I want to search for...
Permit #2018090425
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0640 |
| CONDITIONED SPACE: 2947 sqft |
| GARAGE: 994 sqft |
| OPENED PORCH (WITH ROOF) : 418 sqft |
| OPENED PORCH (WITH ROOF) : 81 sqft |
| GARAGE: 500 sqft |
| Total Square Footage: 4940 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-947-4481 |
| Location Address: 39 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/26/2018 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: BROWN TIMOTHY E & JENNIFER F BROWN & CAROLYN E FLE |
|
Address 110 WATERBURY PLACE LEXINGTON, NC 27292 |
| Lot: 0640 |
| Contracted Stated Job Value: ¤525,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
KEITH A BATTERBEE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
380 SE 123RD STREET ROAD OCALA, FL 34480 |
CCC1326176 (Exp: 08/31/2026) | 352-748-6300 X102 |
MARK A RUGGIERO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
411 6TH STREET HOLLY HILL , FL 32117 |
01612 (Exp: 07/23/2023) | 386-252-5555 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 07/15/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 07/10/2019 | CANCELLED BY APPLICANT | WEB |
| ROW- PAVER RESTRAINTS | 07/10/2019 | APPROVED - AS NOTED | RGROSS |
| Note: SEE NOTES ON SECOND PRE POUR INSPECTION. THIS WAS SCHEDULED THE SAME DAY BY INSPECTOR. ANY QUESTIONS CALL ROBERT 386-793-3980. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/10/2019 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. BUILDER FAILED TO SCHEDULED THE SECOND PART OF THE PRE POUR TO VERIFY DEPTH OF BASE BEFORE PLACING PAVERS. BUILDER REMOVED PAVERS ENOUGH TO INSPECT FOR COMPLIANCE. NOTE THAT THE FINAL STORMWATER WAS ORIGINALLY FAILED BECAUSE THIS INSPECTION WAS NOT YET APPROVED. BECAUSE THIS IS IN NOW APPROVED AS NOTED ABOVE, THE INSPECTOR RESCHEDULED THE FINAL STORMWATER AND PAVER RESTRAINTS THE SAME DAY AND APPROVED. ONLY FINAL APRON INSPECTION IS NOW PENDING. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/10/2019 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION. SEE NOTES ON FINAL STORMWATER INSPECTION | |||
| ROW - STORMWATER FINAL | 07/10/2019 | Disapproved - NO FEE | RGROSS |
| Note: SECOND PART OF THE PRE POUR PAVER BASE INSPECTION MUST BE DONE BEFORE THE FINAL STORMWATER AND APRON CAN BE APPROVED. SPOKE TO BUILDER TO PULL PAVERS FOR INSPECTION. | |||
| ROW - STORMWATER FINAL | 07/10/2019 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. SCHEDULED AND APPROVED AFTER A PREVIOUS FAILED INSPECTION THE SAME DAY. SEE NOTES ON SECOND PART OF THE PRE POUR INSPECTION FOR EXPLAINATION. ANY QUESTIONS CALL ROBERT 386 793-3980 | |||
| ROW- PAVER RESTRAINTS | 07/09/2019 | APPROVED | RGROSS |
| BLD - BUILDING FINAL | 07/09/2019 | APPROVED | MWILLIAMS |
| U-CROSS CONNECTION | 07/08/2019 | APPROVED | LFITZGERALD |
| ROW- PRE-APRON (PRE-POUR) | 07/08/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION. THIS INSPECTION WAS TO BE DONE BEFORE THE PAVERS WERE PLACED. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/08/2019 | Disapproved - NO FEE | RGROSS |
| Note: THIS INSPECTION CANNOT BE DONE UNTIL THE SECOND PART OF THE PAVER PRE POUR IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/08/2019 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/08/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. SCHEDULED BY INSPECTOR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/02/2019 | Disapproved - NO FEE | RGROSS |
| Note: WATER WILL HOLD AGAINST THE FOUNDATION FROM ROOF DRIP EDGE CREATING A WASHOUT NEAR THE FOUNDATION. SEE FIELD SURVEY MARKUP. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/02/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 06/17/2019 | Disapproved - NO FEE | KHOWELL |
| Note: THIS IS A REINSPECTION PAVER DRIVEWAY HAS BEEN FINISHED WITHOUT SECOND PRE-POUR ALSO DID NOT HAVE PAVER RESTRAINT INSPECTION PREFORMED | |||
