Permit #2018090303
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-3370 |
| CONDITIONED SPACE: 1130 sqft |
| CONDITIONED SPACE: 1626 sqft |
| GARAGE: 497 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| OPENED PORCH (WITH ROOF) : 109 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| Total Square Footage: 3767 sqft |
| Block: 0 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-947-4481 |
| Location Address: 252 CONSERVATORY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/03/2018 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: COSENTINO JOSEPH & JULIA I |
|
Address COSENTINO H&W PALM COAST, FL 32137 |
|
Address 30 OCEAN DUNE CIRCLE PALM COAST, FL 32137 |
| Lot: 3370 |
| Contracted Stated Job Value: ¤483,350.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
KEITH A BATTERBEE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
380 SE 123RD STREET ROAD OCALA, FL 34480 |
CCC1326176 (Exp: 08/31/2026) | 352-748-6300 X102 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/25/2019 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 07/25/2019 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 07/24/2019 | FINAL APPROVED | JNICHOLS |
| ROW - FINAL APRON (AFTER POUR) | 07/24/2019 | APPROVED | RGROSS |
| BLD - BUILDING FINAL | 07/24/2019 | Disapproved - NO FEE | WMILLER |
| Note: 1. need someone to remove return air plenum register. (need to check) 2. WEATHER STRIPPING NEEDS TO BE INSTALLED R 612.1 FBC 3. need access to up stairs a/c unit | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/23/2019 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/23/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 07/16/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 06/17/2019 | PARTIALLY APPROVED | RGROSS |
| Note: THIS INSPECTION WAS DONE ON FRIDAY DUE TO INCOMING RAIN AND ONLY ONE INSPECTOR FOR THE WHOLE CITY ON MONDAY. PARTIALLY APPROVED FOR SIDEWALK AND APRON POUR ONLY. PAVER DRIVEWAY. | |||
| ELECTRIC - EARLY POWER | 05/23/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DEL FPL RELEASED POWER 4:00 | |||
| LATH/BRICK/ WATER BARRIER | 05/09/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 05/06/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: DOORS AND SLIDERS NOT PROPERLY FLASHED NEED TO SEAL PROPERLY... HOLES IN WALLS MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE, R402.4 1.1 AIR LEAKAGE (MANDATORY). INSTALLATION, R402.4, OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED fbc. R302.5 | |||
| ELECTRIC-TUG | 05/03/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 3:00 RELOCATING SERVICE | |||
| GRAVITY SEWER TEST | 04/23/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/23/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/18/2019 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 04/18/2019 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 04/18/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 04/17/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 protection from physical damage. (LOW VOLTAGE) CHECK ALL) | |||
| ALL ROUGH | 04/12/2019 | APPROVED - AS NOTED | WMILLER |
| Note: THIS IS A REINSPECTION WILL CHECK THE FOLLOWING AT INSULATION 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 protection from physical damage. (LOW VOLTAGE) CHECK ALL) 2. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), | |||
| ALL ROUGH | 04/11/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. (CHECK ALL) 2. LOW VOLTAGE WIRING NOT TERMINATED AT DOORWAYS (HANGING INSIDE OF WALL CAVITY) 3. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 protection from physical damage. (LOW VOLTAGE) CHECK ALL) 4. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/26/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. need revision for interior and exterior frame bearing wall and opening details. (many straps have only 2 or 3 nails on top plates, and there are no details for ties at openings) 2. check all hardware connecting floor and roof trusses to bearing walls, girders, and beams (missing many fasteners) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/20/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: Missing strapping and tie downs on all load bearing walls per plan. Also missing second floor 4x4 post in load bearing point on second story per plan.( beside Air Handler closet.) check all strapping and engineered requirements. Can not substititue or alter plan details without a revision of plans. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/15/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need approved plans on site for inspection) | |||
| ALL ROUGH | 03/15/2019 | Disapproved - NO FEE | WMILLER |
| Note: must pass roof sheathing braces ties down cells prior to calling in all-rough | |||
| PLUMBING 2ND ROUGH | 03/13/2019 | CANCELLED BY INSPECTOR | WMILLER |
| Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR TO ALL-ROUGH WRONG INSPECTION CALLED IN.... CALL IN ALL-ROUGH WHEN READY (AFTER PASSING ROOF SHEATHING BRACES TIES DOWNCELLS) | |||
