I want to search for...
Permit #2018100364
Permit Details
Status: COED
| Parcel Id: 06-12-31-5815-00000-0010 |
| Block: 00000 |
| Subdivision: 2118 - TOWN CENTER PHASE I |
| Job Phone: 386-238-1570 |
| Location Address: 800 BELLE TERRE PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 12/21/2018 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: REAL SUB LLC |
|
Address PO BOX 32018 LAKELAND, FL 33802 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤79,810.00 |
| Job Description: UNIT 110- "SOUTHERN WIND ANIMAL HOSPITAL" |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Sub Contractors
MIKE F WHALEY
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
804 Root Street Daytona Beach, FL 32114 |
EC0001334 (Exp: 08/31/2026) | (386) 252-2287 | (386)257-1920 |
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1709 North Nova Road Holly Hill, 32117 |
CFC1426839 (Exp: 08/31/2026) | (386) 257-1172 | 386-252-5979 |
STEVEN KEITH JONES
| Status | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
345 MADISON AVE DAYTONA BEACH, FL 32114 |
CMC057027 (Exp: 08/31/2026) | (386)253-7774 | (386)255-9431 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC FINAL | 04/17/2019 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | 04/17/2019 | FINAL APPROVED | JNICHOLS |
| PLUMBING FINAL | 04/02/2019 | CANCELLED BY APPLICANT | WEB |
| PLUMBING FINAL | 04/01/2019 | APPROVED | JGIBSON |
| ELECTRIC FINAL | 04/01/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED APPROVED REVISION SHOWING CHANGE ON X-RAY BREAKER SIZE/CONDUCTOR SIZE, AND 1PHASE TO 3PHASE | |||
| BUILDING FINAL | 04/01/2019 | FINAL APPROVED | WMILLER |
| Note: pending electric final approval | |||
| FIRE FINAL | 04/01/2019 | APPROVED | WMILLER |
| ABOVE CEILING | 03/05/2019 | APPROVED | JHINDMAN |
| ELECTRIC FINAL | 03/05/2019 | CANCELLED BY APPLICANT | WEB |
| HVAC FINAL | 02/25/2019 | APPROVED | JHINDMAN |
| TUB SET | 02/21/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS A TEST FOR SHOWER PAN | |||
| TUB SET | 02/20/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: DOOR LOCKED NO ACCESS RESCHEDUAL WHEN ABLE TO GAIN ENTRY | |||
| HVAC ROUGH | 02/05/2019 | APPROVED | JHINDMAN |
| FRAMING | 01/30/2019 | APPROVED | DROCKWELL |
| PLUMBING 2ND ROUGH | 01/29/2019 | APPROVED | JGIBSON |
| ELECTRIC 2ND ROUGH | 01/25/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED REVISION BY ELECTRIC FINAL ON ADDED ELECTRIC | |||
| PLUMBING 2ND ROUGH | 01/25/2019 | PARTIALLY APPROVED | JGIBSON |
| Note: NEED NAIL PLATES IN MULTIPLE AREAS AND NEED TO SEE SHOWER VALVE INSTALLED ALONG WITH TEST ON SHOWER PAN, TWO STACKS NOT HOLDING AIR, 3'' AT W/M AND AT 2'' WHERE PRESSIRE GUAGE IS | |||
| PLUMBING 1ST ROUGH | 01/07/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED REVISION TO SHOW OMITTING OF TWO DRAINS PER OWNER | |||
| MONOLITHIC SLAB | 01/07/2019 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/02/2019 | 04/16/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 02/19/2019 | 03/04/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | CANCEL | 02/19/2019 | 03/04/2019 |
| PLUM | COMPLETE | 02/19/2019 | 03/04/2019 |
| Note: Released By: RLEE | |||
| MECH | COMPLETE | 01/16/2019 | 01/31/2019 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 01/16/2019 | 01/31/2019 |
| Note: Released By: RLEE | |||
| BLD | COMPLETE | 01/16/2019 | 01/30/2019 |
| Note: Released By: JHINDMAN | |||
| FI1 | COMPLETE | 12/18/2018 | 12/18/2018 |
| Note: Released By: DREWIS Ref 2018120438 for sprinkler permit. | |||
| ZON | COMPLETE | 11/27/2018 | 11/28/2018 |
| Note: Released By: JGONZALEZ | |||
| FI1 | HOLD | 11/27/2018 | 12/03/2018 |
| Note: Held By: DREWIS Seperate sprinkler permit from Sprinkler Contractor needed: Sprinkler heads must be moved/added in different areas for coverage purposes, NFPA 13 8.6.2.2.1. This is also stated within the sprinkler legend on sheet A2. Daniel Rewis 986-4736 | |||
| BLD | COMPLETE | 11/27/2018 | 12/11/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 11/02/2018 | 11/05/2018 |
