I want to search for...

Permit #2018091011

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00040-0020
CONDITIONED SPACE: 2632 sqft
GARAGE: 705 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
Total Square Footage: 3740 sqft
Block: 00040
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 32 NEW WATER OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/25/2018
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0020
Contracted Stated Job Value: ¤265,000.00
Job Description: Single Family Residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/29/2020 FINAL APPROVED FWILLIS
ROW - FINAL APRON (AFTER POUR) 07/29/2020 APPROVED KHOWELL
ROW - STORMWATER FINAL 07/29/2020 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 07/28/2020 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 07/28/2020 APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 07/27/2020 APPROVED - AS NOTED KHOWELL
Note: SIDEWALK NEEDS TO BE REPAIRED PRIOR TO CALLING IN AFTRE POUR AND ROW STORMWATER INSPECTIONS ARE CALLED IN
FINAL SURVEY (OFFICE USE ONLY) 07/27/2020 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 07/16/2020 APPROVED KHOWELL
Note:
ROW- PAVER RESTRAINTS 07/06/2020 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 07/06/2020 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK, APRON AND PAVER RESTRAINT POUR APPROVED
ELECTRIC - EARLY POWER 06/15/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 3:20
GRAVITY SEWER TEST 05/14/2020 APPROVED JGIBSON
U - SEWER TIE IN 05/14/2020 APPROVED JGIBSON
INSULATION 03/25/2020 APPROVED JDELBONIS
LATH/BRICK/ WATER BARRIER 03/23/2020 APPROVED JDELBONIS
ALL ROUGH 03/19/2020 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/19/2020 APPROVED JDELBONIS
ROOF VALLEY & METAL 02/18/2020 APPROVED JDELBONIS
ROOF SHEATHING 02/10/2020 APPROVED JDELBONIS
ELECTRIC-TUG 02/06/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:30
TIE BEAM / LINTEL 01/29/2020 APPROVED JDELBONIS
FOUND SURVEY APPROVED (OFFICE) 01/28/2020 APPROVED TBAKER
MONOLITHIC SLAB 12/18/2019 APPROVED - AS NOTED FWILLIS
Note: Need COMPACTION results in construction box for next Inspection.
PLUMBING 1ST ROUGH UNDERGROUND 12/17/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 12/17/2019 APPROVED CSTONE
FOOTER 11/25/2019 APPROVED JDELBONIS

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/24/2020 01/28/2020
Note: Released By: TBAKER
ENGIN1 HOLD 01/16/2020 01/17/2020
Note: Held By: TBAKER Foundation Survey - please include slab elevation at garage
BLD HOLD 12/21/2018 01/03/2019
Note: Held By: JHINDMAN Provide a digitally signed and sealed plan or letter. Digital signatures must comply with Florida Statues Chapter 481 and Florida Administrative Rule 61G1-16.005 for architects or Florida Statutes Chapter 471 and Florida Administrative Rule 61G15-23.003 for Engineers. The following statement must accompany a digital signature “This item has been electronically signed and sealed by (name) On (date) using a Digital Signature”. Certificate Authority services can be purchased through a third party certification authority to include, but not limited to: • • Entrust • • eTrust • • GeoTrust • • GlobalSign • • IdenTrust • • Verisign A digitally created image of the seal must be on the plans for printing purposes. J. Hindman 986-3784.
ZON COMPLETE 10/12/2018 10/15/2018
Note: Released By: AMOBLEY
BLD COMPLETE 09/27/2018 10/03/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 09/27/2018 10/02/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 09/27/2018 09/28/2018
Note: Released By: TBAKER
MECH COMPLETE 09/27/2018 10/03/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 09/27/2018 10/03/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 09/27/2018 10/02/2018
Note: Released By: DREWIS
UD1 COMPLETE 09/27/2018 10/03/2018
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 09/27/2018 09/27/2018
Note: Held By: AMOBLEY Area calculations are incorrect on floor plan page
URB COMPLETE 09/27/2018 10/12/2018
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 07/21/2020
EXTENSION ¤40.00 07/21/2020
EXTENSION ¤40.00 07/21/2020
3% FIRE IMPACT FEE CREDIT (¤6.56) 10/25/2018
IMPACT FEE FIRE ¤218.79 10/25/2018
IMPACT FEE PARKS ¤849.24 10/25/2018
IMPACT FEE SCHOOL ¤3,600.00 10/25/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 10/25/2018
MECHANICAL FEE ¤262.20 10/25/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/25/2018
PLAN CHECK FEE ¤134.80 10/25/2018
PLUMBING FEE ¤262.20 10/25/2018
NEW RESIDENTIAL INSPECTIONS ¤674.00 10/25/2018
SITE PLAN 20 ¤20.00 10/25/2018
SURCHARGE FS 533.721 ¤16.35 10/25/2018
SURCHARGE - FS 468.631 ¤24.53 10/25/2018
STORM WATER PERMIT FEES ¤80.00 10/25/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 10/25/2018
ADMIN FEE ¤20.00 10/25/2018
ELECTRIC FEE ¤262.20 10/25/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,403.84