I want to search for...

Permit #2018100069

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00010-0070
CONDITIONED SPACE: 582 sqft
CONDITIONED SPACE: 1924 sqft
CONDITIONED SPACE: 269 sqft
GARAGE: 725 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
OPENED PORCH (WITH ROOF) : 421 sqft
Total Square Footage: 4012 sqft
Block: 00010
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 13 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/19/2018
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0070
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
YUVAL BOTANSKY
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/20/2019 FINAL APPROVED JDELBONIS
U-CROSS CONNECTION 12/17/2019 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 12/17/2019 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 12/17/2019 APPROVED MMAJEWSKI
U -UTILITY RESIDENTIAL FINAL 12/17/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 10/16/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 10/16/2019 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 09/09/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 08/28/2019 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 08/28/2019 PARTIALLY APPROVED KHOWELL
Note: APRON AND SIDEWALK POUR PAVER UPPER
U - SEWER TIE IN 08/13/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 08/13/2019 APPROVED JGIBSON
ELECTRIC - EARLY POWER 07/17/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 2:45
TIE BEAM / LINTEL 05/14/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 04/30/2019 APPROVED MWILLIAMS
INSULATION 04/24/2019 APPROVED MWILLIAMS
ALL ROUGH 04/22/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/16/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION the following notes from prior inspection by inspector MW were not resolved MUST LEAVE SHEATHING OFF OF FRONT ENTRY TO SEE CONNECTIONS .
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/02/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: MUST LEAVE SHEATHING OFF OF FRONT ENTRY TO SEE CONNECTIONS .
GAS ROUGH 04/02/2019 APPROVED - AS NOTED JGIBSON
Note: NEED BOND WIRE BY GAS FINAL
ROOF VALLEY & METAL 04/02/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/29/2019 Disapproved -FEE REQUIRED JHINDMAN
Note: loose bolts in living room bearing wall.
ROOF SHEATHING 02/26/2019 APPROVED MWILLIAMS
ELECTRIC-TUG 02/19/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG 3:00
TIE BEAM / LINTEL 01/28/2019 PARTIALLY APPROVED MWILLIAMS
Note: need to have courtyard wall inspected for lintel Wall left out for pool construction. ok to proceed with the rest of the home.
MONOLITHIC SLAB 01/17/2019 APPROVED MWILLIAMS
PLUMBING 1ST ROUGH UNDERGROUND 01/15/2019 APPROVED JGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 01/14/2019 Disapproved -FEE REQUIRED JGIBSON
Note: NO STAMPED PLANS ON JOB SITE, ALL APPROVED PAPER WORK NEEDS TO BE ON SITE FOR INSPECTION
FOUND SURVEY APPROVED (OFFICE) 01/10/2019 APPROVED RLEE
FOOTER 11/28/2018 APPROVED - AS NOTED WMILLER
Note: STEM WALL FOOTING WAS MISSING THREE VERTICLE REINFORCEMENT RODS (I WAITED ON SITE WHILE THEY WERE ADDED)

Review History

Department Status Date In Date Out
BLD CANCEL 12/19/2019 12/19/2019
BLD COMPLETE 01/10/2019 01/17/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 01/07/2019 01/10/2019
Note: Released By: RLEE Foundation S
BLD HOLD 12/21/2018 01/03/2019
Note: Held By: JHINDMAN Provide a digitally signed and sealed plan or letter. Digital signatures must comply with Florida Statues Chapter 481 and Florida Administrative Rule 61G1-16.005 for architects or Florida Statutes Chapter 471 and Florida Administrative Rule 61G15-23.003 for Engineers. The following statement must accompany a digital signature “This item has been electronically signed and sealed by (name) On (date) using a Digital Signature”. Certificate Authority services can be purchased through a third party certification authority to include, but not limited to: • • Entrust • • eTrust • • GeoTrust • • GlobalSign • • IdenTrust • • Verisign A digitally created image of the seal must be on the plans for printing purposes. J. Hindman 986-3784.
BLD COMPLETE 11/09/2018 11/17/2018
Note: Released By: RLEE
ELEC COMPLETE 11/09/2018 11/14/2018
Note: Released By: DREWIS
ELEC COMPLETE 10/10/2018 10/15/2018
Note: Released By: DREWIS
BLD COMPLETE 10/02/2018 10/04/2018
Note: Released By: RLEE
ELEC HOLD 10/02/2018 10/05/2018
Note: Held By: DREWIS Additional receptacles needed on the kitchen counter top, NEC 2014 210.52C. Daniel Rewis 986-4736
ENGIN1 COMPLETE 10/02/2018 10/08/2018
Note: Released By: TBAKER
MECH COMPLETE 10/02/2018 10/04/2018
Note: Released By: RLEE
PLUM COMPLETE 10/02/2018 10/04/2018
Note: Released By: RLEE
SW1 COMPLETE 10/02/2018 10/05/2018
Note: Released By: DREWIS
UD1 COMPLETE 10/02/2018 10/08/2018
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 10/02/2018 10/02/2018
Note: Released By: AMOBLEY
URB COMPLETE 10/02/2018 10/10/2018
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/20/2019
REINSPECTION FEE ¤40.00 12/20/2019
REINSPECTION FEE ¤40.00 12/20/2019
REINSPECTION FEE ¤40.00 12/20/2019
REVISION ¤40.00 12/20/2019
REVISION ¤40.00 12/20/2019
SITE PLAN 20 ¤20.00 10/19/2018
SURCHARGE FS 533.721 ¤17.28 10/19/2018
SURCHARGE - FS 468.631 ¤25.92 10/19/2018
STORM WATER PERMIT FEES ¤80.00 10/19/2018
3% TRANS IMPACT FEE CREDIT (¤89.43) 10/19/2018
NEW RESIDENTIAL INSPECTIONS ¤718.00 10/19/2018
ADMIN FEE ¤20.00 10/19/2018
ELECTRIC FEE ¤275.40 10/19/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 10/19/2018
IMPACT FEE FIRE ¤218.79 10/19/2018
IMPACT FEE PARKS ¤849.24 10/19/2018
IMPACT FEE SCHOOL ¤3,600.00 10/19/2018
IMPACT FEE TRANSPORTATION ¤2,981.00 10/19/2018
MECHANICAL FEE ¤275.40 10/19/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/19/2018
PLAN CHECK FEE ¤143.60 10/19/2018
PLUMBING FEE ¤275.40 10/19/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,618.56