Permit #2018100771
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7024-00510-0140 |
| CONDITIONED SPACE: 1199 sqft |
| CONDITIONED SPACE: 1199 sqft |
| GARAGE: 312 sqft |
| GARAGE: 312 sqft |
| OPENED PORCH (WITH ROOF) : 166 sqft |
| OPENED PORCH (WITH ROOF) : 166 sqft |
| OPENED PORCH (WITH ROOF) : 15 sqft |
| OPENED PORCH (WITH ROOF) : 15 sqft |
| Total Square Footage: 3384 sqft |
| Block: 00510 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: (386)445-9393 |
| Location Address: 21 PRITCHARD DR |
| Type: DU - DUPLEX |
| Issue Date: 11/20/2018 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: NADA OF PALM COAST LLC |
|
Address 13 UTILITY DR PALM COAST, FL 32137 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/06/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 01/03/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Breaker 15 Trips when kitchen light is on and GFCI is tested. | |||
| BLD - BUILDING FINAL | 12/31/2019 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 08/13/2019 | FINAL APPROVED | LFITZGERALD |
| ELECTRIC - EARLY POWER | 07/09/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 1:10 | |||
| ELECTRIC - EARLY POWER | 07/03/2019 | Disapproved - NO FEE | RMARTIN |
| Note: NEED TO RELOCATE TREE/BUSH FROM INFRONT OF METER MAIN, CAN NOT ACCESS NOT ENOUGH CLEARANCE NEC 110.26 | |||
| ROW - FINAL APRON (AFTER POUR) | 07/02/2019 | APPROVED | KHOWELL |
| ROW - STORMWATER FINAL | 07/02/2019 | FINAL APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/01/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 07/01/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/18/2019 | Disapproved - NO FEE | KHOWELL |
| Note: THIS IS A REINSPECTION NEED ELEVATIONS AT MIDDLE PART OF BUILDING TO SHOW THAT OUTSIDE GRADE IS AT THE MINIMUM OUTSIDE GRADE IS 4" LOWER THEN THE F.F.E. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/14/2019 | Disapproved - NO FEE | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 05/17/2019 | APPROVED | RGROSS |
| Note: per contractor. READY TO POUR | |||
| U - SEWER TIE IN | 05/01/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: PLUMBER SENT VIDEO OF U-TIE IN | |||
| GRAVITY SEWER TEST | 05/01/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/18/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 04/17/2019 | Disapproved - NO FEE | WMILLER |
| Note: STUCCO STOP NEEDED AT WALL TO WOOD INTERSECTIONS AT FRONT DOORS. | |||
| INSULATION | 04/10/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 04/02/2019 | APPROVED | JCOLASANTI |
| FIREWALL | 04/01/2019 | CANCELLED BY APPLICANT | JCOLASANTI |
| INSULATION | 04/01/2019 | CANCELLED BY APPLICANT | BBEMBRY2 |
| ALL ROUGH | 03/28/2019 | APPROVED - AS NOTED | WMILLER |
| Note: WILL LOOK FOR THE FOLLOWING AT ALL-ROUGH BOTH SIDES NEED... 5 FOOT HEAD SMOKE DETECTOR WITHEN HALLWAY BETWEEN SMALL BEDROOMS ALSO SIDE - B NEEDS PLUMBING NAIL PLATE AT DWV BOTTOM PLATE (GARAGE BESIDE DRYER VENT) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/14/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 02/20/2019 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2019 | PARTIALLY APPROVED | WMILLER |
| Note: THIS IS A PARTIAL ONLY TONY CALLED PRIOR TO MY ARRIVAL TO LET ME KNOW HE ONLY NEEDED ROOF SHEATHING CHECKED SO HE COULD ROOF VALLEY METAL APPROVED ROOF SHEATHING IS APPROVED | |||
| TIE BEAM / LINTEL | 02/04/2019 | APPROVED | MWILLIAMS |
| FOUND SURVEY APPROVED (OFFICE) | 02/01/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 01/14/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/07/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/28/2019 | 02/01/2019 |
| Note: Released By: JHINDMAN Foundation S | |||
| ZON | COMPLETE | 11/14/2018 | 11/15/2018 |
| Note: Released By: TDOAK | |||
| SW1 | COMPLETE | 11/07/2018 | 11/13/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 11/07/2018 | 11/13/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ENGIN1 | COMPLETE | 11/07/2018 | 11/08/2018 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 11/07/2018 | 11/07/2018 |
| Note: Held By: AMOBLEY Please specify the types of replacement trees being used on landscape plan | |||
| PLUM | COMPLETE | 11/07/2018 | 11/11/2018 |
| Note: Released By: RLEE | |||
| MECH | COMPLETE | 11/07/2018 | 11/11/2018 |
| Note: Released By: RLEE | |||
| SWALE | COMPLETE | 10/30/2018 | 10/30/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/22/2018 | 10/29/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 10/22/2018 | 10/25/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 10/22/2018 | 10/30/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 10/22/2018 | 10/29/2018 |
| Note: Held By: JHINDMAN 1. Provide seperate energy calculations for each unit or change form 405 to multi family and 2 units. J. hindman 986-3784. 6th ed. FBC EC R405. | |||
| PLUM | HOLD | 10/22/2018 | 10/29/2018 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser diagram signed by the plumbing contractor with thier signature. 6th ed. FBC 107.3.5. J. hindman 986-3784. | |||
| SW1 | COMPLETE | 10/22/2018 | 10/25/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 10/22/2018 | 10/29/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 10/22/2018 | 10/22/2018 |
| Note: Held By: AMOBLEY Flood maps were updated 6/6/18. Surveys must have the new information Please specify the types of replacement trees being used on landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 11/20/2018 |
| ELECTRIC FEE | ¤243.60 | 11/20/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤13.40) | 11/20/2018 |
| IMPACT FEE FIRE | ¤446.76 | 11/20/2018 |
| IMPACT FEE PARKS | ¤1,698.48 | 11/20/2018 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 11/20/2018 |
| IMPACT FEE TRANSPORTATION | ¤2,532.00 | 11/20/2018 |
| MECHANICAL FEE | ¤243.60 | 11/20/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 11/20/2018 |
| PLAN CHECK FEE | ¤122.40 | 11/20/2018 |
| PLUMBING FEE | ¤243.60 | 11/20/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤612.00 | 11/20/2018 |
| SITE PLAN 20 | ¤20.00 | 11/20/2018 |
| SURCHARGE FS 533.721 | ¤15.05 | 11/20/2018 |
| SURCHARGE - FS 468.631 | ¤22.58 | 11/20/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/20/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤75.96) | 11/20/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,359.76 |