Permit #2018091103
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00040-0040 |
| CONDITIONED SPACE: 2445 sqft |
| OPENED PORCH (WITH ROOF) : 324 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| GARAGE: 686 sqft |
| Total Square Footage: 3497 sqft |
| Block: 00040 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 36 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/25/2018 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤245,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/23/2020 | FINAL APPROVED | TSTAUFFACHER |
| Note: Plug at fridge sidewall should be addressed. | |||
| U-CROSS CONNECTION | 09/04/2020 | APPROVED - AS NOTED | JHARDING |
| Note: Approved. No cross connections | |||
| ROW - FINAL APRON (AFTER POUR) | 09/04/2020 | APPROVED | KHOWELL |
| ROW - STORMWATER FINAL | 09/04/2020 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 09/04/2020 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/14/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: REPAIR EROSION ALONG THE PROPERTY LINE ON BOTH SIDES AND GET THE IRRIGATION METER BOX BROUGHT UO TO GRADE PRIOR TO CALLING IN ROW AND AFTER POUR INSPECTIONS | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/14/2020 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 06/17/2020 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 06/15/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:20 | |||
| ROW- PRE-APRON (PRE-POUR) | 06/11/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: READY TO POUR APRON, PAVER RESTRAINTS, AND SIDEWALK | |||
| U - SEWER TIE IN | 05/14/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/14/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/29/2020 | APPROVED | JDELBONIS |
| INSULATION | 04/28/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 04/24/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION no dryer vent no 5 foot head preshure mastic needs sealing avound celing fans electrion has to install boxes for kitchen oulet and bedroom oulet and tuck wires in box in other room | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/24/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 04/16/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: no dryer vent no 5 foot head preshure mastic needs sealing avound celing fans electrion has to install boxes for kitchen oulet and bedroom oulet and tuck wires in box in other room | |||
| ELECTRIC-TUG | 04/06/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:35 | |||
| ELECTRIC-TUG | 03/20/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: GROUNDING ELECTRODE CONDUCTOR NOT CONNECTED TO STEEL PER PLAN, OR AT ALL NEC 250 | |||
| ROOF VALLEY & METAL | 03/18/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING | 03/13/2020 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 03/03/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/02/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/13/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/10/2020 | APPROVED | JGIBSON |
| ELECTRIC-TUG | 01/31/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:45 | |||
| WATER METER INSTALLATION REQUEST | 01/30/2020 | APPROVED | CSTONE |
| FOOTER | 01/22/2020 | APPROVED | JDELBONIS |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/14/2020 | 09/21/2020 |
| Note: Released By: FREODICA Revision: submitted plans are the same as original plans. There were no changes per Judy Torres of ABD. The building hold on 12-21-18 was pertaining to digital signature on the revision which was not resolve but inspection was alredy completed. | |||
| ENGIN1 | COMPLETE | 02/27/2020 | 03/02/2020 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 12/21/2018 | 01/03/2019 |
| Note: Held By: JHINDMAN Provide a digitally signed and sealed plan or letter. Digital signatures must comply with Florida Statues Chapter 481 and Florida Administrative Rule 61G1-16.005 for architects or Florida Statutes Chapter 471 and Florida Administrative Rule 61G15-23.003 for Engineers. The following statement must accompany a digital signature “This item has been electronically signed and sealed by (name) On (date) using a Digital Signature”. Certificate Authority services can be purchased through a third party certification authority to include, but not limited to: • • Entrust • • eTrust • • GeoTrust • • GlobalSign • • IdenTrust • • Verisign A digitally created image of the seal must be on the plans for printing purposes. J. Hindman 986-3784. | |||
| ZON | COMPLETE | 10/12/2018 | 10/15/2018 |
| Note: Released By: TAWILLIAMS | |||
| BLD | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 09/28/2018 | 10/08/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 09/28/2018 | 10/03/2018 |
| Note: Released By: MBACON | |||
| ZON | HOLD | 09/28/2018 | 09/28/2018 |
| Note: Held By: AMOBLEY Banding should wrap entire window in front | |||
| URB | COMPLETE | 09/28/2018 | 10/12/2018 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 09/15/2020 |
| EXTENSION | ¤40.00 | 09/15/2020 |
| EXTENSION | ¤40.00 | 09/15/2020 |
| EXTENSION | ¤40.00 | 09/15/2020 |
| REINSPECTION FEE | ¤40.00 | 09/15/2020 |
| REINSPECTION FEE | ¤40.00 | 09/15/2020 |
| METER - DEPOSIT | ¤60.00 | 09/15/2020 |
| METER - DEPOSIT | (¤60.00) | 09/15/2020 |
| WATER-METER | (¤412.87) | 09/15/2020 |
| WATER-METER | (¤342.99) | 09/15/2020 |
| WATER-METER | ¤434.59 | 09/15/2020 |
| WATER-METER | ¤361.04 | 09/15/2020 |
| CONNECTION FEES | (¤25.00) | 09/15/2020 |
| CONNECTION FEES | ¤25.00 | 09/15/2020 |
| SEWER INSPECTION | ¤25.00 | 09/15/2020 |
| SEWER INSPECTION | (¤25.00) | 09/15/2020 |
| ELECTRIC FEE | ¤248.40 | 10/25/2018 |
| ADMIN FEE | ¤20.00 | 10/25/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤628.00 | 10/25/2018 |
| SITE PLAN 20 | ¤20.00 | 10/25/2018 |
| SURCHARGE FS 533.721 | ¤15.39 | 10/25/2018 |
| SURCHARGE - FS 468.631 | ¤23.08 | 10/25/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/25/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 10/25/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/25/2018 |
| IMPACT FEE FIRE | ¤218.79 | 10/25/2018 |
| IMPACT FEE PARKS | ¤849.24 | 10/25/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/25/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 10/25/2018 |
| MECHANICAL FEE | ¤248.40 | 10/25/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/25/2018 |
| PLAN CHECK FEE | ¤125.60 | 10/25/2018 |
| PLUMBING FEE | ¤248.40 | 10/25/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,464.60 |