Permit #2018100866

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00030-0090
CONDITIONED SPACE: 2480 sqft
GARAGE: 762 sqft
OPENED PORCH (WITH ROOF) : 367 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
OPENED PORCH (WITH ROOF) : 442 sqft
CONDITIONED SPACE: 384 sqft
Total Square Footage: 4526 sqft
Block: 00030
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 27 NEW WATER OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/27/2020
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0090
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/21/2020 FINAL APPROVED FWILLIS
U-CROSS CONNECTION 10/20/2020 APPROVED LFITZGERALD
U -UTILITY RESIDENTIAL FINAL 10/20/2020 APPROVED - AS NOTED LFITZGERALD
Note: water meter pit is higer than sod by 3-5inches . Rich from utilities is aware -stated to builder superviser Mason- that it would be taken care of soon
ROW FIELD SURVEY /GRADING CERTIFICATION 10/19/2020 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 10/19/2020 APPROVED KHOWELL
ELECTRIC - EARLY POWER 09/29/2020 APPROVED - AS NOTED JMUNSON
Note: Emaikled FPL at 10:15 am
ROW- PRE-APRON (PRE-POUR) 09/17/2020 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON POUR PAVER DRIVEWAY
ROW- PAVER RESTRAINTS 09/17/2020 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 09/16/2020 Disapproved - NO FEE KHOWELL
ROW- PRE-APRON (PRE-POUR) 09/16/2020 Disapproved -FEE REQUIRED KHOWELL
Note: *RIGHT DRIVEWAY APRON FORMED AT 14' NOT 12'. * 4" MINIMUM THICK CONCRETE REQUIRED FOR THE SIDEWALKS. * 5" MINIMUM THICK CONCRETE REQUIRED FOR THE APRONS. * PAD AREAS NEED TO BE COMPACTED.
U - SEWER TIE IN 08/25/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 08/25/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 08/14/2020 APPROVED FWILLIS
INSULATION 08/10/2020 APPROVED JBODEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/06/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Approved Plans noy in the construction Box. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 7/8/20 - Gable bracing missing in Pool House. 2X4 Blocking missing as per plan (page S5) Bearing Wall Detail shows 8" Anchor Bolts with 2 washers at 24"O.C. (page S5) Also shows SP1's on the Bottom. If Truss in garage has been repaired need Eng. Letter. INSPECTION STOPPED.
ALL ROUGH 08/06/2020 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION This Inspection cannot be performed or scheduled before Roof Sheathing, Braces, Ties and down cell Has passed. 7/8/20 - Roof Sheathing, Braces Ties and Down Cell Inspection Failed. All Rough cannot be performed because of failure.
TIE BEAM / LINTEL 07/29/2020 APPROVED FWILLIS
Note: Pool wall
ALL ROUGH 07/08/2020 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION 7/7/20 - This Inspection cannot be performed or scheduled before Roof Sheathing, Braces, Ties and down cell Has passed. 7/8/20 - Roof Sheathing, Braces Ties and Down Cell Inspection Failed. All Rough cannot be performed because of failure, as stated 7/7.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/08/2020 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Approved Plans noy in the construction Box. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 7/8/20 - Gable bracing missing in Pool House. 2X4 Blocking missing as per plan (page S5) Bearing Wall Detail shows 8" Anchor Bolts with 2 washers at 24"O.C. (page S5) Also shows SP1's on the Bottom. If Truss in garage has been repaired need Eng. Letter. INSPECTION STOPPED.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/07/2020 Disapproved -FEE REQUIRED FWILLIS
Note: Approved Plans noy in the construction Box. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
ALL ROUGH 07/07/2020 Disapproved - NO FEE FWILLIS
Note: This Inspection cannot be performed or scheduled before Roof Sheathing, Braces, Ties and down cell Has passed.
ROOF VALLEY & METAL 06/15/2020 APPROVED JDELBONIS
ROOF SHEATHING 05/22/2020 APPROVED JDELBONIS
ELECTRIC-TUG 05/22/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 11:07 am
TIE BEAM / LINTEL 05/15/2020 APPROVED JDELBONIS
FOUND SURVEY APPROVED (OFFICE) 05/14/2020 APPROVED TBAKER
MONOLITHIC SLAB 05/04/2020 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION no compation report 5/4/20 all set i looked at this on my way in
MONOLITHIC SLAB 05/01/2020 Disapproved - NO FEE JDELBONIS
Note: no compation report
PLUMBING 1ST ROUGH UNDERGROUND 04/28/2020 APPROVED - AS NOTED JGIBSON
Note: NEED TO REPAIR STEM WALL AND MISSING STEEL IN FOOTERS WHERE OUT OF PLACE
FOOTER 04/09/2020 APPROVED JDELBONIS
WATER METER INSTALLATION REQUEST 04/08/2020 APPROVED - AS NOTED CSTONE
Note: already installed
ROW - FINAL INSPECTION FINAL APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) APPROVED KHOWELL

