I want to search for...
Permit #2018100866
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00030-0090 |
| CONDITIONED SPACE: 2480 sqft |
| GARAGE: 762 sqft |
| OPENED PORCH (WITH ROOF) : 367 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| CONDITIONED SPACE: 384 sqft |
| Total Square Footage: 4526 sqft |
| Block: 00030 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 27 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/27/2020 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/21/2020 | FINAL APPROVED | FWILLIS |
| U-CROSS CONNECTION | 10/20/2020 | APPROVED | LFITZGERALD |
| U -UTILITY RESIDENTIAL FINAL | 10/20/2020 | APPROVED - AS NOTED | LFITZGERALD |
| Note: water meter pit is higer than sod by 3-5inches . Rich from utilities is aware -stated to builder superviser Mason- that it would be taken care of soon | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/19/2020 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 10/19/2020 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 09/29/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emaikled FPL at 10:15 am | |||
| ROW- PRE-APRON (PRE-POUR) | 09/17/2020 | PARTIALLY APPROVED | KHOWELL |
| Note: SIDEWALK AND APRON POUR PAVER DRIVEWAY | |||
| ROW- PAVER RESTRAINTS | 09/17/2020 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 09/16/2020 | Disapproved - NO FEE | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 09/16/2020 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: *RIGHT DRIVEWAY APRON FORMED AT 14' NOT 12'. * 4" MINIMUM THICK CONCRETE REQUIRED FOR THE SIDEWALKS. * 5" MINIMUM THICK CONCRETE REQUIRED FOR THE APRONS. * PAD AREAS NEED TO BE COMPACTED. | |||
| U - SEWER TIE IN | 08/25/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 08/25/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 08/14/2020 | APPROVED | FWILLIS |
| INSULATION | 08/10/2020 | APPROVED | JBODEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/06/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Approved Plans noy in the construction Box. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 7/8/20 - Gable bracing missing in Pool House. 2X4 Blocking missing as per plan (page S5) Bearing Wall Detail shows 8" Anchor Bolts with 2 washers at 24"O.C. (page S5) Also shows SP1's on the Bottom. If Truss in garage has been repaired need Eng. Letter. INSPECTION STOPPED. | |||
| ALL ROUGH | 08/06/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION This Inspection cannot be performed or scheduled before Roof Sheathing, Braces, Ties and down cell Has passed. 7/8/20 - Roof Sheathing, Braces Ties and Down Cell Inspection Failed. All Rough cannot be performed because of failure. | |||
| TIE BEAM / LINTEL | 07/29/2020 | APPROVED | FWILLIS |
| Note: Pool wall | |||
| ALL ROUGH | 07/08/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION 7/7/20 - This Inspection cannot be performed or scheduled before Roof Sheathing, Braces, Ties and down cell Has passed. 7/8/20 - Roof Sheathing, Braces Ties and Down Cell Inspection Failed. All Rough cannot be performed because of failure, as stated 7/7. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/08/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION Approved Plans noy in the construction Box. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 7/8/20 - Gable bracing missing in Pool House. 2X4 Blocking missing as per plan (page S5) Bearing Wall Detail shows 8" Anchor Bolts with 2 washers at 24"O.C. (page S5) Also shows SP1's on the Bottom. If Truss in garage has been repaired need Eng. Letter. INSPECTION STOPPED. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2020 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Approved Plans noy in the construction Box. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| ALL ROUGH | 07/07/2020 | Disapproved - NO FEE | FWILLIS |
| Note: This Inspection cannot be performed or scheduled before Roof Sheathing, Braces, Ties and down cell Has passed. | |||
| ROOF VALLEY & METAL | 06/15/2020 | APPROVED | JDELBONIS |
| ROOF SHEATHING | 05/22/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 05/22/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 11:07 am | |||
| TIE BEAM / LINTEL | 05/15/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 05/14/2020 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/04/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION no compation report 5/4/20 all set i looked at this on my way in | |||
| MONOLITHIC SLAB | 05/01/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: no compation report | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/28/2020 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO REPAIR STEM WALL AND MISSING STEEL IN FOOTERS WHERE OUT OF PLACE | |||
| FOOTER | 04/09/2020 | APPROVED | JDELBONIS |
| WATER METER INSTALLATION REQUEST | 04/08/2020 | APPROVED - AS NOTED | CSTONE |
| Note: already installed | |||
| ROW - FINAL INSPECTION | FINAL APPROVED | KHOWELL | |
| ROW - FINAL APRON (AFTER POUR) | APPROVED | KHOWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/28/2020 | 08/04/2020 |
| Note: Released By: JBODEN | |||
| ZON | COMPLETE | 05/14/2020 | 05/14/2020 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 05/14/2020 | 05/14/2020 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 03/20/2020 | 03/20/2020 |
| Note: Released By: ELENS Repeat Comments: Must have banding around all windows facing the right of way (front and right side) On floor plan page the total calculations do not add up correctly | |||
| SW1 | COMPLETE | 03/20/2020 | 03/20/2020 |
| Note: Released By: CTROHA | |||
| ENGIN1 | COMPLETE | 03/20/2020 | 03/24/2020 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 03/20/2020 | 03/25/2020 |
| Note: Released By: AHALL | |||
| LOCATE | COMPLETE | 03/20/2020 | 03/24/2020 |
| Note: Released By: CSTONE | |||
| ZON | COMPLETE | 11/01/2018 | 11/02/2018 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 11/01/2018 | 11/06/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 11/01/2018 | 11/08/2018 |
| Note: Released By: RLEE | |||
| URB | COMPLETE | 10/24/2018 | 10/26/2018 |
| Note: Released By: JBEAUDET | |||
| BLD | HOLD | 10/23/2018 | 10/30/2018 |
| Note: Held By: JHINDMAN 1. Provide new S-4 and S-5 sheets that are designed to the 6th edition Florida Building Code. | |||
| ELEC | HOLD | 10/23/2018 | 10/29/2018 |
| Note: Held By: DREWIS Provide load calculations, NEC 2014 220. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 10/23/2018 | 10/30/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 10/23/2018 | 10/30/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 10/23/2018 | 10/30/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 10/23/2018 | 10/29/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 10/23/2018 | 10/29/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 10/23/2018 | 10/24/2018 |
| Note: Held By: AMOBLEY Must have banding around all windows facing the right of way (front and right side) On floor plan page the total calculations do not add up correctly |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/14/2020 |
| REINSPECTION FEE | ¤40.00 | 10/14/2020 |
| REINSPECTION FEE | ¤40.00 | 10/14/2020 |
| REINSPECTION FEE | ¤40.00 | 10/14/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤772.00 | 03/27/2020 |
| SITE PLAN 20 | ¤20.00 | 03/27/2020 |
| SURCHARGE FS 533.721 | ¤18.41 | 03/27/2020 |
| SURCHARGE - FS 468.631 | ¤27.62 | 03/27/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/27/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 03/27/2020 |
| ADMIN FEE | ¤20.00 | 03/27/2020 |
| ELECTRIC FEE | ¤291.60 | 03/27/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/27/2020 |
| IMPACT FEE FIRE | ¤223.38 | 03/27/2020 |
| IMPACT FEE PARKS | ¤849.24 | 03/27/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/27/2020 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 03/27/2020 |
| MECHANICAL FEE | ¤291.60 | 03/27/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/27/2020 |
| PLAN CHECK FEE | ¤154.40 | 03/27/2020 |
| PLUMBING FEE | ¤291.60 | 03/27/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,659.24 |