I want to search for...

Permit #2018090425

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0640
CONDITIONED SPACE: 2947 sqft
GARAGE: 994 sqft
OPENED PORCH (WITH ROOF) : 418 sqft
OPENED PORCH (WITH ROOF) : 81 sqft
GARAGE: 500 sqft
Total Square Footage: 4940 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-947-4481
Location Address: 39 SCARLET OAK CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/26/2018
NOC: RECORDED
Applicant name: ERIC CHRISTOPHER OLSEN
Owner: BROWN TIMOTHY E & JENNIFER F BROWN & CAROLYN E FLE

Address

110 WATERBURY PLACE

LEXINGTON, NC 27292

Lot: 0640
Contracted Stated Job Value: ¤525,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

OLSEN CUSTOM HOMES AND CONSULTING INC
Status Location Address State License Number Phone Fax
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

CGC1508852 (Exp: 08/31/2026) 386-947-4481 (386)947-4484

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
KEITH A BATTERBEE
Status Location Address State License Number Phone
ACTIVE

380 SE 123RD STREET ROAD

OCALA, FL 34480

CCC1326176 (Exp: 08/31/2026) 352-748-6300 X102
MARK A RUGGIERO
Status Location Address State License Number Phone
INACTIVE

411 6TH STREET

HOLLY HILL , FL 32117

01612 (Exp: 07/23/2023) 386-252-5555

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 07/15/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 07/10/2019 CANCELLED BY APPLICANT WEB
ROW- PAVER RESTRAINTS 07/10/2019 APPROVED - AS NOTED RGROSS
Note: SEE NOTES ON SECOND PRE POUR INSPECTION. THIS WAS SCHEDULED THE SAME DAY BY INSPECTOR. ANY QUESTIONS CALL ROBERT 386-793-3980.
ROW- PRE-APRON (PRE-POUR) 07/10/2019 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. BUILDER FAILED TO SCHEDULED THE SECOND PART OF THE PRE POUR TO VERIFY DEPTH OF BASE BEFORE PLACING PAVERS. BUILDER REMOVED PAVERS ENOUGH TO INSPECT FOR COMPLIANCE. NOTE THAT THE FINAL STORMWATER WAS ORIGINALLY FAILED BECAUSE THIS INSPECTION WAS NOT YET APPROVED. BECAUSE THIS IS IN NOW APPROVED AS NOTED ABOVE, THE INSPECTOR RESCHEDULED THE FINAL STORMWATER AND PAVER RESTRAINTS THE SAME DAY AND APPROVED. ONLY FINAL APRON INSPECTION IS NOW PENDING.
ROW - FINAL APRON (AFTER POUR) 07/10/2019 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION. SEE NOTES ON FINAL STORMWATER INSPECTION
ROW - STORMWATER FINAL 07/10/2019 Disapproved - NO FEE RGROSS
Note: SECOND PART OF THE PRE POUR PAVER BASE INSPECTION MUST BE DONE BEFORE THE FINAL STORMWATER AND APRON CAN BE APPROVED. SPOKE TO BUILDER TO PULL PAVERS FOR INSPECTION.
ROW - STORMWATER FINAL 07/10/2019 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. SCHEDULED AND APPROVED AFTER A PREVIOUS FAILED INSPECTION THE SAME DAY. SEE NOTES ON SECOND PART OF THE PRE POUR INSPECTION FOR EXPLAINATION. ANY QUESTIONS CALL ROBERT 386 793-3980
ROW- PAVER RESTRAINTS 07/09/2019 APPROVED RGROSS
BLD - BUILDING FINAL 07/09/2019 APPROVED MWILLIAMS
U-CROSS CONNECTION 07/08/2019 APPROVED LFITZGERALD
ROW- PRE-APRON (PRE-POUR) 07/08/2019 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. THIS INSPECTION WAS TO BE DONE BEFORE THE PAVERS WERE PLACED.
ROW - FINAL APRON (AFTER POUR) 07/08/2019 Disapproved - NO FEE RGROSS
