Permit #2018090303

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-3370
CONDITIONED SPACE: 1130 sqft
CONDITIONED SPACE: 1626 sqft
GARAGE: 497 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
OPENED PORCH (WITH ROOF) : 176 sqft
OPENED PORCH (WITH ROOF) : 109 sqft
OPENED PORCH (WITH ROOF) : 176 sqft
Total Square Footage: 3767 sqft
Block: 0
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-947-4481
Location Address: 252 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/03/2018
NOC: RECORDED
Applicant name: ERIC CHRISTOPHER OLSEN
Owner: COSENTINO JOSEPH & JULIA I

Address

COSENTINO H&W

PALM COAST, FL 32137

Address

30 OCEAN DUNE CIRCLE

PALM COAST, FL 32137

Lot: 3370
Contracted Stated Job Value: ¤483,350.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

OLSEN CUSTOM HOMES AND CONSULTING INC
Status Location Address State License Number Phone Fax
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

CGC1508852 (Exp: 08/31/2026) 386-947-4481 (386)947-4484

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
KEITH A BATTERBEE
Status Location Address State License Number Phone
ACTIVE

380 SE 123RD STREET ROAD

OCALA, FL 34480

CCC1326176 (Exp: 08/31/2026) 352-748-6300 X102

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/25/2019 FINAL APPROVED WMILLER
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 07/25/2019 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 07/24/2019 FINAL APPROVED JNICHOLS
ROW - FINAL APRON (AFTER POUR) 07/24/2019 APPROVED RGROSS
BLD - BUILDING FINAL 07/24/2019 Disapproved - NO FEE WMILLER
Note: 1. need someone to remove return air plenum register. (need to check) 2. WEATHER STRIPPING NEEDS TO BE INSTALLED R 612.1 FBC 3. need access to up stairs a/c unit
FINAL SURVEY (OFFICE USE ONLY) 07/23/2019 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/23/2019 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 07/16/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW- PRE-APRON (PRE-POUR) 06/17/2019 PARTIALLY APPROVED RGROSS
Note: THIS INSPECTION WAS DONE ON FRIDAY DUE TO INCOMING RAIN AND ONLY ONE INSPECTOR FOR THE WHOLE CITY ON MONDAY. PARTIALLY APPROVED FOR SIDEWALK AND APRON POUR ONLY. PAVER DRIVEWAY.
ELECTRIC - EARLY POWER 05/23/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DEL FPL RELEASED POWER 4:00
LATH/BRICK/ WATER BARRIER 05/09/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 05/06/2019 Disapproved -FEE REQUIRED WMILLER
Note: DOORS AND SLIDERS NOT PROPERLY FLASHED NEED TO SEAL PROPERLY... HOLES IN WALLS MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE, R402.4 1.1 AIR LEAKAGE (MANDATORY). INSTALLATION, R402.4, OPENINGS AND PENETRATIONS THROUGH WALLS OR CEILINGS SEPARATING THE DWELLING UNIT FROM THE GARAGE SHALL NOT BE PERMITTED fbc. R302.5
ELECTRIC-TUG 05/03/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG 3:00 RELOCATING SERVICE
GRAVITY SEWER TEST 04/23/2019 APPROVED JGIBSON
U - SEWER TIE IN 04/23/2019 APPROVED JGIBSON
U - SEWER TIE IN 04/18/2019 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 04/18/2019 CANCELLED BY APPLICANT WEB
INSULATION 04/18/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION
INSULATION 04/17/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 protection from physical damage. (LOW VOLTAGE) CHECK ALL)
ALL ROUGH 04/12/2019 APPROVED - AS NOTED WMILLER
Note: THIS IS A REINSPECTION WILL CHECK THE FOLLOWING AT INSULATION 1. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 protection from physical damage. (LOW VOLTAGE) CHECK ALL) 2. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1),
ALL ROUGH 04/11/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. (CHECK ALL) 2. LOW VOLTAGE WIRING NOT TERMINATED AT DOORWAYS (HANGING INSIDE OF WALL CAVITY) 3. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 protection from physical damage. (LOW VOLTAGE) CHECK ALL) 4. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1),
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/10/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/26/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. need revision for interior and exterior frame bearing wall and opening details. (many straps have only 2 or 3 nails on top plates, and there are no details for ties at openings) 2. check all hardware connecting floor and roof trusses to bearing walls, girders, and beams (missing many fasteners)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/20/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: Missing strapping and tie downs on all load bearing walls per plan. Also missing second floor 4x4 post in load bearing point on second story per plan.( beside Air Handler closet.) check all strapping and engineered requirements. Can not substititue or alter plan details without a revision of plans.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/15/2019 Disapproved -FEE REQUIRED WMILLER
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need approved plans on site for inspection)
ALL ROUGH 03/15/2019 Disapproved - NO FEE WMILLER
Note: must pass roof sheathing braces ties down cells prior to calling in all-rough
PLUMBING 2ND ROUGH 03/13/2019 CANCELLED BY INSPECTOR WMILLER
Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR TO ALL-ROUGH WRONG INSPECTION CALLED IN.... CALL IN ALL-ROUGH WHEN READY (AFTER PASSING ROOF SHEATHING BRACES TIES DOWNCELLS)
HVAC ROUGH 03/13/2019 CANCELLED BY INSPECTOR WMILLER
Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR TO ALL-ROUGH WRONG INSPECTION CALLED IN.... CALL IN ALL-ROUGH WHEN READY (AFTER PASSING ROOF SHEATHING BRACES TIES DOWNCELLS
ELECTRIC 2ND ROUGH 03/13/2019 CANCELLED BY INSPECTOR WMILLER
Note: MUST PASS ROOF SHEATHING BRACES TIES DOWNCELLS PRIOR TO ALL-ROUGH WRONG INSPECTION CALLED IN.... CALL IN ALL-ROUGH WHEN READY (AFTER PASSING ROOF SHEATHING BRACES TIES DOWNCELLS
ROOF VALLEY & METAL 02/21/2019 APPROVED WMILLER
Note: approved
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/14/2019 PARTIALLY APPROVED JHINDMAN
Note: sheathing only
ELECTRIC-TUG 01/22/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 3:20
ELECTRIC-TUG 01/18/2019 Disapproved -FEE REQUIRED RMARTIN
Note: APPROVED RISER DIAGRAM DOES NOT MATCH WHAT IS INSTALLED, NEED REVISION SHOWING CHANGE
TIE BEAM / LINTEL 01/17/2019 APPROVED WMILLER
Note: second level approved
TIE BEAM / LINTEL 12/27/2018 PARTIALLY APPROVED WMILLER
Note: FIRST FLOOR APPROVED
TIE BEAM / LINTEL 12/26/2018 Disapproved -FEE REQUIRED WMILLER
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (no plans on site)
FOUND SURVEY APPROVED (OFFICE) 12/21/2018 APPROVED DREWIS
MONOLITHIC SLAB 12/06/2018 APPROVED - AS NOTED WMILLER
Note: APPROVED AS NOTEED.... 'STEMWALL FOUNDATION WAS APPROVED BY JC ON 11/13/2018 AND CALLED IN AGAIN WHEN MONO SLAB WAS INTENDED... CORRECT INSPECTION WAS SET UP AND RESULTED AS APPROVED
STEM WALL FOUNDATION 12/06/2018 CANCELLED BY INSPECTOR WMILLER
Note: STEMWALL FOUNDATION WAS APPROVED BY JC ON 11/13/2018 WRONG INSPECTION CALLED IN
PLUMBING 1ST ROUGH UNDERGROUND 11/30/2018 APPROVED JGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 11/29/2018 Disapproved -FEE REQUIRED JGIBSON
Note: p-305.3 pipes through foundation walls
STEM WALL FOUNDATION 11/13/2018 APPROVED - AS NOTED JCOLASANTI
Note: 5 course block ok to pour and backfill
STEM WALL FOUNDATION 11/01/2018 APPROVED WMILLER
Note: STEMWALL FOOTING OK

