I want to search for...
Permit #2018090861
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00020-0030 |
| CONDITIONED SPACE: 2443 sqft |
| CONDITIONED SPACE: 269 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| GARAGE: 764 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00020 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 14 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/05/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
YUVAL BOTANSKY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/30/2019 | APPROVED | MWILLIAMS |
| U-CROSS CONNECTION | 05/30/2019 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 05/30/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: SPOKE TO MASON AND TOLD HIM TO GRADE OUT THE BARE AREAS ON VACANT LOT TO RIGHT AND AREA IN THE REAR AND COVER WITH PINE STRAW AND SOD THE END OF THE SIDEWALK AND CALL ME WHEN IT IS DONE | |||
| ROW - STORMWATER FINAL | 05/30/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 05/30/2019 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 05/29/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/28/2019 | Disapproved - NO FEE | KHOWELL |
| Note: SEE NOTES ON SURVEY | |||
| ROW- PRE-APRON (PRE-POUR) | 05/10/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 05/08/2019 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 05/08/2019 | CANCELLED BY APPLICANT | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 05/08/2019 | PARTIALLY APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION APRON AND PART OF SIDEWALK | |||
| ELECTRIC - EARLY POWER | 05/02/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:00 | |||
| ELECTRIC-TUG | 05/02/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:00 | |||
| GRAVITY SEWER TEST | 04/18/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/18/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: video sent of u-tie in | |||
| LATH/BRICK/ WATER BARRIER | 04/17/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 04/10/2019 | Disapproved - NO FEE | WMILLER |
| Note: STUCCO STOP NEEDED AT WALL TO ROOF INTERSECTIONS. | |||
| INSULATION | 03/20/2019 | APPROVED | MWILLIAMS |
| INSULATION | 03/15/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: job not ready insulation incomplete | |||
| TIE BEAM / LINTEL | 03/13/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 03/13/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 03/08/2019 | APPROVED | MWILLIAMS |
| GAS ROUGH | 02/22/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED BOND WIRE BY GAS FINAL | |||
| ROOF SHEATHING | 01/29/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 01/11/2019 | APPROVED | WMILLER |
| Note: APPROVED | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/10/2019 | APPROVED | RLEE |
| MONOLITHIC SLAB | 12/17/2018 | APPROVED | MWILLIAMS |
| MONOLITHIC SLAB | 12/14/2018 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: no plans or permit posted on job. PLACEMENT OF PERMIT, 105.7 SHALL BE KEPT ON SITE DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| MONOLITHIC SLAB | 12/13/2018 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/12/2018 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 11/15/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED TEMP POLE 3:50 | |||
| FOOTER | 11/14/2018 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/15/2019 | 01/23/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 01/07/2019 | 01/10/2019 |
| Note: Released By: RLEE Foundation Survey | |||
| BLD | COMPLETE | 11/30/2018 | 12/07/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 10/02/2018 | 10/04/2018 |
| Note: Released By: DREWIS | |||
| ELEC | COMPLETE | 10/02/2018 | 10/04/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 10/02/2018 | 10/05/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 10/02/2018 | 10/02/2018 |
| Note: Released By: AMOBLEY | |||
| URB | COMPLETE | 09/25/2018 | 09/25/2018 |
| Note: Released By: JBEAUDET | |||
| BLD | HOLD | 09/24/2018 | 09/28/2018 |
| Note: Held By: JHINDMAN 1. Provide pages s-4 and s-5 that are deasigned to the 6th edition Florida Building Code 2017. J. hindman 986-3784. | |||
| ELEC | HOLD | 09/24/2018 | 09/27/2018 |
| Note: Held By: DREWIS Provide and additonal receptacle to the left of the sliding glass door within the pool house, NEC 2014 210.52. Please reference the Building Services portion of the cityofpalmcoastgov.com website to view this notation. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 09/24/2018 | 09/25/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 09/24/2018 | 09/28/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 09/24/2018 | 09/28/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 09/24/2018 | 09/27/2018 |
| Note: Held By: DREWIS Left rear elevation of 23.9' allows flow from the adjacent lot, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Please reference the Building Services portion of the cityofpalmcoastgov.com website to view this site plan notation. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 09/24/2018 | 10/01/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 09/24/2018 | 09/25/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/09/2019 |
| REINSPECTION FEE | ¤40.00 | 12/17/2018 |
| REVISION | ¤40.00 | 12/17/2018 |
| SITE PLAN 20 | ¤20.00 | 10/05/2018 |
| SURCHARGE FS 533.721 | ¤17.07 | 10/05/2018 |
| SURCHARGE - FS 468.631 | ¤25.60 | 10/05/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/05/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/05/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤708.00 | 10/05/2018 |
| ADMIN FEE | ¤20.00 | 10/05/2018 |
| ELECTRIC FEE | ¤272.40 | 10/05/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/05/2018 |
| IMPACT FEE FIRE | ¤218.79 | 10/05/2018 |
| IMPACT FEE PARKS | ¤849.24 | 10/05/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/05/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/05/2018 |
| MECHANICAL FEE | ¤272.40 | 10/05/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/05/2018 |
| PLAN CHECK FEE | ¤141.60 | 10/05/2018 |
| PLUMBING FEE | ¤272.40 | 10/05/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,477.03 |