I want to search for...
Permit #2018091012
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00040-0030 |
| CONDITIONED SPACE: 269 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| GARAGE: 764 sqft |
| CONDITIONED SPACE: 2443 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00040 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 34 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/15/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤285,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/22/2020 | FINAL APPROVED | JDELBONIS |
| U-CROSS CONNECTION | 04/21/2020 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 04/21/2020 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 04/21/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: INFORMED BY THE SUPERINTENDENT THAT FPL CABINET WILL BE RAISED TO THE CORRECT GRADE IN JUNE | |||
| U -UTILITY RESIDENTIAL FINAL | 04/21/2020 | FINAL APPROVED | LFITZGERALD |
| Note: first water meter box was low so a 2nd box was addded on top so as to be flush with grades | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/20/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: FPL CABINET ON THE FRONT LEFT SIDE OF THE PROPERTY WILL NEED TO BE RAISED BEFORE FINAL INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/20/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/13/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: NOT ALL THE SOD IS DOWN. WILL NEED UPDATED ELEVATIONS | |||
| ELECTRIC - EARLY POWER | 04/07/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:10....DID THIS INSPECTION ON 4/6/20 | |||
| TIE BEAM / LINTEL | 03/30/2020 | APPROVED | JDELBONIS |
| ROW- PRE-APRON (PRE-POUR) | 03/19/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 03/19/2020 | APPROVED | MMAJEWSKI |
| ROW- PRE-APRON (PRE-POUR) | 03/13/2020 | PARTIALLY APPROVED | MMAJEWSKI |
| Note: READY TO POUR PAVER RESTRAINTS APRON AND SIDEWALK | |||
| ROOF SHEATHING | 03/12/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION this was aproved by me during last inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/12/2020 | APPROVED | JDELBONIS |
| Note: this was aproved by me during last inspection | |||
| GRAVITY SEWER TEST | 03/11/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 03/11/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 02/14/2020 | APPROVED | JDELBONIS |
| INSULATION | 02/05/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 02/03/2020 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 01/14/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 01/08/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:30 | |||
| ELECTRIC-TUG | 01/03/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: UFER GROUND CONNECTION NEEDS TO BE ACCESSIBLE. NEC 250.68A | |||
| ROOF SHEATHING | 12/23/2019 | PARTIALLY APPROVED | JDELBONIS |
| Note: roof sheating only | |||
| TIE BEAM / LINTEL | 12/17/2019 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 12/12/2019 | APPROVED | CTROHA |
| MONOLITHIC SLAB | 12/05/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 11/27/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: 1816.1.7 FBC Termite Protection intention of or completion prior to slab. R318.1.7 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/22/2019 | APPROVED | JGIBSON |
| FOOTER | 10/30/2019 | APPROVED | MWILLIAMS |
| WATER METER INSTALLATION REQUEST | 10/30/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/22/2020 | 04/22/2020 |
| Note: Released By: PBUCKLEY Contractor never provided a proper digitally signed document per the previous review hold. Considering the State has suspended rules requiring digital or manually applied signatures as part of the COVID 19 response, I have decided to accept this manually signed / sealed letter that was sent electronically consistent with the suspension of the rules. | |||
| ENGIN1 | COMPLETE | 12/11/2019 | 12/12/2019 |
| Note: Released By: CTROHA | |||
| BLD | HOLD | 12/21/2018 | 01/03/2019 |
| Note: Held By: JHINDMAN Provide a digitally signed and sealed plan or letter. Digital signatures must comply with Florida Statues Chapter 481 and Florida Administrative Rule 61G1-16.005 for architects or Florida Statutes Chapter 471 and Florida Administrative Rule 61G15-23.003 for Engineers. The following statement must accompany a digital signature “This item has been electronically signed and sealed by (name) On (date) using a Digital Signature”. Certificate Authority services can be purchased through a third party certification authority to include, but not limited to: • • Entrust • • eTrust • • GeoTrust • • GlobalSign • • IdenTrust • • Verisign A digitally created image of the seal must be on the plans for printing purposes. J. Hindman 986-3784. | |||
| BLD | COMPLETE | 09/27/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 09/27/2018 | 10/02/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 09/27/2018 | 09/28/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 09/27/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 09/27/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/27/2018 | 10/02/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 09/27/2018 | 10/03/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 09/27/2018 | 09/27/2018 |
| Note: Released By: AMOBLEY | |||
| URB | COMPLETE | 09/27/2018 | 10/12/2018 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 04/21/2020 |
| EXTENSION | ¤40.00 | 04/21/2020 |
| REINSPECTION FEE | ¤40.00 | 04/21/2020 |
| REINSPECTION FEE | ¤40.00 | 04/21/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤570.00 | 10/15/2018 |
| SITE PLAN 20 | ¤20.00 | 10/15/2018 |
| SURCHARGE FS 533.721 | ¤14.17 | 10/15/2018 |
| SURCHARGE - FS 468.631 | ¤21.26 | 10/15/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/15/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/15/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/15/2018 |
| IMPACT FEE FIRE | ¤218.79 | 10/15/2018 |
| IMPACT FEE PARKS | ¤849.24 | 10/15/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/15/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/15/2018 |
| MECHANICAL FEE | ¤231.00 | 10/15/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/15/2018 |
| PLAN CHECK FEE | ¤114.00 | 10/15/2018 |
| PLUMBING FEE | ¤231.00 | 10/15/2018 |
| ADMIN FEE | ¤20.00 | 10/15/2018 |
| ELECTRIC FEE | ¤231.00 | 10/15/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,219.99 |