Note: THIS INSPECTION CANNOT BE DONE UNTIL THE SECOND PART OF THE PAVER PRE POUR IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 07/08/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 07/08/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION. SCHEDULED BY INSPECTOR
ROW FIELD SURVEY /GRADING CERTIFICATION 07/02/2019 Disapproved - NO FEE RGROSS
Note: WATER WILL HOLD AGAINST THE FOUNDATION FROM ROOF DRIP EDGE CREATING A WASHOUT NEAR THE FOUNDATION. SEE FIELD SURVEY MARKUP.
FINAL SURVEY (OFFICE USE ONLY) 07/02/2019 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 06/17/2019 Disapproved - NO FEE KHOWELL
Note: THIS IS A REINSPECTION PAVER DRIVEWAY HAS BEEN FINISHED WITHOUT SECOND PRE-POUR ALSO DID NOT HAVE PAVER RESTRAINT INSPECTION PREFORMED
ROW- PRE-APRON (PRE-POUR) 05/02/2019 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR THE APRON POUR ONLY. PAVER DRIVEWAY.
ELECTRIC - EARLY POWER 04/26/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 2:45
GRAVITY SEWER TEST 04/24/2019 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 04/18/2019 Disapproved -FEE REQUIRED JGIBSON
Note: SEWER HAS NEAGITIVE PITCH ON LATERAL BY FRONT HOSE BIB LEADING TO VERTICAL 6''.NO HEAD TEST P-312.6,AND 704.1 SLOPE OF HORIZONTAL DRAINAGE
U - SEWER TIE IN 04/18/2019 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 04/05/2019 APPROVED MWILLIAMS
INSULATION 03/20/2019 APPROVED MWILLIAMS
ALL ROUGH 03/18/2019 APPROVED MWILLIAMS
WALL SHEATHING 03/13/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/13/2019 APPROVED - AS NOTED MWILLIAMS
Note: On residential construction Individual trades inspections should not be called in. An All Rough Inspection is to be called. This inspection covers all trades and final framing. Calling in individual inspections will not advance the job to the next Inspection level which is Insulation. In the future please have all areas completed for an All Rough inspection in call it in as such.
PLUMBING 2ND ROUGH 03/13/2019 APPROVED MWILLIAMS
HVAC ROUGH 03/13/2019 APPROVED MWILLIAMS
ELECTRIC 2ND ROUGH 03/13/2019 APPROVED MWILLIAMS
GAS ROUGH 03/01/2019 APPROVED MWILLIAMS
ROOF VALLEY & METAL 02/25/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2019 Disapproved - NO FEE WMILLER
Note: NEEDS STRAPS AT BEARING HEADERS TO GO GO UP AND OVER FROM JACK TO JACK AND ADD MISSING H2.5 PER PLANS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/18/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS ASSIGNED TO INSPECTOR DR I WAS CLOSER SO I TOOK IT THERE WAS NO APPROVED PAPERWORK ON SIGHT PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need the APPROVED paperwork on site at time of final)
ELEV CERT-FOUNDATION APPROVAL 02/15/2019 APPROVED JMYERS
ELECTRIC-TUG 02/05/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 2:50
TIE BEAM / LINTEL 01/28/2019 APPROVED WMILLER
Note: approved
TIE BEAM / LINTEL 01/22/2019 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 01/18/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 12/28/2018 APPROVED WMILLER
Note: APPROVED
MONOLITHIC SLAB 12/27/2018 Disapproved -FEE REQUIRED WMILLER
Note: not ready still working still digging still placing horizontal and vertical reinforcement
PLUMBING 1ST ROUGH UNDERGROUND 12/11/2018 APPROVED JGIBSON