| ROW- PRE-APRON (PRE-POUR) | 05/02/2019 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR THE APRON POUR ONLY. PAVER DRIVEWAY. | |||
| ELECTRIC - EARLY POWER | 04/26/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 2:45 | |||
| GRAVITY SEWER TEST | 04/24/2019 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 04/18/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: SEWER HAS NEAGITIVE PITCH ON LATERAL BY FRONT HOSE BIB LEADING TO VERTICAL 6''.NO HEAD TEST P-312.6,AND 704.1 SLOPE OF HORIZONTAL DRAINAGE | |||
| U - SEWER TIE IN | 04/18/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/05/2019 | APPROVED | MWILLIAMS |
| INSULATION | 03/20/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 03/18/2019 | APPROVED | MWILLIAMS |
| WALL SHEATHING | 03/13/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/13/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: On residential construction Individual trades inspections should not be called in. An All Rough Inspection is to be called. This inspection covers all trades and final framing. Calling in individual inspections will not advance the job to the next Inspection level which is Insulation. In the future please have all areas completed for an All Rough inspection in call it in as such. | |||
| PLUMBING 2ND ROUGH | 03/13/2019 | APPROVED | MWILLIAMS |
| HVAC ROUGH | 03/13/2019 | APPROVED | MWILLIAMS |
| ELECTRIC 2ND ROUGH | 03/13/2019 | APPROVED | MWILLIAMS |
| GAS ROUGH | 03/01/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 02/25/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/19/2019 | Disapproved - NO FEE | WMILLER |
| Note: NEEDS STRAPS AT BEARING HEADERS TO GO GO UP AND OVER FROM JACK TO JACK AND ADD MISSING H2.5 PER PLANS | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/18/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS ASSIGNED TO INSPECTOR DR I WAS CLOSER SO I TOOK IT THERE WAS NO APPROVED PAPERWORK ON SIGHT PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need the APPROVED paperwork on site at time of final) | |||
| ELEV CERT-FOUNDATION APPROVAL | 02/15/2019 | APPROVED | JMYERS |
| ELECTRIC-TUG | 02/05/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 2:50 | |||
| TIE BEAM / LINTEL | 01/28/2019 | APPROVED | WMILLER |
| Note: approved | |||
| TIE BEAM / LINTEL | 01/22/2019 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 01/18/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 12/28/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| MONOLITHIC SLAB | 12/27/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: not ready still working still digging still placing horizontal and vertical reinforcement | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/11/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 07/12/2019 | 07/12/2019 |
| Note: Released By: JMYERS The Final elevation certificate has been accepted. | |||
| PLFM | HOLD | 07/01/2019 | 07/02/2019 |
| Note: Held By: JMYERS The address cannot be hand written in and it needs to be on all pages of the elevation certificate. | |||
| ZON | COMPLETE | 02/25/2019 | 02/25/2019 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 02/19/2019 | 02/26/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 02/19/2019 | 02/19/2019 |
| Note: Held By: AMOBLEY Please show the tank location of the site/survey with setbacks for zoning to review | |||
| PLFM | COMPLETE | 02/15/2019 | 02/15/2019 |
| Note: Released By: JMYERS The Building elevation certificate submitted has been accepted. However, at Final a hand written in address will not be accepted. | |||
| SW1 | COMPLETE | 01/15/2019 | 01/18/2019 |
| Note: Released By: JHINDMAN foundation | |||
| BLD | COMPLETE | 11/19/2018 | 11/26/2018 |
| Note: Released By: RLEE | |||
| ZON | COMPLETE | 11/19/2018 | 11/19/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 11/13/2018 | 11/13/2018 |