Review History

Department Status Date In Date Out
BLD COMPLETE 04/02/2019 04/09/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 12/20/2018 12/21/2018
Note: Released By: DREWIS FOUNDATION
ZON COMPLETE 09/26/2018 09/26/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 09/26/2018 09/27/2018
Note: Released By: DREWIS
MECH COMPLETE 09/26/2018 10/02/2018
Note: Released By: JHINDMAN
BLD COMPLETE 09/26/2018 10/02/2018
Note: Released By: JHINDMAN
URB COMPLETE 09/12/2018 09/13/2018
Note: Released By: JBEAUDET
BLD HOLD 09/11/2018 09/17/2018
Note: Held By: JHINDMAN 1. Provide currently adopted code references on page 6 stair details and page 7 sheathing nailing chart. 6th ed. FBC J. hindman 986-3784
ELEC HOLD 09/11/2018 09/17/2018
Note: Held By: DREWIS Provide a darker outlined plan for scanning. The current plan does not depict the building outline when scanned. Daniel Rewis 986-4736
ENGIN1 COMPLETE 09/11/2018 09/12/2018
Note: Released By: TBAKER
MECH HOLD 09/11/2018 09/17/2018
Note: Held By: JHINDMAN 1. Provide the correct number of bedrooms on the energy calculation forms 6th ed. FBC E R405. J. hindman 986-3784.
PLUM COMPLETE 09/11/2018 09/18/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 09/11/2018 09/17/2018
Note: Released By: DREWIS
UD1 COMPLETE 09/11/2018 09/17/2018
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 09/11/2018 09/12/2018
Note: Held By: AMOBLEY Maximum width for a walkway is 6ft anything wider than that is considered a patio and must meet the minimum front setback. Please revise survey showing the setback from front area that is wider than 6ft or revise walkway width to 6ft.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REINSPECTION FEE ¤40.00 08/06/2019
REVISION ¤40.00 08/06/2019
SITE PLAN 20 ¤20.00 10/03/2018
SURCHARGE FS 533.721 ¤22.53 10/03/2018
SURCHARGE - FS 468.631 ¤33.79 10/03/2018
STORM WATER PERMIT FEES ¤80.00 10/03/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 10/03/2018
NEW RESIDENTIAL INSPECTIONS ¤968.00 10/03/2018
ADMIN FEE ¤20.00 10/03/2018
ELECTRIC FEE ¤350.40 10/03/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 10/03/2018
IMPACT FEE FIRE ¤218.79 10/03/2018
IMPACT FEE PARKS ¤849.24 10/03/2018
IMPACT FEE SCHOOL ¤3,600.00 10/03/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 10/03/2018
MECHANICAL FEE ¤350.40 10/03/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/03/2018
PLAN CHECK FEE ¤193.60 10/03/2018
PLUMBING FEE ¤350.40 10/03/2018
Fees Total Due: ¤0.00 Total Paid: ¤10,316.68