMPLETE | 09/05/2018 | 09/12/2018 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 09/04/2018 | 09/10/2018 |
| Note: Held By: JHINDMAN 1. Provide an exterior wall finish that complies with the 6th ed. FBC R 703. (stucco).Code does not define Cementitius coating. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 09/04/2018 | 09/10/2018 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 09/04/2018 | 09/05/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 09/04/2018 | 09/10/2018 |
| Note: Held By: JHINDMAN 1. Provide missing builders signatures on the energy form R405-2017 page 1 and the Energy Performance display card. J. Hindman 986-3784. | |||
| PLUM | COMPLETE | 09/04/2018 | 09/10/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/04/2018 | 09/10/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | HOLD | 09/04/2018 | 09/11/2018 |
| Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 09/04/2018 | 09/05/2018 |
| Note: Held By: AMOBLEY Banding/stone must wrap corners at least 2ft Can not have an office in a single family residence (change room name on plans) Maximum driveway width can not exceed 35ft and it must arc more to be a circular driveway |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/29/2019 |
| REINSPECTION FEE | ¤40.00 | 03/19/2019 |
| REINSPECTION FEE | ¤40.00 | 12/18/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤580.00 | 10/09/2018 |
| SITE PLAN 20 | ¤20.00 | 10/09/2018 |
| SURCHARGE FS 533.721 | ¤14.38 | 10/09/2018 |
| SURCHARGE - FS 468.631 | ¤21.57 | 10/09/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/09/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 10/09/2018 |
| ADMIN FEE | ¤20.00 | 10/09/2018 |
| ELECTRIC FEE | ¤234.00 | 10/09/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/09/2018 |
| IMPACT FEE FIRE | ¤218.79 | 10/09/2018 |
| IMPACT FEE PARKS | ¤849.24 | 10/09/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/09/2018 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 10/09/2018 |
| MECHANICAL FEE | ¤234.00 | 10/09/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/09/2018 |
| PLAN CHECK FEE | ¤116.00 | 10/09/2018 |
| PLUMBING FEE | ¤234.00 | 10/09/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,892.98 |