| Note: Released By: DREWIS Updated pg 5 Electrical plan. | |||
| ZON | HOLD | 11/08/2018 | 11/09/2018 |
| Note: Held By: AMOBLEY We have a copy of the MPD. We need an actual approval letter from the architectural review board stating that they approve the detached garage along with the attached garage Please submit a new landscape plan matching the new layout Total area calculations on floor plan page do not add up correctly | |||
| ELEC | HOLD | 11/08/2018 | 11/13/2018 |
| Note: Held By: DREWIS Master bathroom counter top GFCI is too far from the sink, NEC 2014 210.52D. Daniel Rewis 986-4736 | |||
| UTL | COMPLETE | 11/08/2018 | 11/14/2018 |
| Note: Released By: MBACON | |||
| SW1 | COMPLETE | 11/08/2018 | 11/13/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 11/08/2018 | 11/08/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 11/08/2018 | 11/16/2018 |
| Note: Released By: RLEE | |||
| MECH | COMPLETE | 11/08/2018 | 11/16/2018 |
| Note: Released By: RLEE | |||
| ZON | HOLD | 10/12/2018 | 10/12/2018 |
| Note: Held By: TAWILLIAMS REPEAT COMMENTS: Detached garages can not exceed a total of 500 sq ft Provide a copy of approval letter from the ARB stating that they approve a detached garage | |||
| BLD | COMPLETE | 10/12/2018 | 10/18/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 10/12/2018 | 10/16/2018 |
| Note: Held By: DREWIS Master bathroom counter top GFCI is too far from the sink, NEC 2014 210.52D. Daniel Rewis 986-4736 | |||
| PLFM | COMPLETE | 09/14/2018 | 09/14/2018 |
| Note: Released By: JMYERS The Construction elevation certificate submitted has been deemed acceptable. Please provide Building and Final elevation certificates prior to receiving CO. | |||
| BLD | HOLD | 09/13/2018 | 09/18/2018 |
| Note: Held By: JHINDMAN 1. Provide the correct code references on page 2 (roof note) and page 7(sheathing nailing) 2017 6th edition florida Building Code. J. hindman 986-3784. | |||
| ELEC | HOLD | 09/13/2018 | 09/18/2018 |
| Note: Held By: DREWIS Provide a plan with a darker outine of the proposed residence, it does not show clearly. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 09/13/2018 | 09/18/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 09/13/2018 | 09/18/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 09/13/2018 | 09/18/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/13/2018 | 09/18/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 09/13/2018 | 09/19/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 09/13/2018 | 09/14/2018 |
| Note: Held By: AMOBLEY Detached garages can not exceed a total of 500sqft Elevation page shows two left side elevations of the detached garage please correct Provide a copy of approval letter from the ARB stating that they approve a detached garage |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/10/2019 |
| REINSPECTION FEE | ¤40.00 | 07/10/2019 |
| REINSPECTION FEE | ¤40.00 | 07/10/2019 |
| REINSPECTION FEE | ¤40.00 | 07/10/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,050.00 | 11/26/2018 |
| SITE PLAN 20 | ¤20.00 | 11/26/2018 |
| SURCHARGE FS 533.721 | ¤24.25 | 11/26/2018 |
| SURCHARGE - FS 468.631 | ¤36.38 | 11/26/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/26/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 11/26/2018 |
| ADMIN FEE | ¤20.00 | 11/26/2018 |
| ELECTRIC FEE | ¤375.00 | 11/26/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 11/26/2018 |
| IMPACT FEE FIRE | ¤223.38 | 11/26/2018 |
| IMPACT FEE PARKS | ¤849.24 | 11/26/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/26/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 11/26/2018 |
| MECHANICAL FEE | ¤375.00 | 11/26/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/26/2018 |
| PLAN CHECK FEE | ¤210.00 | 11/26/2018 |
| PLUMBING FEE | ¤375.00 | 11/26/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,257.64 |