| HVAC ROUGH | 03/13/2019 | CANCELLED BY INSPECTOR | WMILLER |
| Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR TO ALL-ROUGH WRONG INSPECTION CALLED IN.... CALL IN ALL-ROUGH WHEN READY (AFTER PASSING ROOF SHEATHING BRACES TIES DOWNCELLS | |||
| ELECTRIC 2ND ROUGH | 03/13/2019 | CANCELLED BY INSPECTOR | WMILLER |
| Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR TO ALL-ROUGH WRONG INSPECTION CALLED IN.... CALL IN ALL-ROUGH WHEN READY (AFTER PASSING ROOF SHEATHING BRACES TIES DOWNCELLS | |||
| ROOF VALLEY & METAL | 02/21/2019 | APPROVED | WMILLER |
| Note: approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/14/2019 | PARTIALLY APPROVED | JHINDMAN |
| Note: sheathing only | |||
| ELECTRIC-TUG | 01/22/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 3:20 | |||
| ELECTRIC-TUG | 01/18/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: APPROVED RISER DIAGRAM DOES NOT MATCH WHAT IS INSTALLED, NEED REVISION SHOWING CHANGE | |||
| TIE BEAM / LINTEL | 01/17/2019 | APPROVED | WMILLER |
| Note: second level approved | |||
| TIE BEAM / LINTEL | 12/27/2018 | PARTIALLY APPROVED | WMILLER |
| Note: FIRST FLOOR APPROVED | |||
| TIE BEAM / LINTEL | 12/26/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (no plans on site) | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/21/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 12/06/2018 | APPROVED - AS NOTED | WMILLER |
| Note: APPROVED AS NOTEED.... 'STEMWALL FOUNDATION WAS APPROVED BY JC ON 11/13/2018 AND CALLED IN AGAIN WHEN MONO SLAB WAS INTENDED... CORRECT INSPECTION WAS SET UP AND RESULTED AS APPROVED | |||
| STEM WALL FOUNDATION | 12/06/2018 | CANCELLED BY INSPECTOR | WMILLER |
| Note: STEMWALL FOUNDATION WAS APPROVED BY JC ON 11/13/2018 WRONG INSPECTION CALLED IN | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/30/2018 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/29/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: p-305.3 pipes through foundation walls | |||
| STEM WALL FOUNDATION | 11/13/2018 | APPROVED - AS NOTED | JCOLASANTI |
| Note: 5 course block ok to pour and backfill | |||
| STEM WALL FOUNDATION | 11/01/2018 | APPROVED | WMILLER |
| Note: STEMWALL FOOTING OK |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/02/2019 | 04/09/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 12/20/2018 | 12/21/2018 |
| Note: Released By: DREWIS FOUNDATION | |||
| ZON | COMPLETE | 09/26/2018 | 09/26/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 09/26/2018 | 09/27/2018 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 09/26/2018 | 10/02/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 09/26/2018 | 10/02/2018 |
| Note: Released By: JHINDMAN | |||
| URB | COMPLETE | 09/12/2018 | 09/13/2018 |
| Note: Released By: JBEAUDET | |||
| BLD | HOLD | 09/11/2018 | 09/17/2018 |
| Note: Held By: JHINDMAN 1. Provide currently adopted code references on page 6 stair details and page 7 sheathing nailing chart. 6th ed. FBC J. hindman 986-3784 | |||
| ELEC | HOLD | 09/11/2018 | 09/17/2018 |
| Note: Held By: DREWIS Provide a darker outlined plan for scanning. The current plan does not depict the building outline when scanned. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 09/11/2018 | 09/12/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 09/11/2018 | 09/17/2018 |
| Note: Held By: JHINDMAN 1. Provide the correct number of bedrooms on the energy calculation forms 6th ed. FBC E R405. J. hindman 986-3784. | |||
| PLUM | COMPLETE | 09/11/2018 | 09/18/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/11/2018 | 09/17/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 09/11/2018 | 09/17/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 09/11/2018 | 09/12/2018 |
| Note: Held By: AMOBLEY Maximum width for a walkway is 6ft anything wider than that is considered a patio and must meet the minimum front setback. Please revise survey showing the setback from front area that is wider than 6ft or revise walkway width to 6ft. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REINSPECTION FEE | ¤40.00 | 08/06/2019 |
| REVISION | ¤40.00 | 08/06/2019 |
| SITE PLAN 20 | ¤20.00 | 10/03/2018 |
| SURCHARGE FS 533.721 | ¤22.53 | 10/03/2018 |
| SURCHARGE - FS 468.631 | ¤33.79 | 10/03/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/03/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/03/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤968.00 | 10/03/2018 |
| ADMIN FEE | ¤20.00 | 10/03/2018 |
| ELECTRIC FEE | ¤350.40 | 10/03/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/03/2018 |
| IMPACT FEE FIRE | ¤218.79 | 10/03/2018 |
| IMPACT FEE PARKS | ¤849.24 | 10/03/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/03/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/03/2018 |
| MECHANICAL FEE | ¤350.40 | 10/03/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/03/2018 |
| PLAN CHECK FEE | ¤193.60 | 10/03/2018 |
| PLUMBING FEE | ¤350.40 | 10/03/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,316.68 |