Permit #2018100770
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00510-0130 |
| CONDITIONED SPACE: 1199 sqft |
| CONDITIONED SPACE: 1199 sqft |
| OPENED PORCH (WITH ROOF) : 199 sqft |
| OPENED PORCH (WITH ROOF) : 199 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| GARAGE: 380 sqft |
| GARAGE: 380 sqft |
| Total Square Footage: 3640 sqft |
| Block: 00510 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: (386)445-9393 |
| Location Address: 23 PRITCHARD DR |
| Type: DU - DUPLEX |
| Issue Date: 11/20/2018 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: NADA OF PALM COAST LLC |
|
Address 13 UTILITY DR PALM COAST, FL 32137 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/27/2019 | FINAL APPROVED | FWILLIS |
| FIREWALL FINAL | 08/13/2019 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 08/13/2019 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC - EARLY POWER | 07/01/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 2:00 | |||
| ROW - STORMWATER FINAL | 06/28/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 06/28/2019 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: sewer clean out pipe had no cap-just red tape-please lower pipe add flush mount clean out cap so as to be flush with sod grades | |||
| ROW - FINAL APRON (AFTER POUR) | 06/28/2019 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/21/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 06/21/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/18/2019 | Disapproved - NO FEE | KHOWELL |
| Note: THIS IS A REINSPECTION NEED ELEVATIONS EVERY 20 FEET MAXIMUM | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/14/2019 | Disapproved - NO FEE | KHOWELL |
| ROW- PROJECT STATUS | 05/31/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: TONY CALLED ABOUT GRADING ISSUE AROUND WATER METERS BETWEEN 21 AND 23, I GAVE GRADE GUY A COUPLE SUGESTIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/17/2019 | APPROVED | RGROSS |
| Note: per contractor. READY TO POUR | |||
| U - SEWER TIE IN | 05/01/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: VIDEO SENT BY PLUMBING CONTRACTOR OF U-TIE IN | |||
| GRAVITY SEWER TEST | 05/01/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/18/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 04/17/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: STUCCO STOP NEEDED AT WALL TO WOOD INTERSECTIONS AT FRONT DOORS. | |||
| INSULATION | 04/10/2019 | APPROVED | JCOLASANTI |
| FIREWALL | 04/02/2019 | APPROVED | JCOLASANTI |
| FIREWALL | 04/01/2019 | CANCELLED BY APPLICANT | JCOLASANTI |
| FIREWALL FINAL | 03/22/2019 | Disapproved - NO FEE | WMILLER |
| Note: NOT READY FOR FINAL... CALL IN WITH ALL-ROUGH AFTER APPROVAL OF FIREWALL | |||
| FIREWALL | 03/22/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NEED TO CONTINUE FIRE WALL TO EVES (INCLUDING DROP OR LEVEL RETURN SOFFITS) 2. SEAL GAPS BETWEEN BOTTOM OF FIRE WALL AND TOP OF LENTIL | |||
| ALL ROUGH | 03/21/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need nail plate water line left side kitchen and right side waste line garage...need fireblock left side master bath drop ceiling FBC 305 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/14/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 02/20/2019 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2019 | PARTIALLY APPROVED | WMILLER |
| Note: THIS IS A PARTIAL ONLY TONY CALLED PRIOR TO MY ARRIVAL TO LET ME KNOW HE ONLY NEEDED ROOF SHEATHING CHECKED SO HE COULD ROOF VALLEY METAL APPROVED ROOF SHEATHING IS APPROVED | |||
| TIE BEAM / LINTEL | 02/04/2019 | APPROVED | MWILLIAMS |
| FOUND SURVEY APPROVED (OFFICE) | 02/01/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 01/14/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/07/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/28/2019 | 02/01/2019 |
| Note: Released By: JHINDMAN Foundation S | |||
| ZON | COMPLETE | 11/13/2018 | 11/13/2018 |
| Note: Released By: TDOAK | |||
| ZON | HOLD | 11/07/2018 | 11/07/2018 |
| Note: Held By: AMOBLEY Please specify the types of replacement trees being used on landscape plan House colors can not be the exact same as the one next door | |||
| PLUM | COMPLETE | 11/07/2018 | 11/11/2018 |
| Note: Released By: RLEE | |||
| MECH | COMPLETE | 11/07/2018 | 11/11/2018 |
| Note: Released By: RLEE | |||
| SWALE | COMPLETE | 10/30/2018 | 10/30/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/22/2018 | 10/29/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 10/22/2018 | 10/25/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 10/22/2018 | 10/30/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 10/22/2018 | 10/29/2018 |
| Note: Held By: JHINDMAN 1. Provide seperate energy calculations for each unit or change form 405 to multi family and 2 units. J. hindman 986-3784. 6th ed. FBC EC R405. | |||
| PLUM | HOLD | 10/22/2018 | 10/29/2018 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser diagram signed by the plumbing contractor with their license number 6th ed. FBC 107.2.1. J. hindman 986-3784. | |||
| SW1 | COMPLETE | 10/22/2018 | 10/25/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 10/22/2018 | 10/29/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 10/22/2018 | 10/22/2018 |
| Note: Held By: AMOBLEY Flood maps were updated 6/6/18. Surveys must have the new information Please specify the types of replacement trees being used on landscape plan House colors can not be the exact same as the one next door |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/02/2019 |
| REINSPECTION FEE | ¤40.00 | 12/02/2019 |
| REINSPECTION FEE | ¤40.00 | 12/02/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤634.00 | 11/20/2018 |
| SITE PLAN 20 | ¤20.00 | 11/20/2018 |
| SURCHARGE FS 533.721 | ¤15.51 | 11/20/2018 |
| SURCHARGE - FS 468.631 | ¤23.27 | 11/20/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/20/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤75.96) | 11/20/2018 |
| ADMIN FEE | ¤20.00 | 11/20/2018 |
| ELECTRIC FEE | ¤250.20 | 11/20/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤13.40) | 11/20/2018 |
| IMPACT FEE FIRE | ¤446.76 | 11/20/2018 |
| IMPACT FEE PARKS | ¤1,698.48 | 11/20/2018 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 11/20/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,532.00 | 11/20/2018 |
| MECHANICAL FEE | ¤250.20 | 11/20/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 11/20/2018 |
| PLAN CHECK FEE | ¤126.80 | 11/20/2018 |
| PLUMBING FEE | ¤250.20 | 11/20/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,527.11 |