| Note: Held By: JGONZALEZ Revise plans calculation provide for totals do not add up. | |||
| FI1 | HOLD | 11/02/2018 | 11/13/2018 |
| Note: Held By: DREWIS Update Florida Fire Prevention Code to the 6th Edition. Please depict the extiguishers. FFPC 9.9 Middle door must swing with egress, FFPC 101 7.2.1.4.2 Depict the existing sprinklers or if non existing, a seperate permit is needed. Daniel Rewis 986-4736 | |||
| BLD | HOLD | 11/02/2018 | 11/15/2018 |
| Note: Held By: RLEE 1. Provide ADA hardware specifications for the barn doors. 6th ed. FBC A404. 2. Door #4 does not comply with Florida Accessibility COde 2017 6th addotion. Cannot swing over clear floor space of fistures. | |||
| MECH | COMPLETE | 11/02/2018 | 11/15/2018 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 11/02/2018 | 11/15/2018 |
| Note: Released By: RLEE | |||
| BLD | HOLD | 10/10/2018 | 10/22/2018 |
| Note: Held By: JHINDMAN 1. Provide ADA hardware specifications for the barn doors. 6th ed. FBC A404. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 10/10/2018 | 10/15/2018 |
| Note: Released By: DREWIS | |||
| FI1 | HOLD | 10/10/2018 | 10/15/2018 |
| Note: Held By: DREWIS Update Florida Fire Prevention Code to the 6th Edition. Please depict the extiguishers. FFPC 9.9 Depict the existing sprinklers or if non existing, a seperate permit is needed. Daniel Rewis 986-4736 | |||
| MECH | HOLD | 10/10/2018 | 10/24/2018 |
| Note: Held By: RLEE Provide seal and signature of engineer. | |||
| PLUM | HOLD | 10/10/2018 | 10/24/2018 |
| Note: Held By: RLEE Provide seal and signature of engineer. | |||
| UD1 | COMPLETE | 10/10/2018 | 10/10/2018 |
| Note: Released By: CJOHNSON | |||
| ZON | HOLD | 10/10/2018 | 10/11/2018 |
| Note: Held By: JGONZALEZ Held By: JGONZALEZ 1. Will you be offering boarding and kenneling services? What are the planned terms for this service? Will there be overnights stays independent of surgery ?, What types of surgical procedures will be performed in the office? Will the boarding be exclusive to animals having surgical procedures? 2. Provide information in floor plan regarding the percentage of the quite room area are cages; percentage of treatment area is being used to kennel animals; and number of cages per area and sizes. 3. Show on a site plan the purposed area for pet walking in relation to the clinic area. 4. Provide information of disposal of fecal waste and medical waste produced. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/05/2019 |
| REINSPECTION FEE | ¤40.00 | 02/20/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 01/03/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 12/21/2018 |
| ELECTRIC FEE | ¤108.00 | 12/21/2018 |
| ELECTRIC FEE | (¤108.00) | 12/21/2018 |
| ELECTRIC FEE | ¤108.00 | 12/21/2018 |
| MECHANICAL FEE | (¤108.00) | 12/21/2018 |
| MECHANICAL FEE | ¤108.00 | 12/21/2018 |
| MECHANICAL FEE | ¤108.00 | 12/21/2018 |
| PLAN CHECK FEE | ¤100.00 | 12/21/2018 |
| PLAN CHECK FEE | (¤100.00) | 12/21/2018 |
| PLAN CHECK FEE | ¤100.00 | 12/21/2018 |
| PLUMBING FEE | (¤108.00) | 12/21/2018 |
| PLUMBING FEE | ¤108.00 | 12/21/2018 |
| PLUMBING FEE | ¤108.00 | 12/21/2018 |
| SITE PLAN 20 | ¤20.00 | 12/21/2018 |
| SITE PLAN 20 | (¤20.00) | 12/21/2018 |
| SITE PLAN 20 | ¤20.00 | 12/21/2018 |
| SURCHARGE FS 533.721 | (¤5.04) | 12/21/2018 |
| SURCHARGE FS 533.721 | ¤5.04 | 12/21/2018 |
| SURCHARGE FS 533.721 | ¤5.04 | 12/21/2018 |
| SURCHARGE - FS 468.631 | ¤7.56 | 12/21/2018 |
| SURCHARGE - FS 468.631 | (¤7.56) | 12/21/2018 |
| SURCHARGE - FS 468.631 | ¤7.56 | 12/21/2018 |
| ADMIN COMMERCIAL | (¤60.00) | 12/21/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 12/21/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 12/21/2018 |
| INSPECTION - COMMERCIAL ADD | ¤560.00 | 12/21/2018 |
| INSPECTION - COMMERCIAL ADD | (¤560.00) | 12/21/2018 |
| INSPECTION - COMMERCIAL ADD | ¤560.00 | 12/21/2018 |
| CONTRACTOR CHANGE | (¤40.00) | 12/21/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,196.60 |