Review History

Department Status Date In Date Out
PLFM COMPLETE 07/12/2019 07/12/2019
Note: Released By: JMYERS The Final elevation certificate has been accepted.
PLFM HOLD 07/01/2019 07/02/2019
Note: Held By: JMYERS The address cannot be hand written in and it needs to be on all pages of the elevation certificate.
ZON COMPLETE 02/25/2019 02/25/2019
Note: Released By: AMOBLEY
PLUM COMPLETE 02/19/2019 02/26/2019
Note: Released By: JHINDMAN
ZON HOLD 02/19/2019 02/19/2019
Note: Held By: AMOBLEY Please show the tank location of the site/survey with setbacks for zoning to review
PLFM COMPLETE 02/15/2019 02/15/2019
Note: Released By: JMYERS The Building elevation certificate submitted has been accepted. However, at Final a hand written in address will not be accepted.
SW1 COMPLETE 01/15/2019 01/18/2019
Note: Released By: JHINDMAN foundation
BLD COMPLETE 11/19/2018 11/26/2018
Note: Released By: RLEE
ZON COMPLETE 11/19/2018 11/19/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 11/13/2018 11/13/2018
Note: Released By: DREWIS Updated pg 5 Electrical plan.
ZON HOLD 11/08/2018 11/09/2018
Note: Held By: AMOBLEY We have a copy of the MPD. We need an actual approval letter from the architectural review board stating that they approve the detached garage along with the attached garage Please submit a new landscape plan matching the new layout Total area calculations on floor plan page do not add up correctly
ELEC HOLD 11/08/2018 11/13/2018
Note: Held By: DREWIS Master bathroom counter top GFCI is too far from the sink, NEC 2014 210.52D. Daniel Rewis 986-4736
UTL COMPLETE 11/08/2018 11/14/2018
Note: Released By: MBACON
SW1 COMPLETE 11/08/2018 11/13/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 11/08/2018 11/08/2018
Note: Released By: TBAKER
BLD COMPLETE 11/08/2018 11/16/2018
Note: Released By: RLEE
MECH COMPLETE 11/08/2018 11/16/2018
Note: Released By: RLEE
ZON HOLD 10/12/2018 10/12/2018
Note: Held By: TAWILLIAMS REPEAT COMMENTS: Detached garages can not exceed a total of 500 sq ft Provide a copy of approval letter from the ARB stating that they approve a detached garage
BLD COMPLETE 10/12/2018 10/18/2018
Note: Released By: JHINDMAN
ELEC HOLD 10/12/2018 10/16/2018
Note: Held By: DREWIS Master bathroom counter top GFCI is too far from the sink, NEC 2014 210.52D. Daniel Rewis 986-4736
PLFM COMPLETE 09/14/2018 09/14/2018
Note: Released By: JMYERS The Construction elevation certificate submitted has been deemed acceptable. Please provide Building and Final elevation certificates prior to receiving CO.
BLD HOLD 09/13/2018 09/18/2018
Note: Held By: JHINDMAN 1. Provide the correct code references on page 2 (roof note) and page 7(sheathing nailing) 2017 6th edition florida Building Code. J. hindman 986-3784.
ELEC HOLD 09/13/2018 09/18/2018
Note: Held By: DREWIS Provide a plan with a darker outine of the proposed residence, it does not show clearly. Daniel Rewis 986-4736
ENGIN1 COMPLETE 09/13/2018 09/18/2018
Note: Released By: TBAKER
MECH COMPLETE 09/13/2018 09/18/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 09/13/2018 09/18/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 09/13/2018 09/18/2018
Note: Released By: DREWIS
UD1 COMPLETE 09/13/2018 09/19/2018
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON HOLD 09/13/2018 09/14/2018
Note: Held By: AMOBLEY Detached garages can not exceed a total of 500sqft Elevation page shows two left side elevations of the detached garage please correct Provide a copy of approval letter from the ARB stating that they approve a detached garage

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/10/2019
REINSPECTION FEE ¤40.00 07/10/2019
REINSPECTION FEE ¤40.00 07/10/2019
REINSPECTION FEE ¤40.00 07/10/2019
NEW RESIDENTIAL INSPECTIONS ¤1,050.00 11/26/2018
SITE PLAN 20 ¤20.00 11/26/2018
SURCHARGE FS 533.721 ¤24.25 11/26/2018
SURCHARGE - FS 468.631 ¤36.38 11/26/2018
STORM WATER PERMIT FEES ¤80.00 11/26/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 11/26/2018
ADMIN FEE ¤20.00 11/26/2018
ELECTRIC FEE ¤375.00 11/26/2018
3% FIRE IMPACT FEE CREDIT (¤6.70) 11/26/2018
IMPACT FEE FIRE ¤223.38 11/26/2018
IMPACT FEE PARKS ¤849.24 11/26/2018
IMPACT FEE SCHOOL ¤3,600.00 11/26/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 11/26/2018
MECHANICAL FEE ¤375.00 11/26/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 11/26/2018
PLAN CHECK FEE ¤210.00 11/26/2018
PLUMBING FEE ¤375.00 11/26/2018
Fees Total Due: ¤0.00 Total Paid: ¤10,257.64