Review History

Department Status Date In Date Out
BLD COMPLETE 07/28/2020 08/04/2020
Note: Released By: JBODEN
ZON COMPLETE 05/14/2020 05/14/2020
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 05/14/2020 05/14/2020
Note: Released By: TBAKER
ZON COMPLETE 03/20/2020 03/20/2020
Note: Released By: ELENS Repeat Comments: Must have banding around all windows facing the right of way (front and right side) On floor plan page the total calculations do not add up correctly
SW1 COMPLETE 03/20/2020 03/20/2020
Note: Released By: CTROHA
ENGIN1 COMPLETE 03/20/2020 03/24/2020
Note: Released By: TBAKER
UD1 COMPLETE 03/20/2020 03/25/2020
Note: Released By: AHALL
LOCATE COMPLETE 03/20/2020 03/24/2020
Note: Released By: CSTONE
ZON COMPLETE 11/01/2018 11/02/2018
Note: Released By: AMOBLEY
ELEC COMPLETE 11/01/2018 11/06/2018
Note: Released By: DREWIS
BLD COMPLETE 11/01/2018 11/08/2018
Note: Released By: RLEE
URB COMPLETE 10/24/2018 10/26/2018
Note: Released By: JBEAUDET
BLD HOLD 10/23/2018 10/30/2018
Note: Held By: JHINDMAN 1. Provide new S-4 and S-5 sheets that are designed to the 6th edition Florida Building Code.
ELEC HOLD 10/23/2018 10/29/2018
Note: Held By: DREWIS Provide load calculations, NEC 2014 220. Daniel Rewis 986-4736
ENGIN1 COMPLETE 10/23/2018 10/30/2018
Note: Released By: TBAKER
MECH COMPLETE 10/23/2018 10/30/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 10/23/2018 10/30/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 10/23/2018 10/29/2018
Note: Released By: DREWIS
UD1 COMPLETE 10/23/2018 10/29/2018
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON HOLD 10/23/2018 10/24/2018
Note: Held By: AMOBLEY Must have banding around all windows facing the right of way (front and right side) On floor plan page the total calculations do not add up correctly

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/14/2020
REINSPECTION FEE ¤40.00 10/14/2020
REINSPECTION FEE ¤40.00 10/14/2020
REINSPECTION FEE ¤40.00 10/14/2020
NEW RESIDENTIAL INSPECTIONS ¤772.00 03/27/2020
SITE PLAN 20 ¤20.00 03/27/2020
SURCHARGE FS 533.721 ¤18.41 03/27/2020
SURCHARGE - FS 468.631 ¤27.62 03/27/2020
STORM WATER PERMIT FEES ¤80.00 03/27/2020
3% TRANS IMPACT FEE CREDIT (¤89.43) 03/27/2020
ADMIN FEE ¤20.00 03/27/2020
ELECTRIC FEE ¤291.60 03/27/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 03/27/2020
IMPACT FEE FIRE ¤223.38 03/27/2020
IMPACT FEE PARKS ¤849.24 03/27/2020
IMPACT FEE SCHOOL ¤3,600.00 03/27/2020
IMPACT FEE TRANSPORTATION ¤2,981.00 03/27/2020
MECHANICAL FEE ¤291.60 03/27/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 03/27/2020
PLAN CHECK FEE ¤154.40 03/27/2020
PLUMBING FEE ¤291.60 03/27/2020
Fees Total Due: ¤0.00 Total Paid: ¤9,659.24