Permit #2018100176
Permit Details
Status: FINAL
| Parcel Id: 15-11-31-2970-00000-1440 |
| Block: 00000 |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: 386-566-7804 |
| Location Address: 12 NORTH PARK CIR |
| Type: DR - DRIVEWAY |
| Issue Date: 10/29/2018 |
| NOC: RECORDED |
| Applicant name: ERIC KACHNYCZ |
| Owner: MYERS RICKY B & KATHY V H&W |
|
Address 12 NORTH PARK CIRCLE PALM COAST, FL 32137 |
| Lot: 1440 |
| Contracted Stated Job Value: ¤5,490.00 |
| Job Description: PAVER INSTALLATION- DRIVEWAY, WALKWAY AND FRONT ENTRY |
| Type: CN |
Contractor
DONE RIGHT SINCE 1985
| Status | Location Address | Phone |
| ACTIVE |
1405 KINGS ESTATE RD ST AUGUSTINE, FL 32086 |
(904) 533-6373 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 11/28/2018 | FINAL APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 11/28/2018 | FINAL APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 11/28/2018 | FINAL APPROVED | LFITZGERALD |
| ROW- PRE-APRON (PRE-POUR) | 11/05/2018 | APPROVED | RGROSS |
| Note: READY FOR PAVERS |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/04/2018 | 10/08/2018 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 10/04/2018 | 10/08/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 10/04/2018 | 10/10/2018 |
| Note: Released By: MBACON All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ZON | COMPLETE | 10/04/2018 | 10/05/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 10/29/2018 |
| SITE PLAN 20 | ¤20.00 | 10/29/2018 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/29/2018 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/29/2018 |
| STORM WATER PERMIT FEES | ¤40.00 | 10/29/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.00 |